Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
6 Oct 2026, 3:00 pmClosed
CWA(WnS)II
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE CHIEF WATER ANALYST (WnS)- II HAIDERPUR WATER WORKS DELHI 110085
Repairing and Servicing of 03 nos. leak detectors and absorption systems at Pre and Post Chlorination points (North and South) at Water Treatment Plant Haiderpur Phase-II under C.W.A. (WnS)-II.
2026_DJB_299116_1
NIT No. 12 (26-27)/CWA(WnS)II
Open Tender
Miscellaneous Works
Works
120 days
HAIDERPUR WATER WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Online sabpaisa portal Allahabad Bank
₹50,000
28 Sept 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
6 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Repairing and Servicing of Centrifugal Blower
Repairing and Servicing of Blower Motor
Winding of Motor Coil
Change the Terminal Plates and Bush | 2 | Nos. | - | - |
| 2.01 | Repairing and Servicing of Agitator Assembly by replacement of Shaft and Impeller
Winding Coil prepared and installed in motor
Change the Terminal Plates of motor
Oiling and Greasing of Motor
Grinding and Finishing of Agitator Assembly | 3 | Nos. | - | - |
| 3.01 | Repairing and Servicing of Blower Ducting Line. | 3 | Job | - | - |
| 4.01 | Repairing, Servicing/Replacement of Caustic Re Circulation Pump
Overhauling of Caustic Pump
Winding work of Caustic Pump Motor
Oiling and Greasing of Motor and PP Pump
Fabrication of Base Frame of Caustic Re circulation Pump | 3 | Nos. | - | - |
| 5.01 | Providing and Installation of Complete Centrifugal Blower, MSFRP of Capacity 10 HP with Induction Motor, III Phase, MS FRP Impeller | 1 | No. | - | - |
| 6.01 | Repair and Service of Hose pipe and Hoods | 3 | Job | - | - |
| 7.01 | Providing and Installation of Chlorine Leak Detectors with Electrolyte Chemical Sensor
Range- 0-10 PPM
Cable- Coaxial Cable | 6 | Nos. | - | - |
| 8.01 | Repairing of Control Panel for Blower, Caustic Pump, Agitator, Leak Detectors and Hooters with starters, relays ampere meter, volt meter push button and LED light etc. | 3 | Nos. | - | - |
| 9.01 | Supply and Installation of Cabling Blower 3 Core, 4 Sq MM-45 Mtrs, Cabling of Caustic Pump 3 Core, 2.5 Sq MM – 40 Mtrs, Cabling of Leak Detection System 2 Core 1.5 Sq MM – 40 Mtrs, Cabling Tonner Room Hooter – 60 Mtrs, Cabling of Hooter up to Control Room with Supporting wire – 1.5 Km | 3 | Job | - | - |
| 10.01 | Supply and Installation of Industrial Hooter for Tonner Room North, Tonner Room South, control Room Location with LED Bulb. | 6 | Nos. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
NITNO12doc.pdf
Tender Documents • 1.88 MB
BOQ_399153.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .