| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC | ₹1.8 Cr Quoted ₹1.9 Cr | 1 | Accepted-AOC L-1 |
| 2 | 2₹3.1 Cr+₹1.2 Cr (62.8%)Rejected-AOC | ₹3.1 Cr+₹1.2 Cr (62.8%) | 2 | Rejected-AOC L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Competent committee found bid technically not suitable |
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
11 Nov 2021, 2:00 pmClosed
SE OMC I DTPS Kasimpur Aligarh
Office of the SE OMC I DTPS Kasimpur Aligarh
Round the Clock Operation, Routine, Preventive and Breakdown Mechanical Maintenance Works of Ash Handling Plant of Unit No. 08 and 09, DTPS, HTPS, Kasimpur for a period of two years.
2021_RVUNL_632865_1
ST-04/AHD/DTPS/HTPS/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
730 days
Ash Handling Plant, DTPS, HTPS
As per Tender documents
4 documents required · 4 mandatory
₹5,900
SAO EPAD UPRVUNL Kasimpur
₹3.9 L
Office of the SE OMC I DTPS Kasimpur Aligarh
19 Dec 2021
19 Oct 2021
12 Nov 2021
19 Oct 2021
11 Nov 2021
19 Oct 2021
19 Oct 2021 - 9 Nov 2021
29 Oct 2021
Amount
Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.8 (250MW) & Unit No. 9 (250MW).
Round the clock Operation and Routine & Preventive mechanical maintenance of Ash handling Plant of Unit No.8 (250MW) & Unit No. 9 (250MW).
Break down maintenance of Ash Slurry Pumps, Ash Water pumps, Sealing Pumps & Drain Pumps as per details giving below:
Dismantling & shifting of Ash Slurry Pump from its foundation at (-) 8.5 Mtr. to ground level (Zero meter).
Shifting of Overhauled/New Pump from ground Level to the foundation of Pump at (-) 8.5 Mtr.
Complete overhauling of ‘SAM’ make Ash Slurry Pumps
Dismantling &Shifting of BALP/FWP/FAHP/BAHP from its foundation to zero meter
Shifting of BALP/FWP/FAHP/BAHP from zero meter to the foundation of the pump.
Overhauling of Bottom Ash Low Pressure Pump (BALP)
Overhauling of Flushing Water Pump (FWP)
Overhauling of Bottom Ash High Pressure Pump (BAHP)
Overhauling of Fly Ash High Pressure Pump (FAHP)
Overhauling of Seal Water Pump
Overhauling of Drain Sump Pump
Overhauling of Bottom Ash Overflow Pump (BAOFP)
Alignment of Ash Slurry Pump
Alignment of Bottom Ash Overflow Pump
Overhauling of Fluid Coupling of Ash Slurry Pump
Overhauling of Vacuum Pump
Overhauling of Instrument Air Compressor
Overhauling of Fluidizing Blower
Overhauling of Gear Box of Clinker Grinder/Ash Slurry Pump/BOAF
Work of daily cleaning, water washing, sweeping, removal of ash debris, scrap etc. from the various places, Cleaning of Ash Slurry Sump, Ash Water Sump etc.
Water washing Sweeping & Cleaning of area as specified in the scope of work.
Water washing, Cleaning, excavation & shifting of Ash of area as specified in the scope of work.
Cleaning of Ash Slurry Sump (Sump 1 or 2)
Cleaning of Ash Water Sump
Fabrication and erection of Silencer of Vacuum Pumps, M.S. bends, Flushing apparatus
Fabrication of silencer of vacuum pump
Fabrication of 150 NB M.S. Bend
Fabrication & Erection of Flushing Apparatus under ESP Hopper of Unit No. 8/9
Various breakdown maintenance works in Ash Disposal Pipe Lines of Ash Handling Plant, DTPS, Kasimpur
Rotation of 350 Nb Laying of M.S. Pipe (size 350Nb) over RCC/Steel pedestals MS Ash slurry pipe line
Laying of M.S. Pipe (size 350Nb) over RCC/Steel pedestals
Welding of M.S. pipe (350Nb)
Fabrication of 350 Nb M.S. Bend of required angle
Fitting of 350 Nb M.S. bend in Ash Slurry pipe line
Replacement of eroded 350 Nb MS pipeline
Fabrication of Steel pedestals inside the Plant
Shifting of Steel pedestals from Plant to the Ash Dyke
Cutting of bushes etc. & excavation of earth around Ash Pipe lines
Insulation and refractory Works
Work of insulation of fluidizing air pipe lines from Blower to ESP hopper for Fly Ash Evacuation System
Scaffolding in Bottom Ash Hopper
Removal of old and damaged refractory from inside the bottom ash hopper of Unit No.8 or 9
Recasting of refractory in Bottom Ash Hopper of Unit No.8 or 9
Cubix engineering solutions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .