Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹16.3 L+₹35,975 (2.25%)Accepted-Finance | L2 | Accepted-Finance BOQ Accepted |
Tender Value
₹14.9 L
EMD Value
₹14,900
Closing Date
29 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer/Mechanical-I
O/o SE/MI/TTPS
SE/MI/TTPS/119/2020-2021
2020_EB_169665_1
119ECHP-II-Complete overhauling of Rotary Breaker
Open Tender
Miscellaneous Works
Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,900
1 Jul 2020
24 Jun 2020
30 Jun 2020
24 Jun 2020
29 Jun 2020
24 Jun 2020
90 days
Complete overhauling of rotating parts in drive unit of rotary breaker rectification works in the Tire, Guide wheel and support wheel, replacement of sheared bed bolt at non drive end side, complete alignment work and trial run in the Rotary Breaker-2B at PCH-II
Labour charges for dismantling the Primary Crusher side, top, end cover plate, refuse chute. Leading and lifting Rotary breaker by using hydraulic jack and lowering the refuse chute and bend chute to the Primary Crusher-2B floor by using chain block arrangements etc.,
Blue matching and checking the rotary breaker tire rotating portion on both sides contact with the support wheel assembly to check the maximum contact on rotary breaker tire by rotating the rotary breaker by using chain blocks. Grinding the rough area of tire contacting portion on both sides and uneven surfaces are correcting the tire matching with the support wheel assembly by rotating the rotary breaker by using chain blocks and arresting the rotor at each and every rotation. Removal of 40 no's tire fixing clamps and its supports on both sides and supporting arrangements made by using 4 no's chain blocks at each and every corner's of rotor on both sides and heating source given on the tire fixing portion on both sides (drive/ non drive) and then removal of and Jack arrangements. Removal of tire due to minimum contact (25%) of tire on support wheel assembly.
Charges for cutting the I beam of size 250 x 100 in 7mtr length of 2 no's providing temporary gallery for working both side of the hopper. Lifting the I beams such that to rest the hopper on I beam welding both side I beams with the main beams. Fabrication of rest pads welding the rest pads with hopper beam bolts tightness and welding I beam, releasing the chain blocks.
Labour charges for supporting the spider cone 2 Nos. and dismantling 18 Nos. rail beams, lowering and stacking the rail beam in the ground floor dismantling feed end spider, discharge end spider and lowering the discharge end spider cone into the ground floor including fabrication of necessary supports required.
Labour charges for lifting the discharge end spider cone/ feed end spider cone from the ground floor to the Primary Crusher floor, moving near to the Primary Crusher bed area with necessary supports etc. including the hire charges for higher capacity crane, special tools and plants etc.
Charges for leading, shifting the tire from PC 2B location to loading point and then unloading the 2 nos tire (OD - 2870mm) from crusher floor (20mtr height) to ground floor by using chain block and then loading on to lorry for complete machining the tire at workshop. (outside of TTPS) and providing chain block and rope arrangement and then unloading the 2 nos tire (2870 mm - OD) at loading point of workshop (outside of TTPS) and leading, shifting to working location and loading the 1no Rotary breaker tire (2870mm - OD) on the heavy duty lathe by loading chain block arrangement and balancing, a centering aligning the tire by using special holding device, fixtures ready for rough area machining work and machining the rough and harden surface of the tire (OD 2870mm face width 152 mm) by operating slow speed of lathe to a smooth surface for metal build up purpose, since the tire surface area was reduced due to uneven wear & tear of tire surface material cost required for metal build up on the machining surface to welding with over coated - S welding electrodes and loading the metal build up wheel for machining on the heavy duty lathe, centering, aligning the wheel and then machining the wheel to suit the OD 2870mm ø by slow speed operation of lathe unloading the 2 no's wheel assembly after machining work from the heavy duty lathe, leading and shifting the job to the loading point and loading the machined 2 no's tire wheel assembly to a department lorry at loading point by using chain block arrangements at workshop (outside of TTPS) and unloading in primary crusher house-II area inside the TTPS by using chain blocks and after completion of machining the tire, then the tire fitted on both sides and refixing of 40 no's tire fixing clamps and its supports on both sides and supporting arrangements made by using 4 no's chain blocks at each and every corner's of rotor on both sides and heating source given on the tire fixing portion on both sides (drive/ non drive) and then properly fixing of tires on both sides and ovality of tire checking by using dial cage arrangements and finally proper fixing of tires on both sides of PC-2B.
Labour charges for removal of support wheel assembly from the bed and dismantling its assembly by using chain block arrangements etc., cleaning and storing useful spares in the section store. Loading & unloading the worn out support wheel with shaft from TTPS to work shop. Setting the support wheel with shaft in the lathe and then reduce the bearing seating area by machining the dia 135 mm to 133 mm and 150 mm long. Unloading the support wheel with shaft from lathe and then bring the pulley to a spot where metal to be built up by welding over the machined surface at bearing seating area. Metal build up by welding from133 mm to 137 mm on machined surface on bearing seating area by using special welding electrode. Charges required checking the trueness of the support wheel with shaft Loading the support wheel with shaft from work shop and unloading at TTPS.
Charges for unloading the 2 no's support wheel assembly (non drive side) from a height of 18 m at PC 2B location (approx. 4 Ton) and loading the wheel assembly 2 no's to a lorry by using chain blocks sent for machining work out side TTPS area work shop. Providing chain blocks and rope arrangements and then unloading the 2 no's support wheel assembly (4 ton approx.) from the lorry at workshop (outside of TTPS) and leading near to work spot (approx. - 15 meter distance). Loading the 1 no support wheel (approx.2 ton) on the heavy duty lathe by using chain block arrangement and balancing & centring and aligning the wheel ready for machining work. Machining the rough & harden surface of the support wheel by operating slow speed of lathe to a smooth surface for metal build up in propose since the wheel surfaces area was reduced due to uneven wear & tear of wheel surface. Material cost required for metal build up in the machined surface to welding with over cord -s- welding electrode. Loading the metal build up wheel for machining on the heavy duty lathe, centring, aligning the wheel and then machining the wheel to suit the OD 768mm ø by slow speed operation of lathe. Unloading the 2 no's wheel assembly after machining work from the heavy duty lathe, leading and shifting the job to the loading point. Loading the machined 2 no's support wheel assembly to a lorry at loading point by using chain block arrangements at workshop (outside of TTPS) and unloading in primary crusher house-II area inside the TTPS by using chain blocks.
Removal of damaged guide wheels on both sides and complete cleaning and overhauling of guide wheels and replacing the worn-out spares and checking the guide wheel freeness etc. Reconditioning of wornout portion in the guide wheel by metal filling with special electrode.
Dismantling the exiting damaged R.C.C pedestal in required areas and disposed off from the site including labour, lead and lift etc., complete.
Labour charges for fitting the support wheel assembly on the bed, including lifting by using chain block arrangements, measuring, checking, preparing and assembling spares, positioning on bed, checking its alignment etc.
Checking the face out of rotary breaker rotating sides on drive side by fixing the dial gauge arrangements and then rotating the rotary breaker by using chain block arrangements by step by step (10 rotation). Checking the face out of rotary breaker rotating sides on non drive side by fixing the dial gauge arrangements and then rotating the rotary breaker by using chain block arrangements by step by step (10 rotation). Charge for lifting, levelling and correcting the rotor sides and centering the rotor non drive side and finally proper aligning the rotor.
Strengthening of bed frame structure by welding to improve the bed frame structure by providing stiffness in various sides of bed frame structure. Complete cleaning and inspection and then checking by existing motor bed frames, welding portions by deep groove taken then full welding with one run welding.
Providing full tightness checking of remaining all the screen plates in all 10 rows and providing bolt & nuts in the longitudinal beam and tightness checking with torque wrench and renew the bolts if any damage found etc., by each and every rotation of PC-2B (10 Nos rotation). Checking all the 20 Numbers lifting shelves and tightness checking of all lifting shelves bolts & nuts fixed in the longitudinal beam by using torque wrench and renew the damaged bolt if any found by each and every rotation of rotary breaker PC-2B. Checking all the five numbers deflector plates and providing full tightness in all deflector plates bolts & nuts fixed in the screen plate with torque wrench and renew the damaged bolts if any by seeing every rotation of rotary breaker of PC-2B and providing proper supports at every rotation.
Grinding and checking and then measuring the motor top bed frames and checking the micro meter finishing on top surfaces by carrying out blue matching on motor and gear box by each and every time loading and unloading the motor and gearbox. Leading and shifting the motor gear box on the top of bed frame and then fixing of gear box cooling fan, fluid coupling etc., and providing all bolts and nuts by using chain block arrangements. Alignment with respect to motor with gear box and gear box to motor carried out by proper dial setting and also fabrication of alignment instruments fixing frames etc.,
Labour charges for fitting the side, top & end cover plates, chain covers, refuse chute etc. including lifting from ground floor, reconditioning the damaged MS plates, positioning, fitting the cover plate using new bolts and nuts etc. providing gasket around the crusher ends.
Labour charges for inspecting and aligning the support wheel position and contact surface of support wheel with spider cone tire by adjusting the bed bolts of support wheels and lock bolts. Conducting trail run of PC-2B.
C.ABDULLA ENGINEERING CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .