Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.2 LAccepted-AOC 9 187 KATTURKOTTAI UTHIRAKIDIKAVAL KALAPPPANAYAKKENPATTY NAMAKKAL 637404 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637404 | L1 | Accepted-AOC L1 | |
| 2 | L2₹83.6 L+₹1.4 L (1.76%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical 53 MIDDLE STREET ARUMALAI TIRUKOILUR VILLUPURAM DISTRICT | VILLUPURAM | TAMIL NADU | 604001 | - | Rejected-Technical Not responsive | |
| 4 | Rejected-Technical NO 4 239 RASIPURAM MAIN ROAD THANDAVARAYAPURAM POST ATTUR TALUK SALEM | ATTUR | SALEM | TAMIL NADU | - | Rejected-Technical Not responsive | |
| 5 | Rejected-Technical 38 2 PALLIVASAL STREET SANDAPET TIRUKOILUR 605766 | TIRUKOILUR | VILLUPURAM | TAMIL NADU | 605766 | - | Rejected-Technical Not responsive |
| Sl No | Description | Qty | Unit | ASR CONSTRUCTIONS L3 | Sri Annamar Construction L1 | Shri Maruthi Constructions L5 | Mariiyam Constructions L4 | AMD OVERSEAS IMPEX INDIA PRIVATE LIMITED L2 | Kuberan & Co L6 | SPPS CONSTRUCTION INDIA PRIVATE LIMITED L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00BUILDING WORK | ||||||||||
| 1.01 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by SIPCOT officers. | 215 | Cum | 190 ₹40,850 | 184.35 ₹39,635.25 Lowest | 246 ₹52,890 | 318 ₹68,370 | 220.5 ₹47,407.5 | 280 ₹60,200 | 377.6 ₹81,184 |
| 1.02 | Gravel Filling - Supply and filling in foundation basement etc with filliing gravel in layers of not more than 1m thick well waterte,rammed and consolidated etc. complete complying with standard specification and as directed by SIPCOT officers. | 35 | Cum | 400 ₹14,000 | 423 ₹14,805 | 120 ₹4,200 Lowest | 447 ₹15,645 | 443.5 ₹15,522.5 | 300 ₹10,500 | 3,245 ₹1,13,575 |
| 1.03 | Supplying and filling in foundation and basement with sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the SIPCOT Officers. | 40 | Cum | 250 ₹10,000 | 217.12 ₹8,684.8 | 120 ₹4,800 Lowest | 1,500 ₹60,000 | 1,572 ₹62,880 | 1,900 ₹76,000 | 3,127 ₹1,25,080 |
| 1.04 | Providing and laying Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken granite stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated, curing and cost and conveyance of all materials to site etc. complete complying with standard specification and as directed by SIPCOT Officers. | 26 | Cum | 5,000 ₹1,30,000 | 4,221.86 ₹1,09,768.36 Lowest | 5,100 ₹1,32,600 | 4,634 ₹1,20,484 | 4,638 ₹1,20,588 | 5,000 ₹1,30,000 | 7,434 ₹1,93,284 |
| 1.05 | Refilling with excavated earth other than crushed stone sand with an initial head load of 100 mtrs and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed,watered and consolidated etc., complete complying with standard specification and as directed by SIPCOT Officers. | 30 | Cum | 45 ₹1,350 | 35.92 ₹1,077.6 Lowest | 45 ₹1,350 | 137 ₹4,110 | 38 ₹1,140 | 40 ₹1,200 | 342.2 ₹10,266 |
| 1.06Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials) etc., complete complying with standard specification and as directed by SIPCOT officers. | ||||||||||
| 1.07 | In foundation and basement | 61 | Cum | 6,500 ₹3,96,500 Lowest | 7,241 ₹4,41,701 | 7,800 ₹4,75,800 | 7,572 ₹4,61,892 | 7,202 ₹4,39,322 | 7,300 ₹4,45,300 | 8,850 ₹5,39,850 |
| 1.08 | Ground floor | 45 | Cum | 6,750 ₹3,03,750 Lowest | 7,351 ₹3,30,795 | 7,800 ₹3,51,000 | 7,492 ₹3,37,140 | 7,321 ₹3,29,445 | 7,400 ₹3,33,000 | 8,850 ₹3,98,250 |
| 1.09 | First floor | 40 | Cum | 7,000 ₹2,80,000 Lowest | 7,569 ₹3,02,760 | 8,000 ₹3,20,000 | 7,995 ₹3,19,800 | 7,553 ₹3,02,120 | 7,500 ₹3,00,000 | 9,204 ₹3,68,160 |
Tender Value
₹1.0 Cr
EMD Value
₹62,300
Closing Date
24 Sept 2026, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
superintending engineer
SIPCOT Head office, Egmore chennai
Construction of Customs office and AO block in (utility area) at SIPCOT Industrial Park (SEZ) A.Sathanur, Kallakurichi District
2026_SIPCT_701469_2
NIT.No.23 NIT.No.23/CD/T.No.23/2026-27
Open Tender
Civil Works
Lump-sum
SIPCOT Industrial Park A.Sathanur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹62,300
29 Oct 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING WORK | |||||
| 1.01 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by SIPCOT officers. | 215 | Cum | - | - |
| 1.02 | Gravel Filling - Supply and filling in foundation basement etc with filliing gravel in layers of not more than 1m thick well waterte,rammed and consolidated etc. complete complying with standard specification and as directed by SIPCOT officers. | 35 | Cum | - | - |
| 1.03 | Supplying and filling in foundation and basement with sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the SIPCOT Officers. | 40 | Cum | - | - |
| 1.04 | Providing and laying Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken granite stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated, curing and cost and conveyance of all materials to site etc. complete complying with standard specification and as directed by SIPCOT Officers. | 26 | Cum | - | - |
| 1.05 | Refilling with excavated earth other than crushed stone sand with an initial head load of 100 mtrs and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed,watered and consolidated etc., complete complying with standard specification and as directed by SIPCOT Officers. | 30 | Cum | - | - |
| 1.06 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials) etc., complete complying with standard specification and as directed by SIPCOT officers. | - | - | - | - |
| 1.07 | In foundation and basement | 61 | Cum | - | - |
| 1.08 | Ground floor | 45 | Cum | - | - |
| 1.09 | First floor | 40 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
tenderdocument.pdf
Tender Documents • 0.95 MB
BOQ_847809.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .