Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | -39.99% | ₹7.3 L | L1 | Admitted-Finance |
| 2 | L2₹9.3 L+₹2.0 L (27.2%)Admitted-Finance ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | -23.66% | ₹9.3 L+₹2.0 L (27.2%) | L2 | Admitted-Finance |
| 3 | L3₹9.6 L+₹2.3 L (31.5%)Admitted-Finance | -21.11% | ₹9.6 L+₹2.3 L (31.5%) | L3 | Admitted-Finance |
| 4 | L4₹10.1 L+₹2.8 L (38.1%)Admitted-Finance | -17.15% | ₹10.1 L+₹2.8 L (38.1%) | L4 | Admitted-Finance |
| 5 | L5₹10.1 L+₹2.8 L (38.3%)Admitted-Finance | -17.00% | ₹10.1 L+₹2.8 L (38.3%) | L5 | Admitted-Finance |
Tender Value
₹12.1 L
EMD Value
₹24,280
Closing Date
28 Aug 2026, 6:00 pmClosed
Divisional Forest Officer
Anantnag Forest Division Anantnag
Upgradation of Watch Tower at Datinag Shangus, Anantnag Forest Division.
2026_FD_321106_6
e-NIT No. 03 OF 2026-27 (Anantnag Forest Division)
Open Tender
Agricultural or Forestry
Percentage
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
JandK Forest Centralized Pooling Account No.
₹24,280
5 Sept 2026
17 Aug 2026
29 Aug 2026
17 Aug 2026
28 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 19.19 | CUM | 479.3 | ₹9,197.77 |
| 2 | Providing & laying dry stone solling, sand/dust including ramming, dressing etc complete in foundations and under floors, including Mech. Carriage & Head load charges up to site of work complete. | 0.57 | CUM | 1,000 | ₹570 |
| 3 | Providing & laying in position cement concrete (1cement: 4 coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. All work upto plinth level. | 0.45 | CUM | 5,202.9 | ₹2,341.31 |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work for. Foundations, footings, bases of columns etc. | 9.21 | SM | 286.35 | ₹2,637.28 |
| 5 | Centering and shuttering including strutting, propping etc and removal of form work for. Suspended Floors | 30.25 | SM | 718.2 | ₹21,725.55 |
| 6 | Centering and shuttering including strutting, propping etc and removal of form work for. Edges of Slabs | 17.38 | RM | 262.2 | ₹4,557.04 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree landings balconies, shelves, chajjas, lintles, bands, plain window sills, staircases and spiral stair cases upto floor five level exculding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement: 1.5 coarse sand: 3 graded stone agg 20mm nominal size). | 4.98 | CUM | 9,821.85 | ₹48,912.81 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (Thermo-Mechanically Treated bars of grade Fe-500D or more). | 498 | KG | 123.2 | ₹61,353.6 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.79 | CUM | 7,571.55 | ₹36,267.72 |
| 10 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five leve | 4.79 | CUM | 1,455.65 | ₹6,972.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1070948.xls
BOQ • 0.29 MB
Officeendsttcorrigendium.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .