Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹36.9 LAccepted-AOC | 1 | Accepted-AOC The lowest tender | |
| 2 | 2₹39.9 L+₹3.0 L (8.17%)Rejected-Finance BLOCK C 14 GROUND FLOOR PLOT 618 624 BHIVANDIWALA TERRACE JAGANNATH SHANKARSHETH MARG DHOBI TALAO NEAR KALBADEVI POST OFFICE MUMBAI 400002 | MUMBAI | MAHARASHTRA | 400002 | 2 | Rejected-Finance Not the lowest tenderer | |
| 3 | 3₹43.7 L+₹6.8 L (18.5%)Rejected-Finance E 84 OF HQ CWE NW MUMBAI AGE 87 1 3 GEETA NAGAR NAVY NAGAR COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | 3 | Rejected-Finance Not the lowest tenderer | |
| 4 | 4₹43.8 L+₹6.9 L (18.7%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | 4 | Rejected-Finance Not the lowest tenderer | |
| 5 | 5₹45.6 L+₹8.7 L (23.7%)Rejected-Finance | 5 | Rejected-Finance Not the lowest tenderer |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
8 Jan 2020, 3:00 pmClosed
GE NW NAVY NAGAR
GE NW NAVY NAGAR COLABA MUMBAI DR HOMI BHABHA ROAD NAVY NAGAR COLABA MUMBAI
OUTSOURCING SERVICES OF ELECTRICIAN HELPERS AT NAVY NAGR UNDER GE(NW NAVY NAGAR COLABA MUMBAI
2019_MES_303433_2
8302/E8
Open Tender
Civil Works - Others
Item Rate
330 days
GE NW NAVY NAGAR
As per tender documents
7 documents required · 7 mandatory
₹500
GE NW NAVY NAGAR COLABA MUMBAI
₹99,000
24 Feb 2020
26 Dec 2019
9 Jan 2020
26 Dec 2019
8 Jan 2020
2 Jan 2020
26 Dec 2019 - 8 Jan 2020
Amount
Comprehensive maintenance of internal electrification of Married and OTM Accommodation under GE(NW) Navy Nagar in one shift per day (0900h to 1700h of 8 hour shift) excluding Sundays and Holidays as directed by Engr-in-Charge by employing Eleven Electrician minimum 3 years experience as electrician and eleven helpers of 10th pass and the work involves:-
Attending and carrying out day to day complaints of users within the GE(NW) Navy Nagar AOR on priority basis within the given time and manual registering of complaints if required all as directed by Engr-in-Charge.
Updating status of complaints and depositing the old stores.
Nature of complaints shall be:-
PRIORITY-I No lights, fan repair, repair/replacement of switches, sockets & fan regulators. Replacing burnt MCB and main switch, repair/replacement needed to set right short circuit and related fire incidence, Voltage fluctuation due to internal wiring faults and repair to faulty earthing except laying new earthing/earhth pit.
PRIORITY-II (i) Replace defective fans, call bell, switch board & point wiring. (ii) General cleanliness & upkeep of the complaint Cell.
Any other duties as assigned by the Engineer-in-Charge. Note : (i) All type of stores required for carrying out the duties will be provided by the Department for repair and replacement (ii) The Contractor shall provide required Tool Kit & Tool box as applicable to rectify the complaints (iii) The Contractor shall provide required Registers with respect to the Contract as per the format given by the Department (iv) The Contractor shall provide Uniforms to their employees for wearing during duty hours as per the per the pattern approved by the Accepting Officer. (v) The Contractor shall provide mobile phone for on duty staff for effective communication (vi) The Contractor shall provide transport if any required for attending complaints (vii) The contractor shall be responsible for any mishappening, accident and loss life of the workman engaged in the work. Nothing shall be admissible on this account. (vii) If any electrician found absent Rs 1000/- per shift be deducted and Rs 800/- should be deducted in case of Helpers
The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost of work mentioned in NIT, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (Cover No 2). The deposited amount shall be the difference between estimated cost mentioned in NITand amount quoted by lowest bidder. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall sumbit BGB/FDR of validity shall 12 months for the purpose of encashment/ release as the case may be.
AGRAWAL ASSOCIATES
shree arihant constrution
Shree Ayyappa Engineering
NOEL ENGINEERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .