Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAccepted-AOC 66 C O J R NAICKER ASWATHNAGAR SANJAYNAGAR P O BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC L1 | |
| 2 | L2₹44.6 L+₹4,059.03 (0.09%)Rejected-Finance NO 02 SLV NILAYA THIRUMALAPPA NAGAR ATTUR 2ND STAGE YELAHANKA BANGALORE 64 | BANGALORE | BANGALORE | KARNATAKA | 560064 | L2 | Rejected-Finance BEING OTHER THAN L1 | |
| 3 | L3₹44.7 L+₹9,009.03 (0.20%)Rejected-Finance | L3 | Rejected-Finance BEING OTHER THAN L1 | |
| 4 | L4₹47.0 L+₹2.4 L (5.49%)Rejected-Finance | L4 | Rejected-Finance BEING OTHER THAN L1 | |
| 5 | L5₹47.4 L+₹2.8 L (6.32%)Rejected-Finance | L5 | Rejected-Finance BEING OTHER THAN L1 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
6 Jun 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE M AF JALAHALLI BANGALORE
GE M AF JALAHALLI BANGALORE 560013
PROVISION OF SERVICES FOR MAINTENANCE AND OPERATION OF WATER SUPPLY INSTALLATION AT EAST AREA OF AF STATION JALAHALLI.
2020_MES_320937_2
8464E8
Open Tender
Electrical and Maintenance Works
Item Rate
333 days
JALAHALLI
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Garrison Engineer M AF Jalahalli
₹98,000
17 Jul 2020
28 May 2020
8 Jun 2020
28 May 2020
6 Jun 2020
1 Jun 2020
29 May 2020 - 30 May 2020
60 days
Amount
Provision of services for operation and maintenance of Electric driven pump sets and chloronome plant of various capacity installed at various location including standby DG Sets at water supply installations in East area Jalahalli in all days including Sundays and all National Holidays by providing required skilled / semi-skilled tradesman for water supply installation and receiving and distribution of water as directed by JE E/M , and Engineer-in-Charge to avoid delay of water supply by operating the valves at various locations of East area as per Note (i) to (iii) below complete all as specified and as directed. (NOTE: Operator shall rectify the minor defects of plants during break down & also intimate to concerned JE E/M. Note: (i) The contractor shall deploy minImum one FGM SKILLED per shift i.,e, 3 shift per day ( 1st, 2nd & 3rd shift ) at two location ( double tank and range pump house ) and one FGM per shift for two shifts per day ( 1st and 3rd shift) at IMH pump house Total Eight (08) FGM per day. (ii) FGM shall not leave installation till the reliver attends duty . (iii) The contractor shall arrange alternate person of respective trade during absence and leave period of existing FGM . (iv) The skilled personsl shall be deployed for the work in any locations specified above for the similar nature of work. Shift Duty timings 1st Shift : 0600 Hours to 1400Hours,2nd Shift : 1400 Hours to 2200Hours. 3rd Shift : 2200 Hours to 0600Hours. Total Number of persons to be deployed per day : (08) FGM
Provision of services for operation and maintenance of valves and pump sets installed at various location including standby DG Sets at water supply installations in East area Jalahalli in all days including Sundays and all National Holidays by providing required skilled / semi-skilled tradesman for water supply installation and receiving and distribution of water as directed by JE E/M , and Engineer-in-Charge to avoid delay of water supply by operating the valves at various locations of East area as per Note (i) to (iii) below complete all as specified and as directed. (NOTE: Operator shall rectify the minor defects of plants during break down & also intimate to concerned JE E/M. Note: (i) The contractor shall employ minimum one Valveman SEMI SKILLED per shift i.e.two shift per day ( 1st & 3rd Shift) at Three Location (Officers Md Accn , 7th Camp , 168 WO ) and one valve man per shift for (one shift per day i.,e 1st shift) 6th camp, Aravali Enclave , Range pump house and 54 Civ Qtr, ETI, E&ITI and 16 TS. Total Seven (07) per day. (ii) Valveman shall not leave installation till the reliver attends duty . (iii) The contractor shall arrange alternate person of respective trade during absence and leave period of existing / Valveman . (iv) The semi skilled personsl shall be deployed for the work in any locations specified above for the similar nature of work. Shift Duty timings 1st Shift : 0600 Hours to 1400Hours,2nd Shift : 1400 Hours to 2200Hours. 3rd Shift : 2200 Hours to 0600Hours. Total Number of persons to be deployed per day : (07) Valve man
Vinayaka Enterprises
P K CONSTRUCTIONS
shashi shekar construction
JM Engineering
RAMESH BABU CO
M/S SRI BALAJI ENTERPRISES
eurekaenterprises
M/S Sneha Enterprises
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .