| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC work order |
| 2 | L2₹1.4 Cr+₹3.9 L (2.91%)Rejected-Finance | ₹1.4 Cr+₹3.9 L (2.91%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | R THANGARAJ L1 | R KUPPUSAMY CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Renewal of the road from Poovayepalayam - Asaripudur road to Periyapatty road. .Km 0/0-1/600 (VPR 189) H/O Puliyamarathukkottai Estimate Amounts :3167000 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,899.6 | Sqm | 6.1 ₹11,587.56 Lowest | 6.6 ₹12,537.36 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 841.32 | cum | 140.45 ₹1,18,163.39 Lowest | 145 ₹1,21,991.4 |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 5.00 | KM 0/0 - 1/0 | 23.08 | Sqm | 4,448.06 ₹1,02,661.22 Lowest | 5,000 ₹1,15,400 |
| 6.00 | KM 1/0 - 1/600 | 17.24 | Sqm | 4,437.98 ₹76,510.78 Lowest | 4,800 ₹82,752 |
| 7.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 8.00 | KM 0/0 - 1/000 | 2.87 | Sqm | 5,131.06 ₹14,726.14 Lowest | 5,500 ₹15,785 |
| 9.00 | KM 1/0 - 1/600 | 1.68 | Sqm | 5,120.98 ₹8,603.25 Lowest | 5,500 ₹9,240 |
| 10.00Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | |||||
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
24 Feb 2026, 3:00 pmClosed
THE PROJECT DIRECTOR, DRDA DINDIGUL
DRDA, DINDIGUL
Strengthening of 3 No of Roads under CGF 2026- 2027 in Oddanchatram Block of Dindigul District TN05-07
2026_RDTN_663425_1
DIPR/1084/TENDER/2026
Open Tender
Civil Works
Item Wise
180 days
DRDA
Strengthening of 3 No of Roads under CGF 2026- 2027 in Oddanchatram Block of Dindigul District TN05-07
3 documents required · 3 mandatory
₹0
₹1.5 L
25 Mar 2026
21 Feb 2026
24 Feb 2026
21 Feb 2026
24 Feb 2026
21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the work : 1. Renewal of the road from Poovayepalayam - Asaripudur road to Periyapatty road. .Km 0/0-1/600 (VPR 189) H/O Puliyamarathukkottai Estimate Amounts :3167000 | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,899.6 | Sqm | - | - |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 841.32 | cum | - | - |
| 4 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | - | - | - | - |
| 5 | KM 0/0 - 1/0 | 23.08 | Sqm | - | - |
| 6 | KM 1/0 - 1/600 | 17.24 | Sqm | - | - |
| 7 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | - | - | - | - |
| 8 | KM 0/0 - 1/000 | 2.87 | Sqm | - | - |
| 9 | KM 1/0 - 1/600 | 1.68 | Sqm | - | - |
| 10 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 0.77 MB
BOQ_796484.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .