Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.9 LAccepted-Finance R O VILL NARAIN P O SHARONTHA TEHSIL TIKKAR DISTT SHIMLA HP | SHIMLA | HIMACHAL PRADESH | 170009 | ₹14.9 L | L-1 | Accepted-Finance 1 |
| 2 | L-2₹15.2 LRejected-Finance HIMACHAL PRADESH | ₹15.2 L | L-2 | Rejected-Finance 2 |
Tender Value
₹14.6 L
EMD Value
₹29,237
Closing Date
16 Apr 2026, 5:00 pmClosed
Executive Engineer
HPPWD Rohru
R R Damage on Taloti Breshtu road KM 0 00 to 4 00 SH C O R Wall in PCC at RD 3 900 3 923
2026_PWD_134018_4
14-113 dated 2-4-26
Open Tender
Civil Works - Roads
120 days
Rohru
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹29,237
16 Jun 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
16 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 within all leads and lifts as per directions of Engineer in charge | - | Per Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earthwork in excavation for structures upto 3 depth as per as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.as directed by the Engineer-in-Change | - | Per Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Plain/reinforced cement concrete (1:6:12) in open foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203.as directed by the Engineer-in-Change | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Plain/rein forced cement concrete(1:4:8)in open foundation complete as per drawing and technical specification Clauses 802,803,1202&1203 | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Providing weephole in brick masonary /stone masonary ,plain/ rainforced concrate abutment wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slpoe of 1 (V):20(H) towards drawing face complete as per drawings and technical specification Clauses614,709,1204.3.7.as directed by the Engineer-in-Change | - | No | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and laying of back filling behind abutment wing wall and return walls with complete as per drawing & technical specification clause 1204.3.8 as directed by the Engineer-in-Change | 34.27 | Per Cum | - | - | BI01010001010000000000000515BI0100001118 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
SBD4.pdf
Tender Documents • 4.45 MB
BOQ_198194.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid