Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹31.9 L
EMD Value
₹64,000
Closing Date
2 Dec 2026, 5:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Visvesvaraya Jala Nigam Limited
N Reddy
Shifting of Existing HT & LT Lines from Vaderahalli, Katenahalli limits in the name of Assistant Executive Engineer, Yettinahole Project Sub Division No. 05 VJNL, Koaratagere in Kolala Section of Koratagere sub division under self execution basis.
VJNL/2026-27/TL/WORK_INDENT536
VJNL/2026-27/TL/WORK_INDENT536
Open
Transmission Line
Two Tender Document System(Two Cover)
VJNL Division YP NO 4 Office Madhugiri
9 documents required · 9 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Satisfactorily completed (at least 90% of contract value) as prime contractor, at least one similar work such as Shifting/Construction /Modification of 11 KV or Above Transmission Electrical line of value not less than Rs. 16.00 lakhs in last financial years i.e from FY 2021-22 to 2025-26. An additional weightage of 10% for each year will be added to the cost of work done to bring it to the present price level. The work done certificate should be obtained from competent authority not below the rank of Executive Engineer or equivalent in case of Government under taking
Valid Class-1 electrical contractors license issued by Govt of Karnataka
Valid Employees Provident Fund Registration Certificate along with latest paid challan copy
Scanned signature of the bidder / authorized representative in case of a firm or company, to be attached while uploading the bid documents. Also in case of authorized representative, scanned copy of power of attorney should be uploaded
Tenderers who meet the above specified minimum eligibility and Prequalification criteria, will only be qualified if their available tender capacity is more than the total tender value. The available bid Capacity is calculated as under. Assessed available tender Capacity:(AXNX2.5 - B) where A:Maximum value of works Executed in any one year during the last five years (updated to FY 2026-27 price level) taking into account the completed as well as works in progress. N-0.25, Number of years prescribed for completion of the works for which bids are invited.B :Value at FY 2026-27 price level of existing commitments and on-going works to be completed during the next 06 Months.(Period of completion of the works for which Tenders are invited) (upto 2026-27) FY in which the tenders are invited.
The tenderer/firm/company shall furnish details of liquid assets and or availability of credit facilities of Rs.9.60 Lakhs for the work mentioned above for meeting the required funds in the form of credit lines / line of credit / certificate from Scheduled /nationalized Bank in the prescribed format. The line of Credit shall be in the form of Prescribed under section 10
Achieved in at least two financial years an average annual financial turnover (in all classes of electrical works only) of Rs. 31.87 Lakhs (in all classes of Electrical engineering construction works only) NOTE: - Audited balance sheets/Profit and loss statement and Turnover certificate duly certified by Chartered accountant with their unique document identification number (UDIN) generated by ICAI portal should be uploaded. The certificate without UDIN will not be considered Financial turnover of previous years will be given a weightage of 10% per year based on the rupee value to bring them to Present price levels
Income Tax returns of last 5 financial years. (ie FY 2021-22 to 2025-26)
Copy of the PAN card with GSTIN
₹800
₹64,000
18 Nov 2026
18 Nov 2026
4 Dec 2026
26 Nov 2026
180 days
Shifting of Existing HT & LT Lines from Vaderahalli, Katenahalli limits in the name of Assistant Executive Engineer, Yettinahole Project Sub Division No. 05 VJNL, Koaratagere in Kolala Section of Koratagere sub division under self execution basis.
Spun pole 11 mtr Long-500KG WL-Material cost
PSCC Pole 9 Mtr Long-200 Kg WL-Material cost
11 kV Horizontal Cross Arm with clamps, HTST Supports, Bolt, nuts and washer for PSCC Pole 9M long-Material cost
Special 3 Pin cross arms complete GI for using for spun pole-Material cost
11 Kv 5 KN Polymeric pin insulators (24 mum dis FRP Rod)-Material cost
11 KV 45 KN Disc Insulators for Dead End-Material cost
4 pin Cross arm with clamp-Material cost
1.1 kv pin insulator with Gl Pin-Material cost
No 8. Kv Strain insulator-Material cost
Guy sets Complete with No 15 Strain Insulator & Concreting Materials-Material cost
Spiral Earth Electrodes-Material cost
Guy concreting With boulders, Mud, and Sand-Material cost
Rabbit ACSR Conductor-Material cost
11 KV 99 Sq mm AAAC (AL 7), Covered Conductor-Material cost
Supply & Providing Insulated Piercing Connector-Material cost
Supply & Providing Alignment Tie-Material cost
Supply & Providing Wedge Connectors-Material cost
Shifting of 100 KVA DTC with New Poles & 9 Structure set, earthing etc (Using 4 Star DT) -Material cost
Earthing materials pipe type for grounding-Material cost
1.1 kV, 3 Phase Aerial Bunched Cable of size 3x95+1x70+1x16 Sqmm Street Light-Material cost
Piercing connector suitable for 16 Sqmm- 95 Sqmm AB Cable - Service Connections-Material cost
Suspension Clamp Assembly 16 to 70 mm(Excluding pole clamp and Eye Hook)-Material cost
Dead End Clamp or Anchor Clamp Assembly 25 to 95 Sqmm(excluding pole clamps and Eye hook)-Material cost
Pole clamp for HT/LT AB cable-Material cost
Universal Hook, Bolts and nuts-Material cost
End cap for 50 or 70 Sqmm-Material cost
Eye Hook (Flat type) for fixing Clamps-Material cost
Spun pole 11 mtr Long-500Kg WL-Labour cost
PSCC Pole 9 Mtr Long-200 Kg WL-Labour cost
11 kV Horizontal Cross Arm with clamps, HTST Supports, Bolt, nuts and washer for PSCC Pole 9M long-Labour cost
Special 3 Pin cross arms complete GI for using for spun pole-Labour cost
4 pin Cross arm with clamp-Labour cost
Guy sets Complete with No 15 Strain Insulator & Concreting Materials-Labour cost
Spiral Earth Electrodes-Labour cost
Guy concreting With boulders, Mud, and Sand-Labour cost
Rabbit ACSR Conductor-Labour cost
11 KV 99 Sq mm AAAC (AL 7), Covered Conductor-Labour cost
Supply & Providing Insulated Piercing Connector-Labour cost
Supply & Providing Alignment Tie-Labour cost
Supply & Providing Wedge Connectors-Labour cost
Shifting of 100 KVA DTC with New Poles & 9 Structure set, earthing etc (Using 4 Star DT) -Labour cost
Earthing materials pipe type for grounding-Labour cost
1.1 kV, 3 Phase Aerial Bunched Cable of size 3x95+1x70+1x16 Sqmm Street Light-Labour cost
Piercing connector suitable for 16 Sqmm- 95 Sqmm AB Cable - Service Connections-Labour cost
Suspension Clamp Assembly 16 to 70 mm(Excluding pole clamp and Eye Hook)-Labour cost
Dead End Clamp or Anchor Clamp Assembly 25 to 95 Sqmm(excluding pole clamps and Eye hook)-Labour cost
Pole clamp for HT/LT AB cable-Labour cost
Universal Hook, Bolts and nuts-Labour cost
End cap for 50 or 70 Sqmm-Labour cost
Digging of 2.5Mtr pit erection of Spun Pole on Hard Rock-Labour cost
Concreting of Spun poles & miscellaneous-Labour cost
R & R Rabbit Conductor @ 190%-Labour cost
Releasing of PCC 8 mt @ 90%-Labour cost
R & R Horizontal Cross Arm @ 190%-Labour cost
R & R 11 KV pin insulators-Labour cost
R &R Disc Insulators-Labour cost
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
INDENT536.doc
Tender Document • 8.06 MB
NIT 13 Pole shifting.pdf
Instructions to Tenderers • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .