Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-Finance MOHAL WARD NO 10 ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹10.4 Cr | L1 | Accepted-Finance l1 |
| 2 | L2₹10.9 CrRejected-Finance MIRZAPUR UTTAR PRADESH | ₹10.9 Cr | L2 | Rejected-Finance l2 |
| 3 | L3₹11.8 CrRejected-Finance | ₹11.8 Cr | L3 | Rejected-Finance l3 |
| 4 | L4₹11.8 CrRejected-Finance | ₹11.8 Cr | L4 | Rejected-Finance l4 |
| 5 | L5₹12.0 CrRejected-Finance 52 H NEW COLONY ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹12.0 Cr | L5 | Rejected-Finance l5 |
| Sl No | Description | Qty | Unit | M/s UTSAV ENTERPRISES L6 | shree kant singh L5 | M/S HAZRAT ALI L1 | DESCON INFRASTRUCTURES PRIVATE LIMITED L9 | RAM SANEHI AND SONS L12 | SHAKUNTALA SINGH L10 | M/s Shyamdhar Enterprises L13 | M/S JAGDISH SARAN L3 | ASHTBHUJA CONSTRUCTION L11 | M/s A.K. Associates L8 | M/S SATYA PRAKASH SINGH CONSTRUCTION CO L4 | M/S RAJ COMPANY AND SUPPLIERS L14 | MS RAKESH KUMAR PANDEY L2 | M/S PANDEY ENTERPRISES L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.asper MOR&TH spec clause 201,and Sl 2.3. | 68,200 | Sqm | 4,09,200 ₹4.1 L | 4,77,400 ₹4.8 L | 3,33,498 ₹3.3 L | 2,72,800 ₹2.7 L | 3,41,000 ₹3.4 L | 21,14,200 ₹21.1 L | 5,72,880 ₹5.7 L | 34,100 ₹34,100 | 4,66,488 ₹4.7 L | 3,41,000 ₹3.4 L | 3,41,000 ₹3.4 L | 5,79,700 ₹5.8 L | 2,72,800 ₹2.7 L | 4,36,480 ₹4.4 L |
| 2.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. Asper MOR&TH spec clause 305.4.3 (ii) | 10,401 | Sqm | 31,203 ₹31,203 | 52,005 ₹52,005 | 25,586.46 ₹25,586.46 | 31,203 ₹31,203 | 41,604 ₹41,604 | 1,76,817 ₹1.8 L | 43,164.15 ₹43,164.15 | 20,802 ₹20,802 | 35,779.44 ₹35,779.44 | 1,04,010 ₹1.0 L | 31,203 ₹31,203 | 44,204.25 ₹44,204.25 | 20,802 ₹20,802 | 33,283.2 ₹33,283.20 |
| 3.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m asper MOR&TH spec. clause 301. | 6,222 | cum | 2,67,546 ₹2.7 L | 2,35,191.6 ₹2.4 L | 2,03,334.96 ₹2.0 L | 3,48,432 ₹3.5 L | 3,11,100 ₹3.1 L | 11,82,180 ₹11.8 L | 3,54,654 ₹3.5 L | 3,73,320 ₹3.7 L | 2,84,718.72 ₹2.8 L | 4,35,540 ₹4.4 L | 2,17,770 ₹2.2 L | 3,55,276.2 ₹3.6 L | 1,86,660 ₹1.9 L | 2,61,324 ₹2.6 L |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 94,279 | cum | 1,03,70,690 ₹1.0 Cr | 1,16,18,943.96 ₹1.2 Cr | 1,01,27,450.18 ₹1.0 Cr | 90,50,784 ₹90.5 L | 1,69,70,220 ₹1.7 Cr | 76,36,599 ₹76.4 L | 1,74,41,615 ₹1.7 Cr | 1,60,274.3 ₹1.6 L | 1,41,79,561.6 ₹1.4 Cr | 47,13,950 ₹47.1 L | 37,71,160 ₹37.7 L | 1,74,41,615 ₹1.7 Cr | 80,13,715 ₹80.1 L | 1,32,93,339 ₹1.3 Cr |
| 5.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 6,222 | cum | 2,92,434 ₹2.9 L | 2,55,102 ₹2.6 L | 2,23,992 ₹2.2 L | 3,73,320 ₹3.7 L | 3,11,100 ₹3.1 L | 2,86,212 ₹2.9 L | 3,67,098 ₹3.7 L | 3,73,320 ₹3.7 L | 3,13,588.8 ₹3.1 L | 3,11,100 ₹3.1 L | 1,86,660 ₹1.9 L | 3,73,320 ₹3.7 L | 2,17,770 ₹2.2 L | 2,92,434 ₹2.9 L |
| 6.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 14,131 | cum | 16,25,065 ₹16.3 L | 18,22,899 ₹18.2 L | 15,82,530.69 ₹15.8 L | 13,49,510.5 ₹13.5 L | 24,02,270 ₹24.0 L | 22,18,567 ₹22.2 L | 26,99,021 ₹27.0 L | 7,06,550 ₹7.1 L | 22,15,740.8 ₹22.2 L | 9,89,170 ₹9.9 L | 7,06,550 ₹7.1 L | 27,13,152 ₹27.1 L | 12,01,135 ₹12.0 L | 20,77,257 ₹20.8 L |
| 7.00 | Construction of granular sub-base by providing close graded Material, Gr-V mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | 8,054 | cum | 1,50,69,034 ₹1.5 Cr | 1,32,72,992 ₹1.3 Cr | 1,14,82,104.56 ₹1.1 Cr | 1,93,29,600 ₹1.9 Cr | 2,09,40,400 ₹2.1 Cr | 2,01,35,000 ₹2.0 Cr | 2,00,54,460 ₹2.0 Cr | 1,53,02,600 ₹1.5 Cr | 1,60,75,784 ₹1.6 Cr | 1,61,08,000 ₹1.6 Cr | 96,64,800 ₹96.6 L | 2,00,54,460 ₹2.0 Cr | 96,64,800 ₹96.6 L | 1,50,69,034 ₹1.5 Cr |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 8,288 | cum | 1,56,89,184 ₹1.6 Cr | 1,38,24,384 ₹1.4 Cr | 1,19,53,036.48 ₹1.2 Cr | 2,03,05,600 ₹2.0 Cr | 2,15,48,800 ₹2.2 Cr | 2,16,31,680 ₹2.2 Cr | 2,08,19,456 ₹2.1 Cr | 1,65,76,000 ₹1.7 Cr | 1,67,35,129.6 ₹1.7 Cr | 1,82,33,600 ₹1.8 Cr | 1,16,03,200 ₹1.2 Cr | 2,08,44,320 ₹2.1 Cr | 1,07,74,400 ₹1.1 Cr | 1,56,89,184 ₹1.6 Cr |
| 9.00 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 55,517 | Sqm | 16,65,510 ₹16.7 L | 16,65,510 ₹16.7 L | 12,53,018.69 ₹12.5 L | 12,21,374 ₹12.2 L | 19,43,095 ₹19.4 L | 24,98,265 ₹25.0 L | 21,09,646 ₹21.1 L | 22,20,680 ₹22.2 L | 17,54,337.2 ₹17.5 L | 16,65,510 ₹16.7 L | 11,10,340 ₹11.1 L | 21,65,163 ₹21.7 L | 11,10,340 ₹11.1 L | 16,09,993 ₹16.1 L |
| 10.00 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 55,517 | Sqm | 4,99,653 ₹5.0 L | 4,99,653 ₹5.0 L | 3,64,746.69 ₹3.6 L | 5,27,411.5 ₹5.3 L | 6,10,687 ₹6.1 L | 7,21,721 ₹7.2 L | 6,19,014.55 ₹6.2 L | 5,55,170 ₹5.6 L | 5,10,756.4 ₹5.1 L | 6,66,204 ₹6.7 L | 3,88,619 ₹3.9 L | 6,24,566.25 ₹6.2 L | 3,33,102 ₹3.3 L | 4,44,136 ₹4.4 L |
Tender Value
₹19.0 Cr
EMD Value
₹30 L
Closing Date
9 Apr 2026, 12:00 pmClosed
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
W S OF VARANASI SHAKTINAGAR MARG SH 5A TELGUDWA MOD TO SALAIBANAWA RAILWAY STATION MARG ODR INCLUDING 5 YEAR MAINTENANCE UP TO 2 POINT 5 PERCENT OF CONSTRUCTION COST
2026_CEMRZ_1132835_1
5772/53 COM MZP CIRCLE 2025 DATE 19.12.2025
Open Tender
Civil Works
365 days
EE PD PWD SONBHADRA
AS PER NIT
3 documents required · 3 mandatory
₹2,720
Yes
₹30 L
Yes
22 Apr 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
9 Apr 2026
3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.asper MOR&TH spec clause 201,and Sl 2.3. | - | Sqm | - | - | item1 |
| 2 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. Asper MOR&TH spec clause 305.4.3 (ii) | - | Sqm | - | - | item2 |
| 3 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m asper MOR&TH spec. clause 301. | - | cum | - | - | item3 |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | - | cum | - | - | item4 |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | - | cum | - | - | item5 |
| 6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | - | cum | - | - | item6 |
| 7 | Construction of granular sub-base by providing close graded Material, Gr-V mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 | - | cum | - | - | item7 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | cum | - | - | item8 |
| 9 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | - | Sqm | - | - | item9 |
| 10 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | - | Sqm | - | - | item10 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.18 MB
SBD.pdf
Tender Documents • 2.30 MB
BOQ_2114485.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid