Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹12.9 LSame as L1Accepted-Finance AT KANTABALLAVPUR PO JAGATSINGHPUR DIST JAGATSINGHPUR PIN 754103 | JAGATSINGHPUR | JAGATSINGHPUR | ODISHA | 754103 | L2 | Accepted-Finance ok | |
| 3 | Rejected-Technical | - | Rejected-Technical As per Proceeding | |
| 4 | Rejected-Technical | - | Rejected-Technical As per Proceeding | |
| 5 | Rejected-Technical | - | Rejected-Technical As per Proceeding |
Tender Value
₹12.7 L
EMD Value
₹12,800
Closing Date
6 Jul 2026, 5:00 pmClosed
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
OFFICE OF THE JAGATSINGHPUR
Construction of paver road from Gochhayat Sahi Jitan Singh residence towards Babula Gochhayat house of Ward No-05 in Jagatsinghpur Municipality
2026_ORULB_132780_5
JSPURM-EO-Tender-05/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Construction of paver road from Gochhayat Sahi Jit
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹12,800
Yes
22 Oct 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing cement concrete including stacking the useful materials for reuse and removing the debries within 50m lead as per direction of E.I.C. | 0.8 | cum | 858.58 | ₹686.86 |
| 2 | Earth work in excavation of foundation in all kinds of soil within initial lead and lift including rough dressing braking clods and levelling the bed etc. complete as per the direction of EIC. | 36 | cum | 299.53 | ₹10,783.08 |
| 3 | Earth work in all kinds of soil within initial lead and lift including rough dressing braking clods and levelling the bed etc complete as per the direction of EIC. | 50 | cum | 249.61 | ₹12,480.5 |
| 4 | Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC. | 46.5 | cum | 575.43 | ₹26,757.5 |
| 5 | C.C.( 1:3:6) using 4Cm size C.B.H.G. metal including cost, carriage,royalty hire chargesof mixture machine & taxes etc. complete(No hand mixing hire chargesof mixture machine & taxes etc. complete(No hand mixing allowed) as per the direction of the Engineer-in-charge. | 12 | cum | 6,829.24 | ₹81,950.88 |
| 6 | R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering,cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 46.13 | sqm | 6,944.8 | ₹3,20,363.62 |
| 7 | Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete. | 18.45 | sqm | 8,887.98 | ₹1,63,983.23 |
| 8 | C.C.M 20 using 12 mm size H.G. chips including centering,shuttering, cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 2 | sqm | 6,944.8 | ₹13,889.6 |
| 9 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (Foundation & Plinth) | 360 | sqm | 248.57 | ₹89,485.2 |
| 10 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (Foundation & Plinth) | 50 | sqm | 1,206.63 | ₹60,331.5 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_597678.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_597678.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .