| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 CrAccepted-AOC | ₹9.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.6 CrRejected-Finance F5 SURIYAN ELITE RESIDENCY GANGAI AMMAN KOIL STREET KARUVADIKUPPAM PUDUCHERRY 605 008 | PONDICHERRY | PUDUCHERRY | 605008 | ₹9.6 Cr | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹10.1 CrRejected-Finance N A | ₹10.1 Cr | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹10.2 CrRejected-Finance PUDUCHERRY PUDUCHERRY PUDUCHERRY | PONDICHERRY | PUDUCHERRY | 605001 | ₹10.2 Cr | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹13.7 CrRejected-Finance 240 CUDDALORE ROAD MUDALIARPET PUDUCHERRY 605 004 | PONDICHERRY | PUDUCHERRY | 605004 | ₹13.7 Cr | L5 | Rejected-Finance Not Lowest |
Tender Value
₹10.1 Cr
EMD Value
₹20.1 L
Closing Date
25 Feb 2021, 4:00 pmClosed
The Executive Engineer, ID, PWD, Puducherry
O/o the Executive Engineer, ID, PWD, Puducherry.
Sub-Work 1. Construction of PCC drain for the Mettuvoikal from NH Road Crossing Culvert at Sivakami Nagar to NH 45 road cross culvert at Gundu salai junction at Ellaipillaichavady, Puducherry.
2021_PWDC2_7802_1
50/PW/IRRN/2020-2021
Open Tender
Civil Works
360 days
Puducherry
Please refer Tender Documents
3 documents required · 3 mandatory
₹1,575
₹20.1 L
9 Jul 2021
18 Feb 2021
26 Feb 2021
18 Feb 2021
25 Feb 2021
18 Feb 2021
Amount
Filling available excavated earth (excluding rock) in trenches, plinth, sidesof foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m.
Extra for every additional lift of 1.5m or part thereof in - All kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width of 10sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m - All kinds of soil - by head load. The rate includes pumping out any type of water due to stagnation /flowing /seepage and also working under foul condition etc complete
Making of bundwall with HDPE cement bags filled with stone dust/ quary rubbish for discharge regulation, breach closing/ diversion arrangement. The rate includes the cost of empty HDPE bags, cost of stone dust, labour charges for filling the bags and placing in position of its purpose in or under foul conditions etc., . and Pumping out any type of water due to stagnation/ flowing/ seepage etc complete as directed by the Engineer-in-charge. by head load.
Supplying and filling with quary dust in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in deapth consolidating each deposited layers by ramming and watering etc. complete including all lead and lift, Pumping out any type of water due to stagnation/ flowing/ seepage and also working under foul condition etc complete complete as directed by the Engineer-in-charge - by head load.
Centering shuttering including struttings, propping etc. and removal of form work for foundations, footings , bases for columns.- Using steel sheet with M.S.frames. The rate Pumping out any type of water due to stagnation/flowing/seepage and also working under foul condition etc complete as directed by the Engineer-in-charge. - by head load
Centering shuttering including struttings, propping etc. and removal of form work for retaining walls, return walls, walls (any thickness including attacheted plasters, butteress, plinth string course fillets etc., The rate includes pumping out any type of water due to stagnation /flowing /seepage and also working under foul condition etc complete as directed by the Engineer-in-charge- using steel sheets with M.S. frames - By head load.
Cement concrete 1:4:8 mix with stone aggereate 40mm nominal size in foundation at all level of above / below ground level. The rate including Pumping out any type of water due to stagnation/flowing/seepage and also working under foul condition etc complete as directed by the Engineer-in-charge - by head load
Providing and laying in position cement concrete manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work including pimping of RMC from transit mixer to site of laying, excluding the cost of centering , shuttering, finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability M-15 grade plain cement concrete by using 320kg of cement. All works upto 3.00 m below ground and upto floor 5 level. The rate including of pumping out all type of water due to seepage / flowing / stagnation and also working under foul condition etc complete as directed by the Engineer-in-charge - by head load
Cement plaster 12mm thick in cement mortar 1:3 including pumping out all type of water due to seepage/ flowing / stagnation etc complete as directed by the engineer -in-charge- by head load
Providing and laying UPVC pipe of 250mm dia including transporting the pipe to work site and placing position for discharge through the drain during construction period as directed by the Engineer-in-charge.
Reassembleing the UPVC pipe of 250mm dia by removing if form one location and ficing it at the continous strtechtes for the dischargeform the canal.
Extra for providing and mixing ordinary portland cement 43 grade of approved brand and manufacture in quarry rubbish/ stone dust at the rate of 3bags of cement per cum of quarry rubbish or stone dust mixing in mechanical mixer etc., under foul condition complete as directed by the enineer in charge
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead - nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead - Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and isposal of unserviceable material within 50 metres lead
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in lime mortar
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in cement mortar
SRI MARUTHI CONSTRUCTIONS
N K Gunasekaran
L Djegaradj Moncher
D Ramesh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.