| 1 | R1₹6.2 LAccepted-AOC | ₹6.2 L | R1 | Accepted-AOC Lowest Value |
| 2 | R2₹6.2 LRejected-Finance | ₹6.2 L | R2 | Rejected-Finance Quoted higher than estimate rate |
| Sl No | Description | Qty | Unit | B Sabari Contractor L2 | G Selvam L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drama stage at Karunagarampattu in Meyyur Panchayat in Arni Block under MLACDS scheme 2024-2025. | |||||
| 1.01 | Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B | 14.55 | Cum | 250 ₹3,637.50 | 246 ₹3,579.30 |
| 1.02 | Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete. | 7.44 | Cum | 5,110 ₹38,018.40 | 5,108 ₹38,003.52 |
| 1.03 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 3.65 | Cum | 5,945 ₹21,699.25 | 5,943 ₹21,691.95 |
| 1.04 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 16.2 | Cum | 45 ₹729 | 42 ₹680.40 |
| 1.05 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 36 | Sqm | 160 ₹5,760 | 155 ₹5,580 |
| 1.06Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels, | |||||
| 1.07 | Below ground level | 20.87 | Sqm | 518 ₹10,810.66 | 517 ₹10,789.79 |
| 1.08 | Above ground level | 76.46 | Sqm | 1,036 ₹79,212.56 | 1,034 ₹79,059.64 |
| 1.09 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 1.5 | MT | 89,936 ₹1.3 L | 89,935 ₹1.3 L |
Tender Value
₹6.3 L
EMD Value
₹6,300
Closing Date
3 Oct 2024, 3:00 pmClosed
Block Development Officer(B.Pt)
Block Development Office(B.Pt) Arni
Construction of Drama stage at Karunagarampattu in Meyyur Panchayat in Arni Block under MLACDS scheme 2024-2025
2024_RDTN_488346_2
Roc.No.A6/4800/2024 Date 13.08.2024 and 05.09.2024 ARNI58
Open Tender
Civil Works - Buildings
90 days
Arni
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,300
27 Dec 2025
26 Sept 2024
3 Oct 2024
26 Sept 2024
3 Oct 2024
26 Sept 2024
Amount
Construction of Drama stage at Karunagarampattu in Meyyur Panchayat in Arni Block under MLACDS scheme 2024-2025.
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
Below ground level
Above ground level
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Rainforcement Cement Concrete 1:1½:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof.te.
Speical Plastering in Cement mortar 1:3 mix 10 mm thick including cost and conveyace of all materials and all labour charges,etc,
Plastering with CM 1:5, 12mm thick over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Colour Washing with best Distempering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing,preparing the surface and etc.,complete.
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (New) including cost and all labour charges etc. complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
B Sabari Contractor (BID ID -1149553)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid