Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-AOC 1 136 SOUTH STREET MUTHUMOOTHANMOZHI RADHAPURAM TALUK TIRUNELVELI DISTRICT 627 657 | TIRUNELVELI | TAMIL NADU | 627657 | L1 | Accepted-AOC Quoted Lowest rate and
Executed Agreement on 29.03.2023 after negotiation | |
| 2 | L2₹29.0 L+₹1.6 L (5.94%)Rejected-Finance NO 4ARUN AVENUE SIVANATHA NAGAR K PUDHUR MADURAI 625 007 | MADURAI | TAMIL NADU | 625007 | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received | |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received |
Tender Value
₹28.0 L
EMD Value
₹29,000
Closing Date
1 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev), DRDA
O/O AC (D) / PD DRDA Thoothukudi
Thoothukudi District - Renovation of Poomalai Building at Toovipuram in Thoothukudi District Package No. TN/TUT-01/2022-23
2023_RDTN_290682_1
AC(D),DRDA,Tuty Lr.No. A5/1048/2023 dt.21.02.2023
Open Tender
Civil Works
Item Rate
30 days
Thoothukudi District
As per Tender Documents
4 documents required · 4 mandatory
₹0
₹29,000
3 May 2023
24 Feb 2023
1 Mar 2023
24 Feb 2023
1 Mar 2023
24 Feb 2023
Amount
Renovation of Poomalai Building (Painting work GF and FF) at Toovipuram in Thoothukudi district
Emulsion painting Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete. Ground Floor
Painting two coats using Ist quality readymix enamel paint of approved colour over Old iron work including cost and conveyance and all labour charges etc.Ground Floor
Emulsion painting Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete. First Floor
Painting two coats using Ist quality readymix enamel paint of approved colour over Old iron work including cost and conveyance and all labour charges etc.First Floor
Emulsion painting Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete. Outer
Renovation of Poomalai Building (First Floor) at Toovipuram in Thoothukudi district
Removing the damaged pressed tiles over roof including all labour charges etc
Dismantling the existing floor cement plastered surface
Brick work in cm 1:5 mix (one cement and five sand) using Country bricks of size 23 x 11 x 7 cm including curing, finishing and cost & Conveyance of all materials etc., complete.
RCC 1:1½:3 mix using 20 mm ISS HBG metal for RCC works excluding centering, shuttering, and reinforcement grill but including laying, ramming, curing etc., complete
Supplying and erecting centering for sides and soffits of RCC works of plane surfaces mentioned below including strutting 3m high using mild steel sheets stiffened with M.S angles
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
PLASTERING with cement mortar 1:3 mix 10 mm thick in all floors complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Finishing the roof with one course of pressed tiles including all labour charges
Providing rain water pipe including all labour charges etc complete
Paving the floor with scrath Proof Marbonite tiles including cost and conveyance of all materials other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Renovation of Poomalai Building (Ground Floor) at Toovipuram in Thoothukudi district
Dismantling the existing floor cement plastered surface
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
RCC 1:1½:3 mix using 20 mm ISS HBG metal for RCC works excluding centering, shuttering, and reinforcement grill but including laying, ramming, curing etc., complete
Supplying and erecting centering for sides and soffits of RCC works of plane surfaces mentioned below including strutting 3m high using mild steel sheets stiffened with M.S angles
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
PLASTERING with cement mortar 1:3 mix 10 mm thick in all floors complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Paving the floor with scrath Proof Marbonite tiles including cost and conveyance of all materials other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Finishing the Floor with Ornamental tiles
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Karuppasamy
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .