Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
8 Sept 2026, 6:00 pm
ACE PWD Zone I Jodhpur
ACE PWD Zone I Jodhpur
Construction Work of Atal Pragati Path Roads under Budget announcement 2026-27 in Distt. Pali , Pakage No RJ-25-03/Atal Pragati Path /2026-27
2026_CEPWD_592132_12
NIT No 10 of 2026-27 ACE PWD Zone I Jodhpur
Open Tender
Civil Works
Percentage
210 days
Pali
As per Tender documents
7 documents required · 7 mandatory
₹2,000
As per Tender documents
₹6.9 L
Yes
ACE PWD Zone I Jodhpur
23 Aug 2026
23 Aug 2026
10 Sept 2026
23 Aug 2026
8 Sept 2026
23 Aug 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Atal Path Bankli
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto a lead of 1000m including removal and disposal of top organic soil not exceeding in 150 mm thickness as per MORTH specification clause 201By mechanical Means .A. In area of light jungle | 0.12 | Heact | 10,374 | ₹1,244.88 |
| 2 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 1,270 | Cum | 515 | ₹6,54,050 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 2,960 | Cum | 25 | ₹74,000 |
| 4 | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For Grading III Material | 1,509.45 | Cum | 407 | ₹6,14,346.15 |
| 5 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By Mechanical Means Bituminous Courses | 75 | Cum | 69 | ₹5,175 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate | 281.25 | Cum | 1,002 | ₹2,81,812.5 |
| 7 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 3,750 | Sqm | 28 | ₹1,05,000 |
| 8 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 3,750 | Sqm | 10 | ₹37,500 |
| 9 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510.Case - II By Mechanical Means Bitumen (VG-30) | 3,750 | Sqm | 124 | ₹4,65,000 |
| 10 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per MoRTH Specification Clause 511 By Mechanical Means Case - II : Type B (II) Bitumen (VG-30) | 3,750 | Sqm | 41 | ₹1,53,750 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 3.77 MB
Tendernotice_3.pdf
PDF • 8.63 MB
BOQ_1051321.xls
BOQ • 0.34 MB
Techncial_Atalpath2503.pdf
Tender Documents • 0.97 MB
2Agreement01Jan2023_2503.pdf
Tender Documents • 8.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].