Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹1.7 Cr+₹10,492.76 (0.06%)Rejected-Finance | L2 | Rejected-Finance High |
| Sl No | Description | Qty | Unit | Smti Kipa Para L2 | M/s T. Chunnu Enterprise L1 |
|---|---|---|---|---|---|
| 1.00SH : Maintenance of School Ground. | |||||
| 2.00 | Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. | 2,623.19 | Cum | 210 ₹5,50,869.9 | 206 ₹5,40,377.14 Lowest |
| 3.00SH : 20 bedded (Bunkbed) Girls Hostel | |||||
| 4.00SH : I : Earth Work | |||||
| 5.00 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders up to 30 cm size, lift up to 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 251.88 | Cum | 353 ₹88,913.64 Lowest | 353 ₹88,913.64 Lowest |
| 6.00 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 24.7 | Cum | 1,200 ₹29,640 Lowest | 1,200 ₹29,640 Lowest |
| 7.00SH : II : CONCRETE WORK | |||||
| 8.00Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: | |||||
| 9.00 | a) Foundations and plinth : | 17.6 | Cum | 9,500 ₹1,67,200 Lowest | 9,500 ₹1,67,200 Lowest |
| 10.00SH : III : RCC Work | |||||
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
13 Mar 2026, 4:00 pmClosed
EE, Doimukh Division, APPWD, Doimukh.
O/o the EE, Doimukh Division, APPWD, Doimukh.
Maintenance of School Ground and construction of Library, along with 2-unit Toilet and 20 bedded (Bunkbed) Girls Hostel at Govt. Secondary School, Basarnallo, Sangdupota Circle.
2026_PWDAP_3030_1
DD/2025-26/20
Open Tender
Civil Works
Item Rate
730 days
Basarnallo
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Doimukh
₹1.7 L
28 Oct 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH : Maintenance of School Ground. | - | - | - | - |
| 2 | Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m. | 2,623.19 | Cum | - | - |
| 3 | SH : 20 bedded (Bunkbed) Girls Hostel | - | - | - | - |
| 4 | SH : I : Earth Work | - | - | - | - |
| 5 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders up to 30 cm size, lift up to 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 251.88 | Cum | - | - |
| 6 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 24.7 | Cum | - | - |
| 7 | SH : II : CONCRETE WORK | - | - | - | - |
| 8 | Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: | - | - | - | - |
| 9 | a) Foundations and plinth : | 17.6 | Cum | - | - |
| 10 | SH : III : RCC Work | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_3230.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
SBD.pdf
Tender Documents • 14.09 MB
BOQ_3230.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .