| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹3.9 L+₹4,587.72 (1.20%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹3.9 L
EMD Value
₹4,000
Closing Date
21 Jul 2022, 3:00 pmClosed
The Project Director DRDA KRISHNAGIRI
DRDA KRISHNAGIRI
Krishnagiri District Thally Block Under AGAMT II 2021-22 . Raising of Nursury Green Net with Fencing arrangemets at Gandhi Nagar and Providing Green Net with Fencing Arrangements to Horiculture Nursery 2 works PALAYAMKOTTAI TN-04-KRI-326
2022_RDTN_239876_1
Roc_42_2022_R10__20_06_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Thally
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
DRDA KRISHNAGIRI
1 Aug 2022
7 Jul 2022
21 Jul 2022
7 Jul 2022
21 Jul 2022
7 Jul 2022
18 Jul 2022
Amount
1.Raising of Nursury, Green Net with Fencing arrangemets @ Gandhi Nagar H/0 PALAYAMKOTTAI Rs. 3.10 /- Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
White washing two coats using shell lime including cost and conveyance ofall materials to site and all labour charges etc comoplete for 100 Sqm
Supply and Fixing of GI Pipes including cost nad Conveyance of all charges etc.,
Roofing with best Quality Tuflon Sheet
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed.
Supply and Fixing of Steel Doors and Windows Including All charges
Doors
Windows
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Supply and Cost of Stone Post of size 0.230 X 0.350 X 3.00 Including cost and Conveyance etc., Complete
Suplly and cost of Shade net for Sides from approved dealer Including cost and Conveyance etc., Complete
Labour charges for Errection of Stone Poles and fixing Charges for Shade net
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Cement concrete 1 : 2 :4 mix using 20mm ISS HBG metal including Cost and Conveyance of all Materials to Site and labour charges for Mixing , Laying, compacting and Curing Etc., Complete.
Supply and Erection of Centering for Sides and soffits including all labour charges
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supply and Fixing of Barbed wire including all cost and conveyance etc., All Complete
Provision for Erection charges for precast concrete vertical post including all labour charges etc., complete
provision for tieing the vertical post including all Labour charges
Provision for Grill Gate including all Labour charges
Provision for Name Board
2.Providing Green Net with Fencing Arrangements to Horiculture Nursery H/0 PALAYAMKOTTAI Rs.0.78 /- Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Cement concrete 1 : 2 :4 mix using 20mm ISS HBG metal including Cost and Conveyance of all Materials to Site and labour charges for Mixing , Laying, compacting and Curing Etc., Complete.
Supply and Erection of Centering for Sides and soffits including all labour charges
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supply and Fixing of Barbed wire including all cost and conveyance etc., All Complete
Provision for Erection charges for precast concrete vertical post including all labour charges etc., complete
provision for tieing the vertical post including all Labour charges
provision forGrill Gate including all Labour charges
Provision for Writing Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SA Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .