| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.9 LAccepted-AOC | ₹61.9 L | L1 | Accepted-AOC Lowest |
| 2 | Rejected-Technical 6 2 SIVAN NORTH CAR STREET PALAYAMKOTTAI TIRUNELVELI 2 | - | - | Rejected-Technical Not Responsive |
| Sl No | Description | Qty | Unit | MR.E.MARIAPPAN, CONTRACTOR L1 |
|---|---|---|---|---|
| 1.10 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
a). Narrow Foundations - First Depth Upto 2m | 113 | m3 | 246 ₹27,798 |
| 1.20 | b). Plinth Beam | 58 | m3 | 102 ₹5,916 |
| 2.00 | Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 24 | m3 | 420 ₹10,080 |
| 3.00 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 198 | m3 | 327 ₹64,746 |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 30 | m3 | 5,472 ₹1.6 L |
| 5.00 | Plain Cement concrete 1:2:4 (One cement Two M sand and four broken Machine crushed stone jelly) using HBG Machine crushed stone jelly of size 20mm gauge for founding and basement including de- watering if found necessary and laid in layers of not more than 15cms thick etc., complete | 14 | m3 | 6,922 ₹96,908 |
| 6.10 | Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 350Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone sand (M- Sand) but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. a). Foundation & Basement | 35 | m3 | 8,643 ₹3.0 L |
| 6.20 | b). Ground Floor | 50 | m3 | 8,774 ₹4.4 L |
| 7.00 | Supplying and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 9,350 | Kg | 89.8 ₹8.4 L |
| 8.00 | Supplying and erecting centering for vertical plain / RCC concrete walls of supply channel, retaining wall etc upto 90Cm height with necessary supports,all cross bracing with mild steel size of 90cm x60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x25 mm x3mm for bearing laid silver Oak/ Country wood joist of size 7.50 cm x5.0 cm spaced @ about 90 cm C/C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C/C etc,, complete complaying with standered specfications and as directed by the departmental officers. - Plinth Beam | 139 | m2 | 494 ₹68,666 |
Tender Value
₹75 L
EMD Value
₹75,000
Closing Date
11 Aug 2025, 3:00 pmClosed
Executive Officer Moolaikaraipatti Town Panchayat
23 Middle Street West Street, Moolaikaraipatti
Construction of Additional Building in Urban Public Health Centre (UPHC) Under 15th FC Health Grant in Moolakaraipatti Town Panchayat.
2025_DTP_586936_1
356/2025
Open Tender
Civil Works - Buildings
180 days
Moolaikaraipatti
As per Norms
2 documents required · 2 mandatory
₹0
₹75,000
25 Mar 2026
30 Jul 2025
11 Aug 2025
30 Jul 2025
11 Aug 2025
30 Jul 2025
30 Jul 2025 - 11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Hospital75bid.pdf
Tender Documents • 0.30 MB
BOQ_701075.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid