Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹80,000
EMD Value
₹1,600
Closing Date
9 Feb 2022, 4:30 pmClosed
xen rew kathua
xen rew kathua
Constt. of roof top water harvesting structure near hospital chandal 4th call
2022_RDPR_158948_2
e-NIT No. 311/REW/K of 2021 Dated 01/02/2022
Open Tender
Civil Works
Item Rate
30 days
bani
sbd
2 documents required · 2 mandatory
₹500
Yes
xen rew kathua
₹1,600
Yes
12 Feb 2022
1 Feb 2022
10 Feb 2022
2 Feb 2022
9 Feb 2022
2 Feb 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth for 1 meter from cutting edge and disposal of surplus excavated earth as directed:
All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) (Including all leads and lifts carriages of material by MT/HL)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (Including all leads and lifts carriages of material by MT/HL)
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand)
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)(Including all leads and lifts carriages of material by MT/HL)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level , Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-charge.75mm nominal outer dia pipes.
Filling with stone /bajri in the tank for filteration including carriage complete within 10km
Add cost of sign Board
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .