| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAdmitted-Finance | ₹4.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.2 Cr+₹29.1 L (5.99%)Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹5.2 Cr+₹29.1 L (5.99%) | L2 | Admitted-Finance |
| 3 | L3₹5.2 Cr+₹38.2 L (7.85%)Admitted-Finance | ₹5.2 Cr+₹38.2 L (7.85%) | L3 | Admitted-Finance |
| 4 | L4₹5.2 Cr+₹38.3 L (7.88%)Admitted-Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | ₹5.2 Cr+₹38.3 L (7.88%) | L4 | Admitted-Finance |
| 5 | L5₹5.7 Cr+₹87.5 L (18.0%)Admitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹5.7 Cr+₹87.5 L (18.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PERUMAL.S.K L4 | GUHANSANJEEVI ENTERPRISES L1 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L2 | M s Kumaresan and co L5 | JD ENTERPRISES L7 | C.PERIYASAMY L8 | mk constructions L6 | THE INDIA POWER FUTURE L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Schedule A (Civil and Erection works) | 1 | No | 1,41,33,334 ₹1,41,33,334 | 1,29,12,592 ₹1,29,12,592 Lowest | 1,48,44,425 ₹1,48,44,425 | 1,63,26,880 ₹1,63,26,880 | 1,63,16,383 ₹1,63,16,383 | 2,20,42,815 ₹2,20,42,815 | 1,85,76,762 ₹1,85,76,762 | 1,58,74,678 ₹1,58,74,678 |
| 2.00 | Schedule B (Supply of Materials) | 1 | No | 99,25,000 ₹99,25,000 | 93,87,500 ₹93,87,500 | 87,92,500 ₹87,92,500 | 99,89,000 ₹99,89,000 | 1,08,45,000 ₹1,08,45,000 | 1,12,09,000 ₹1,12,09,000 | 84,41,000 ₹84,41,000 | 81,76,000 ₹81,76,000 Lowest |
| 3.00 | Applicable GST Amount (Total GST Amount @18%) | 1 | No | 43,30,500.12 ₹43,30,500.12 | 40,14,016.56 ₹40,14,016.56 Lowest | 42,54,646.5 ₹42,54,646.5 | 47,36,858.4 ₹47,36,858.4 | 48,89,048.94 ₹48,89,048.94 | 59,85,326.7 ₹59,85,326.7 | 48,63,197.16 ₹48,63,197.16 | 43,29,122.04 ₹43,29,122.04 |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
5 Mar 2024, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Strengthening the existing Erode - Pugalur 110 KV SC Line on SC Towers with Dog Leopard Conductor into 110 KV DC Line on DC Towers from Loc. 1 to 17
2024_EB_427607_1
CE/TP-II/TRY/C-29/23-24
Open Tender
Civil Works
Works
180 days
ERODE
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹2.9 L
Yes
16 May 2024
19 Feb 2024
6 Mar 2024
19 Feb 2024
5 Mar 2024
20 Feb 2024
Amount
Schedule A (Civil and Erection works)
Schedule B (Supply of Materials)
Applicable GST Amount (Total GST Amount @18%)
Description of Work / Item(s)
Amount
Line Works
Clearing light jungle and disposing away from the site as directed by engineer incharge with all lead, lift, labour ,materials clearing and disposing away etc., complete.
Check survey and pit marking of various tower location including hire charges for theodolite ,cost of all materials, lead, lift, labour charges etc complete.
Earth work excavation for foundation in hard gavelly soil, stiff black cotton soil, murram, gravel, stoney earth and earth mixed with small size boulders with hard gravelly soil including initial lead of 10 m and lift of 2 m etc., complete.
Earth Work Excavation for foundation in Dense Mediam Rock not requiring blasting including initial lead of 10 m and lift of 2 m etc., complete.
Earth Work Excavation for foundation in Dense Mediam Rock requiring blasting including initial lead of 10 m and lift of 2 m etc., complete.
Earth work Excavation for foundation in hard rock by blasting and stacking including all leads lifts etc., complete.
Earth work Excavation for foundation in hard rock by wedging and chiselling where blasting is prohibitted and trimming to proper shape including all leads, lifts etc., complete.
PCC 1:3:6 using 20mm HB metal for tower foundation concrete without form work including cost of all materials, labour, lead, lift, curing etc., complete.
PCC 1:2:4 using 20mm HB metal for tower foundation frustum concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete.
PCC 1:2:4, using 20 mm HB metal for chimney concrete including cost of all materials,form works labour, lead, lift curing etc., complete.
Labour charges for assembling stub & cleat and template including shifting the template from loc to loc and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete. For '' GCR ''
Labour charges for assembling stub & cleat and template including shifting the template from loc to loc and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete. For '' HCR ''
Labour charges for assembling stub & cleat and template including shifting the template from loc to loc and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete. For '' KC R ''
Labour charges for assembling stub & cleat and template including shifting the template from loc to loc and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete. For '' DA "
Labour charges for assembling stub & cleat and template including shifting the template from loc to loc and reassembling same including cost of all materials, labour for fabrication galvanising etc., lead, lift etc., complete. For'' DD "
RCC 1:1.5:3 using 20mm HB metal for tower foundation frustum concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete.
RCC 1:1.5:3 using 20mm HB metal for chimny concrete with form work including cost of all materials, labour,curing lead, lift, curing etc., complete.
Providing Steel reinforcement for RCC works including cost of rod binding wire labour charges for cutting , bending , tying placing in position including cost of all materials, labour,curing lead, lift, curing etc., complete.
Re filling with excavated earth other than sand including watering consolidation in 150mm thick layer and forming platform around tower legs with excess earth etc., complete.
Transporting of excess excavated earth away from site as per the instruction of Engineer incharge at site including all labours, lead, lift etc., complete.
Providing pipe type earthing including necessary excavation for fixing 3M long of 40 mm dia GI ‘B’ class pipe and refilling with excavated earth mixed with salt and charcoal and connect the earth strips with the legs of the stub including cost of pipe refilling earth, fixing charges transport lead, lift, labour,etc., complete.
Plastering with CM 1:3, 12 mm thick for coping portion including cost of all materials, labour, lead, lift curing etc., complete.
erection of GI tower/tower extension angles ,square cross arm including tightening , punching of bolt & nut and final checking rectification of tower parts if any during erection , cost of T &P, labour, lead, lift etc complete. as per approved drawing and standard specification
Tack welding of bolt nuts in the newly erected tower upto bottom crossarm level including three tack weld for each bolt & nut, hire charges for welding machine, cost of welding rod and painting with cold galvanized paint over welded portion including cost all materials T&P labour lead lift etc complete
Painting with anticorrosive black paint upto 1m height from chimney leval ncluding cost all materials T&P labour lead lift etc complete
Arranging and availing line clear in HT/LT/EHT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT, LT, EHT, lines earthing including all , T&P , lead lift labour etc., complete.
Providing temporary guys at the time of releasing and lowering and stringing of power conductor and earth wire etc., rough sagging and single tensioning with necessary excavation of pits fixing rails etc., and dismantling stay after completion of work including all , T&P , lead lift labour etc., complete.
Providing well suported trussle using 7.5 cm to 10 cm and above dia bampoo post withnecessary bracing on either side of road crossing up to 5 meter height for supporting to the power conductor and earthwire during paying out of conductor and tensioning operation including cost of lead, lift, labour, major & minor T & Ps etc., Complete as per standard specification.
Transporting and Hoisting of 7 units of single Suspension insulators including supply of all necessary hardware fittings , cost of T & Ps with all labour, lead, lift, etc complete as per standard specification.
Transporting and Hoisting of 2 x 8 units of tension insulators including supply of all necessary hardware fittings , cost of T & Ps with all labour, lead, lift, etc complete as per standard specification.
Transporting and Hoisting of 8 units of tension insulators including supply of all necessary hardware fittings , cost of T & Ps with all labour, lead, lift, etc complete as per standard specification.
Transport and Stringing of 6 Nos Panther conductor, paving out, Rough sagging, Tensioning clipping, providing vibration dampers for tension locations including giving jumper connection including cost of transporting, lead, lift, labour, major & minor T &Ps etc., as per Standard specification complete
Releasing, lowering and re stringing of 1No. OPGW 24 fibre DWSM cable including fixing of hardware fittings and accessories etc. complete for the line. (Stringing of OPGW conductor is to be done using tension stringing equipment)
supply and fixing of Name board of size 0.750 x 0.450mm using 18 gauge MS sheet with 25x25x3mm MS angle frame painting with approved enamel painting two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labours, lead, lift, etc., complete as per standard specification.
supply and fixing of Number plate, Danger board, Phase plate(R,Y,B) wherever necessary including all lead, lift, etc., complete
Cutting and felling of Big size various type of trees and handing over of felled trees to the land owners at felling place including cost of T & Ps labour, lead & lift, etc., complete
Cutting and felling of Small size various type of trees and handing over of felled trees to the land owners at felling place including cost of T & Ps labour, lead & lift, etc., complete
Releasing and lowering of 3 Nos. leopard conductor including cost of all major and minor T & P "s with all lead lift etc complete.
Coiling of released 3 Nos leopard conductor to a concenient length and devoluting to store including cost of all major and minor T & P "s with all lead lift etc complete.
Lowering and dismantling of single tension insulators with fitting and devoluting to store including cost of all major and minor T & P "s with all lead lift etc complete.
Lowering and dismantling of Suspension insulators with fitting and devoluting to store including cost of all major and minor T & P "s with all lead lift etc complete.
Dismantling the existing various type of Towers, transporting & removing/clear from the site by the contractor by weighing the exg tower parts in way bridge in the presence of the TNEB officials, including cost of all T&Ps, welding M/c, welding rods and cost of transport etc and devoluted to store.
Description of Work / Item(s)
Amount
Suuply of Materials
Supplying of MS Tower/extension Parts including stub as per approved drawing and standard specification.
Supplying of HT Tower /extension Parts including stub as per approved drawing and standard specification.
Supplying and fixing of Various sizes of Bolt and Nut as per standard specification.
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
THE INDIA POWER FUTURE
PERUMAL.S.K
M s Kumaresan and co
mk constructions
JD ENTERPRISES
C.PERIYASAMY
PERUMAL.S.K
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
THE INDIA POWER FUTURE
JD ENTERPRISES
M s Kumaresan and co
mk constructions
C.PERIYASAMY
mk constructions
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
GUHANSANJEEVI ENTERPRISES
PERUMAL.S.K
M s Kumaresan and co
JD ENTERPRISES
C.PERIYASAMY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .