Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted As per Second Lowest. |
| 3 | L2₹8.5 LSame as L1Rejected-Finance | ₹8.5 LSame as L1 | L2 | Rejected-Finance Due to similar rate quote lottery is done. Bid is not selected in lottery. Hence, Not Accepted As per Second Lowest. |
Tender Value
₹10.0 L
EMD Value
₹99,825
Closing Date
12 May 2026, 3:00 pmClosed
C.E.3
Zone 3
imp. Nali Of Babu purwa colony 299 infront of shubham shivastav house in ward 80 Zone 3
2026_NNKAN_1145735_1
698/A.A.3/25-26
Open Tender
Civil Works
Fixed-rate
imp. Nali Of Babu purwa colony 299 infront of shub
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,825
8 Jul 2026
6 May 2026
12 May 2026
6 May 2026
12 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed etc all comp. | - | Sqm | 67 | - |
| 2 | Dismantling of brick work or stone work in lime or cement mortar and including stacking of materials etc all comp. | - | Cum | 580 | - |
| 3 | Earth Work in surface excavation by mechanical means (Hydraulic excavator)/manual means foundation trenches or drain etc all comp | - | Sqm | 170 | - |
| 4 | Providing and laying in position cement concrete of specified grade exing the cost of centering and shuttering 1:6:12 (1 cement:6 coars sand:12 graded brick etc all comp. | - | Cum | 4,380 | - |
| 6 | R.C.C. Slab Work in open foundation 1:1.5:3 With cement C-sand & 20 mm stone grit ballast including shuttering mat lab etc all comp | - | Cum | 8,600 | - |
| 7 | M.S or tor steel (12-16) mm dia iron work in renforcement cutting Bending and binding including etc all comp. | 1 | qtl | 7,200 | ₹7,192.8 |
| 8 | centering and shuttering inculding strutting propping etc all comp. | - | sqm | 390 | - |
| 9 | Sale of material of old bricks etc all comp. | - | Nos | 7.2 | - |
| 10 | sale of material of old brick bats etc all comp. | - | Cum | 1,200 | - |
| 11 | Cartage of earth up to 3.00 km incliding loading & unloading etc all comp | 0.4 | Cum | 116.96 | ₹46.67 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2142093.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.30 MB
BOQ_2142093.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .