| Sl No | Description | Qty | Unit | CK Constructions H2 | AV CONSTRUCTION H1 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complyi | 34.86 | m2 | 266 ₹9,272.76 Lowest | 275 ₹9,586.5 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part of cement, four part of M.sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour ch | 5.08 | m2 | 5,734 ₹29,128.72 Lowest | 5,750 ₹29,210 |
| 3.00Supplying and errecting steel centering to sides and soffits including supports and strutting for side wall sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm | |||||
| 3.01 | compound wall | 113.81 | m2 | 495 ₹56,335.95 Lowest | 505 ₹57,474.05 |
| 3.02 | PUMP ROOM | 81.35 | m2 | 978 ₹79,560.3 Lowest | 985 ₹80,129.75 |
| 4.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | 19.59 | m3 | 7,512 ₹1,47,160.08 Lowest | 7,600 ₹1,48,884 |
| 5.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 895.37 | kg | 93 ₹83,269.41 Lowest | 98 ₹87,746.26 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix (one cement one and half fine aggregates and three coarse aggregates) for concrete works using 20mm size ISS HBG metal including cost and conveyance of all materials to site including all labour charges for concrete mixing, laying, vibrating, watering and curing properly etc., complying with standard specification. | 10.22 | m3 | 9,445 ₹96,527.9 Lowest | 9,500 ₹97,090 |
| 7.00 | Plastering with cement mortar 1:5 mix 12 mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications. | 261 | m2 | 304 ₹79,344 Lowest | 310 ₹80,910 |
| 8.00 | Painting two coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete. | 261 | m2 | 263 ₹68,643 Lowest | 275 ₹71,775 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
26 Sept 2025, 3:00 pmClosed
Executive Officer
33, Kulakarai Street, Kilpennathur Tiruvannamalai District
Construction of Compound wall to Kilpennathur Kulakari Street OHT and Pump Room in Kilpennathur Town Panchatyat.
2025_DTP_608024_1
707-2/2025
Open Tender
Civil Works - Water Works
Works
180 days
Kilpennathur Town panchayat Limit
V and above
2 documents required · 2 mandatory
₹0
₹8,000
13 Aug 2026
23 Sept 2025
26 Sept 2025
23 Sept 2025
26 Sept 2025
23 Sept 2025
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complyi
Plain Cement Concrete 1:4:8 Mix (one part of cement, four part of M.sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour ch
Supplying and errecting steel centering to sides and soffits including supports and strutting for side wall sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm
compound wall
PUMP ROOM
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications.
Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Reinforced cement concrete 1:1.5:3 mix (one cement one and half fine aggregates and three coarse aggregates) for concrete works using 20mm size ISS HBG metal including cost and conveyance of all materials to site including all labour charges for concrete mixing, laying, vibrating, watering and curing properly etc., complying with standard specification.
Plastering with cement mortar 1:5 mix 12 mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Painting two coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete.
Supplying and fixing of M.S grill of approved design for doors, windows and ventilators using necessary mild steel flats for inner and outer memebers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications.
Supply and Delivery Fabrication of MS doors and windows with outer frame and shutter frame in MS angle of size 40mm x 40mm x 6 mm with MS flat 25mm x 25mm x 6mm and MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locking arrangements including two coats of approved enamel paint over coat of red oxide including cost of angles, plates, sheets, fabrication charges, cost of hold fast and transportation charges etc., complete. (TWAD 22-23 P.NO: 91
Doors - Fully Panelled Double Leaf
Windows - Fully Panelled Double Leaf
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
CK Constructions (BID ID -1473360)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_726656.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .