| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC 144 A THOTTIPALAYAM MUTHUR ERODE 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹1.1 Cr | L1 | Accepted-AOC Work order issued to Bidder L1 Divya Dharshini and Co, Thottiyapalayam. |
| 2 | L2₹1.1 Cr+₹1.4 L (1.27%)Rejected-Finance 15 CHINNAMUTHUR MUTHUR POST KANGEYAM TALUK TIRUPPUR DISTRICT 638 105 | TIRUPPUR | TAMIL NADU | 638105 | ₹1.1 Cr+₹1.4 L (1.27%) | L2 | Rejected-Finance Amount Quoted is little higher compared to other bidders. So rejecting Price bid in this stage |
| 3 | L3₹1.2 Cr+₹2.4 L (2.13%)Rejected-Finance | ₹1.2 Cr+₹2.4 L (2.13%) | L3 | Rejected-Finance Amount Quoted is little higher compared to other bidders. So rejecting Price bid in this stage |
| 4 | L4₹12.3 Cr+₹11.2 Cr (982.9%)Rejected-Finance | ₹12.3 Cr+₹11.2 Cr (982.9%) | L4 | Rejected-Finance Amount Quoted is little higher compared to other bidders. So rejecting Price bid in this stage |
| 5 | Rejected-Technical | - | - | Rejected-Technical No proper Documents. Technically not Qualified |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
12 Dec 2023, 3:00 pmClosed
Executive Officer
Muthur
Strengthening of BT Road at Thottiyapalayam Saliyankattupallam (via) Nagapalayam Udaiyam Road in Muthur Town Panchayat
2023_DTP_394847_1
190/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Thottiyapalayam to Udaiyam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.4 L
Yes
6 Jan 2024
1 Dec 2023
12 Dec 2023
1 Dec 2023
12 Dec 2023
1 Dec 2023
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Collection,supply and filling of Well gravel from approved quarry to work site and stocking to the Departmental gauge for premeasurement as directed by the Departmental Engineer, to required depth not more than 15cm depth including cost and Conveyance o
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for required thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in unifor
Providing and laying Priming coat 7Kg / 10 Sq.m over WMM surface using of SSI Emulsion Bitumen for 10 Sq.m and cost Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cast as per special condition appended includi
Providing and laying Tack coat 2.50 Kg / 10 Sq.m over Wet Mix Mecadam surface using of RS1 Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special conditi
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per
Plain Cement Concrete 1:4:8 Mix (one part cement, four part Msand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sh
Vibrated Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges
Suppying fabricating and placing in position steel reinforcement using ISI TMT rods for all RCC works as per the design given including cost of steel and binding wire also in all floors steel and binding wire shell be supplied by the contractor complying
Vibrated Reinforcement cement concrete 1:1.5:3 (One part of cement one and half part of sand and three part of aggregate) using machine crushed 20mm guage HBGS jelly including cost and conveyance of all materials to site and all labour charges etc., Co
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Road marking with Hot Applied ThermoPlastic Compound with Reflectorising Glass Beads on Bituminious Surface Proving and Laying of Hot Applied thermoplastic Compound 2.5 mm thick inculding reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm
MAINTENANCE
Towards the charges for routine maintenance of the road work executed under NABARD SCHEME including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per M
Upkeeping 1st year (50%)
Upkeeping 2nd year (60%)
Upkeeping 3rd year (60%)
Upkeeping 4th year (60%)
Upkeeping 4th year (60%)
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms.
Upkeeping for 1st year (40%)
Upkeeping for 2nd year (40%)
Upkeeping for 3rd year (40%)
Upkeeping for 4th year (40%)
Upkeeping for 5th year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503
4 th year 3%
5 th year 5%
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating
4 th year 3%
5 th year 5%
senbagam construction
K K AND SONS CONSTRUCTION
DPM SREE MURUGAN AND CO
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .