Loading…
Loading…
Tender Value
₹9.6 L
EMD Value
₹95,754
Closing Date
10 Jun 2026, 3:00 pm2d left
ce knn
ce knn moti jheel
Work of construction of covered chamber on the drain from Block No. 481 to Rhymer Coaching and from Nandlal Square to Swadeshi Dairy in Mohalla Shastri Nagar under Zone 06 Ward 69 Sarojini Nagar
2026_NNKAN_1157810_1
23/AA-6/2026-27
Open Tender
Civil Works
45 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹95,754
6 Jun 2026
6 Jun 2026
10 Jun 2026
6 Jun 2026
10 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Non-Sor-F17014-DIMOLITION & DISMENTLING-Dismentling of damage RCC or R.B Work including stacking dismental material with in 60m distence etc all comp. Dismentling of damage RCC or R.B Work including stacking dismental material with in 60m distence ete all comp.-Rate-1200 per 1 Cum. | 3 | cum | 1,200 | ₹3,600 | BI01010001010000000000000515BI0100001171 |
| 2 | 6.1.1-FS6001-BRICK WORK-Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement: 4 coarse sand)-Rate-6600.00 per 1 Cum. | - | cum | 6,600 | - | BI01010001010000000000000515BI0100001172 |
| 3 | 13.1.1-FS13001-PLASTER AND PAINTING-13.1.1 12 mm cement plaster of mix 1:4 (1 cement: 4 fine sand) 12 mm cement plaster of mix :-Rate-182.00 per 1 Sqm. | - | sqm | 182 | - | BI01010001010000000000000515BI0100001173 |
| 4 | 4.1.2-FS5001-Concrete/R.C.C. Work-Concrete /R.C.C Work 1:12:3 (1 Cement: 1/2 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)-Rate-7160 per 1 Cum. | - | cum | 7,160 | - | BI01010001010000000000000515BI0100001174 |
| 5 | 10.25.2-F-MILD STEEL & IRON WORK-steel work welded in built up sections/framed work including cutting hoisting fixing in position and applying a priming coat etc all comp steel work welded in built up sections/framed work including cutting hoisting fixing in position and applying a priming coat etc all comp-Rate-120.00 per 1 kg | 4,990.57 | kg | 120 | ₹5,98,868.4 | BI01010001010000000000000515BI0100001175 |
| 6 | 5.22.6-FS5030-Concrete/R.C.C. Work-steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in positon and biding all comp Steel reinforcement for R.C.C. work Including straightening, cutting, bending, placing in position and binding all complete upto plinth level-Rate-7200.00 per 1 Qıl | 11.29 | qtl | 7,200 | ₹81,288 | BI01010001010000000000000515BI0100001176 |
| 7 | 5.2.2-FS5025-Concrete/R.C.C. Work-RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft foundation with 1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) including bending binding and fixing of reinfocement in position casting cutting of wall and satisfaction of the engineer in charge including cost of all material etc all complete (ch-5, sn-15, ref- 5.2.2)-Rate-8600.00 per 1 Cum. | 12.87 | cum | 8,600 | ₹1,10,682 | BI01010001010000000000000515BI0100001177 |
| 8 | TAX18% | 1 | TaX | 1,46,065.25 | ₹1,46,065.25 | BI01010001010000000000000515BI0100001178 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_2169765.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid