Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC NO 12 14 3RD STREET ANNAI SATHYA NAGAR CHENNAI 600 118 | CHENNAI | CHENNAI | TAMIL NADU | 600118 | ₹13.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.5 LRejected-Finance M 241 RAGAVENDRA NAGAR TNHB SEVELIMEDU KANCHIPURAM DISTRICT TAMIL NADU 631 502 | SEVELIMEDU | KANCHIPURAM | TAMIL NADU | 631502 | ₹14.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹15 LRejected-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹15 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | R UVARAJAN L2 | M/s MSK Construction L3 | N VEERAMANI ( LAKSHMI ENGINEERING SERVICES ) L1 |
|---|---|---|---|---|---|---|
| 1.01 | Applying two coats of best quality paint to the wall surface after thorough scraping, cleaning the existing surface, putty, dampness controlling, painting etc. complete. | 92.7 | 1M2 | 382 ₹35,411.40 | 300 ₹27,810 | 364 ₹33,742.80 |
| 1.02 | Applying painting to the wooden doors, wooden joist and ceiling using good quality enamel paint after cleaning the existing surface, termite treatment, filling of cavities,painting etc. complete. | 48.11 | 1M2 | 200 ₹9,622 | 300 ₹14,433 | 188 ₹9,044.68 |
| 1.03 | Carefully dismantling and re-fixing of damaged wooden wall panelling to Clive’s corner after removing damaged ones etc. complete. | 52.52 | 1M2 | 6,774.84 ₹3.6 L | 3,000 ₹1.6 L | 6,437 ₹3.4 L |
| 1.04 | Providing new aluminium partition in the NMA Component Authority section area ASA and DDO cabin including labour, material etc complete. | 74.51 | 1M2 | 5,226.19 ₹3.9 L | 7,000 ₹5.2 L | 4,915 ₹3.7 L |
| 1.05 | Dismantling, Shifting and re-fixing of existing Aluminium partition at NMA Competent authority office in order to widen the space including labour, material etc complete. | 65 | 1M2 | 4,577.1 ₹3.0 L | 4,000 ₹2.6 L | 4,347 ₹2.8 L |
| 1.06 | Providing new Aluminium partition for excavation material pottery store room and TSP office store room etc,. Complete. | 23.88 | 1M2 | 5,226.19 ₹1.2 L | 7,000 ₹1.7 L | 4,915 ₹1.2 L |
| 1.07 | Providing wall panelling to the wall surface of NMA Component Authority Chamber etc,. Complete. | 25.92 | 1M2 | 6,646 ₹1.7 L | 7,000 ₹1.8 L | 6,312 ₹1.6 L |
| 1.08 | Removing Old Teak wood joist 80mmx150mm affected by termite and re-fixing the same with available old wood, including necessary scaffolding arrangements, anti termite coat, primer, painting etc complete. | 8 | 1Nos | 7,446 ₹59,568 | 2,000 ₹16,000 | 7,070 ₹56,560 |
| 1.09 | Carefully removing the existing architectural models and re-fixing after attending up works and polishing the models with focus lights in the conference hall etc. complete. | 1 | 1Nos | 9,336 ₹9,336 | 1,54,027 ₹1.5 L | 8,779 ₹8,779 |
Tender Value
Refer Docs
EMD Value
₹33,100
Closing Date
19 Feb 2026, 11:00 amClosed
SA ASI Chennai
o/o Superintending Archaeologist, ASI, Chennai-9
Tender for execution of Work to OW to Maintenance of Office Building and Guest room Clives House, Chennai for the year 2025-26 Retender 1st call
2026_ASI_898403_1
T-15014/48/2025-Chennai Circle
Open Tender
Civil Works - Buildings
90 days
As per tender document
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹33,100
Yes
10 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Archaeological Survey of India, Chennai Circle, Fort St.George,Chennai-9
Name of Work: Execution of Work to OW to Maintenance of Office Building and Guest room Clive's House, Chennai for the year 2025-26 (Retender-1st call)
Contract No: 044-25670397 (Rates should be quoted inclusive of GST )
Name of the Bidder/ Bidding Firm / Company :
Item No Description and specification of items of work to be executed Item Code / Make Specification / Quantities to be executed Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency UNIT RATE (Including Taxes) In Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1.01 Applying two coats of best quality paint to the wall surface after thorough scraping, cleaning the existing surface, putty, dampness controlling, painting etc. complete. item1 1M2 Excess(+) Full Conversion INR
1.02 Applying painting to the wooden doors, wooden joist and ceiling using good quality enamel paint after cleaning the existing surface, termite treatment, filling of cavities,painting etc. complete. item2 1M2 Excess(+) Full Conversion INR
1.03 Carefully dismantling and re-fixing of damaged wooden wall panelling to Clive’s corner after removing damaged ones etc. complete. item3 1M2 Excess(+) Full Conversion INR
1.04 Providing new aluminium partition in the NMA Component Authority section area ASA and DDO cabin including labour, material etc complete. item4 1M2 Excess(+) Full Conversion INR
1.05 Dismantling, Shifting and re-fixing of existing Aluminium partition at NMA Competent authority office in order to widen the space including labour, material etc complete. item5 1M2 Excess(+) Full Conversion INR
1.06 Providing new Aluminium partition for excavation material pottery store room and TSP office store room etc,. Complete. item6 1M2 Excess(+) Full Conversion INR
1.07 Providing wall panelling to the wall surface of NMA Component Authority Chamber etc,. Complete. item7 1M2 Excess(+) Full Conversion INR
1.08 Removing Old Teak wood joist 80mmx150mm affected by termite and re-fixing the same with available old wood, including necessary scaffolding arrangements, anti termite coat, primer, painting etc complete. item8 1Nos Excess(+) Full Conversion INR
1.09 Carefully removing the existing architectural models and re-fixing after attending up works and polishing the models with focus lights in the conference hall etc. complete. item9 1Nos Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Location: Quarters 1 to 8. (Block 1 to 4) Select
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tenderdocument.pdf
Tender Documents • 35.71 MB
BOQ_944312.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid