| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-AOC C 185 2ND FLOOR MAYAPURI PHASE 2 NEW DELHI 110064 | NEW DELHI | WEST DELHI | DELHI | 110064 | ₹5.7 Cr | L1 | Accepted-AOC Bidder was L1 |
| 2 | L2₹9.9 Cr+₹4.2 Cr (73.6%)Rejected-AOC | ₹9.9 Cr+₹4.2 Cr (73.6%) | L2 | Rejected-AOC Bidder is not L1 |
| 3 | L3₹10.4 Cr+₹4.7 Cr (83.0%)Rejected-AOC | ₹10.4 Cr+₹4.7 Cr (83.0%) | L3 | Rejected-AOC Bidder is not L1 |
| 4 | L4₹11.0 Cr+₹5.3 Cr (92.8%)Rejected-AOC 185 A POCKET B MAYUR VIHAR II DELHI 110091 | EAST | DELHI | 110091 | ₹11.0 Cr+₹5.3 Cr (92.8%) | L4 | Rejected-AOC Bidder is not L1 |
| 5 | L5₹16.8 Cr+₹11.1 Cr (194.9%)Rejected-AOC | ₹16.8 Cr+₹11.1 Cr (194.9%) | L5 | Rejected-AOC Bidder is not L1 |
| Sl No | Description | Qty | Unit | TIRUPATI CEMENT PRODUCTS L2 | TRENCHLESS ENGINEERING SERVICES PRIVATE LIMITED L1 | Gypsum Structural India Pvt. Ltd. L4 | ATOZ INFRACON PVT LTD L5 | Ace Energy Infrastaructure Pvt. Ltd. L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00MICROTUNNELING AND PIPELINE INSTALLATION ACROSS SONG-2 RIVER | ||||||||
| 2.00Complete work of the crossing (between the limits as defined in approved drawing) by Micro-tunneling Technique (as defined in scope of work) including all additional tunnelled/drilled lengths necessitated by Contractor's design of water crossing (Song-2 River) including "Receiving and taking over" owner supplied 3LPE coated line pipes from owner's designated places of issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ worksite including all handling, loading, unloading etc., supply of all materials as per the 'scope of supply' to worksite(s) including design & supply of Jacking pipe of suitable size (minimum 1200 mm ID) to accommodate 1 no. 8" NB carrier pipe and 2 nos. 40 mm HDPE ducts in the same tunnel, design, fabricate, supply and install roller supports for carrier pipes & ducts inside tunnel, supply of all consumables, manpower, equipment, other resources and acquiring the required land for storage, fabrication, string preparation, construction of temporary approach road (as required) on Rishikesh side, development of construction site on both sides etc. and execution of, but not limited to, following works in accordance with specifications and instructions of Engineer-in-charge and as per all provisions of Contract Document. | ||||||||
| 3.00Locating existing pipelines (if any) in the existing ROU corridor using pipeline locator, marking the pipeline location, taking necessary safety precautions including providing warning signs, barricading, scaffolding, etc. as per instruction of EIC for safeguarding the existing pipelines (if any). | ||||||||
| 4.00Geotechnical and Hydrological survey data is enclosed in bid document to the extent available. Contractor, if desired, may verify the geotechnical survey data without any additional cost to Owner. However, MECON/OWNER shall not be held responsible for the change of strata if found to be variable. Contractor/ bidder shall carry out all other additional surveys for collecting data relevant to design & construction of crossing, engineering, preparation of all necessary construction drawings, procedures etc. duly approved by owner/ concerned authority. | ||||||||
| 5.00Pre-construction survey, obtaining scour depth from concerned authority (as required), necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for obtaining approval from concerned Authority/ Engineer-in-charge, getting permission/ work permit/ NOC for river crossing as well as utility crossings (if any) encountered during water crossing from respective concerned authority (Local/State/Central Govt. Departments like NHAI, PWD, Irrigation, etc.) including other stake-holders, if any, as applicable prior to start of the execution of work. Note:- Permission (documents) from Forest department is being obtained by GAIL (Initial & Final), however tree-cutting and day-to-day compliance action of Forest department permission/ guidelines/ instructions (like proper barricading, etc.) received during execution of site work is in the scope of Contractor. | ||||||||
| 6.00Following data shall be obtained from concerned authority/ local sources to finalise/ re-verify scour depth (if deemed necessary):- | ||||||||
| 7.00(i) Past Historical flood level data indicating HFL to determine highest flood level. | ||||||||
| 8.00(ii) River flow data including velocity of water flow. | ||||||||
| 9.00(iii) Necessary information regarding type of soil and strata underneath the river bed. | ||||||||
| 10.00String preparation including taking over of 3LPE coated carrier pipes from CLIENT's designated yard, handling, loading, transportation to site, unloading, stringing, welding, 100 % radiography by X-ray, welding repair and re-radiography, pre-installation hydrotesting (as required) as per approved procedure, cutting pipes to accomodate in shaft (as required; Note - single carrier pipe of 6m (Minimum) length is permissible in the Micro Tunnel section.), rebevelling (if required), UT testing to check for lamination (as required by specification), re-welding, joint coating and repair of pipeline coating with repair patch or equivalent material (including supply of repair patch) as per specifications/approved drawings. | ||||||||
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
25 Feb 2026, 2:00 pmClosed
MANAS RANJAN SETHI
NOIDA
MICROTUNNELING AND PIPELINE INSTALLATION ACROSS SONG-2 RIVER CROSSING UNDER HARIDWAR-RISHIKESH DEHRADUN PIPELINE (HRDPL) PROJECT
2026_GAIL_265566_1
NCR/CNP/S87/2025-26
Open Tender
Civil Works - Others
Works
450 days
NCR ONM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹15 L
Yes
microsoft team meeting
23 May 2026
4 Feb 2026
26 Feb 2026
4 Feb 2026
25 Feb 2026
11 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MICROTUNNELING AND PIPELINE INSTALLATION ACROSS SONG-2 RIVER | - | - | - | - |
| 2 | Complete work of the crossing (between the limits as defined in approved drawing) by Micro-tunneling Technique (as defined in scope of work) including all additional tunnelled/drilled lengths necessitated by Contractor's design of water crossing (Song-2 River) including "Receiving and taking over" owner supplied 3LPE coated line pipes from owner's designated places of issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ worksite including all handling, loading, unloading etc., supply of all materials as per the 'scope of supply' to worksite(s) including design & supply of Jacking pipe of suitable size (minimum 1200 mm ID) to accommodate 1 no. 8" NB carrier pipe and 2 nos. 40 mm HDPE ducts in the same tunnel, design, fabricate, supply and install roller supports for carrier pipes & ducts inside tunnel, supply of all consumables, manpower, equipment, other resources and acquiring the required land for storage, fabrication, string preparation, construction of temporary approach road (as required) on Rishikesh side, development of construction site on both sides etc. and execution of, but not limited to, following works in accordance with specifications and instructions of Engineer-in-charge and as per all provisions of Contract Document. | - | - | - | - |
| 3 | Locating existing pipelines (if any) in the existing ROU corridor using pipeline locator, marking the pipeline location, taking necessary safety precautions including providing warning signs, barricading, scaffolding, etc. as per instruction of EIC for safeguarding the existing pipelines (if any). | - | - | - | - |
| 4 | Geotechnical and Hydrological survey data is enclosed in bid document to the extent available. Contractor, if desired, may verify the geotechnical survey data without any additional cost to Owner. However, MECON/OWNER shall not be held responsible for the change of strata if found to be variable. Contractor/ bidder shall carry out all other additional surveys for collecting data relevant to design & construction of crossing, engineering, preparation of all necessary construction drawings, procedures etc. duly approved by owner/ concerned authority. | - | - | - | - |
| 5 | Pre-construction survey, obtaining scour depth from concerned authority (as required), necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for obtaining approval from concerned Authority/ Engineer-in-charge, getting permission/ work permit/ NOC for river crossing as well as utility crossings (if any) encountered during water crossing from respective concerned authority (Local/State/Central Govt. Departments like NHAI, PWD, Irrigation, etc.) including other stake-holders, if any, as applicable prior to start of the execution of work.
Note:- Permission (documents) from Forest department is being obtained by GAIL (Initial & Final), however tree-cutting and day-to-day compliance action of Forest department permission/ guidelines/ instructions (like proper barricading, etc.) received during execution of site work is in the scope of Contractor. | - | - | - | - |
| 6 | Following data shall be obtained from concerned authority/ local sources to finalise/ re-verify scour depth (if deemed necessary):- | - | - | - | - |
| 7 | (i) Past Historical flood level data indicating HFL to determine highest flood level. | - | - | - | - |
| 8 | (ii) River flow data including velocity of water flow. | - | - | - | - |
| 9 | (iii) Necessary information regarding type of soil and strata underneath the river bed. | - | - | - | - |
| 10 | String preparation including taking over of 3LPE coated carrier pipes from CLIENT's designated yard, handling, loading, transportation to site, unloading, stringing, welding, 100 % radiography by X-ray, welding repair and re-radiography, pre-installation hydrotesting (as required) as per approved procedure, cutting pipes to accomodate in shaft (as required; Note - single carrier pipe of 6m (Minimum) length is permissible in the Micro Tunnel section.), rebevelling (if required), UT testing to check for lamination (as required by specification), re-welding, joint coating and repair of pipeline coating with repair patch or equivalent material (including supply of repair patch) as per specifications/approved drawings. | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
RFQ87.pdf
Tender Documents • 37.14 MB
CBA.xls
Other Document • 0.03 MB
BOQ_308409.xls
BOQ • 0.36 MB
Clarification1MT.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .