Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹29.7 LAdmitted-Fee/PreQual/Technical/Finance PATHARA ALIPUR ASKA | ASKA | GANJAM | ODISHA | +0.00% | ₹29.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹29.7 LAdmitted-Fee/PreQual/Technical/Finance W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | +0.00% | ₹29.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹29.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹29.7 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹29.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.7 L
EMD Value
₹29,661
Closing Date
29 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BALASORE
Repair to Bridge. Over river Jalaka on Mathani-Nima road_Road_WBM,PMC, Sealcoat, colouring,railing_1.500 to 2.060
2026_CERWI_136359_1
01SERWBLS2026-27 (Bid-01-79)
Open Tender
Civil Works - Roads
Percentage
90 days
Balasore
2 documents required · 2 mandatory
₹6,000
₹29,661
Yes
5 Sept 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
20 Jul 2026 - 29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to distance of 50 meters outside the periphary of the area etc. complete & as per specification & direction of the Engineer-in-charge. | 11,445 | sqm | 2.86 | ₹32,732.7 |
| 2 | Providing Pot Hole Repair With WBM using 40 mm size H.G. metal and moorum for filler mematerials including watering and consolidation with HRR /Hand Rammer Etc. complete & as per specification & direction of the Engineer-in-charge. | 41.16 | cum | 4,931.29 | ₹2,02,971.9 |
| 3 | Laying for scraping, cleaning,the road surface ,applying tack coat using 3.00 kg of bitumen for 10 sqm and laying 75mm thick built up spray grouting in one layer including hand packing to proper camber and consolidation with PRR including hire & Running charges of PRR ,hot mix plant,bitumen boilers and all other T & P etc. complete | 37.65 | sqm | 473 | ₹17,808.45 |
| 4 | Providing and applying Tack Coat with bitumen Emulsion using emulsion pressure distributer @ 0.20 Kg / sqm on the prepared bituminus / granular surface.complete & as per specification & direction of the Engineer-in-charge. | 2,025 | sqm | 21.3 | ₹43,132.5 |
| 5 | Providing & laying semi-dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hours using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and fillter, transporting the bot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specifications complete in all respection. | 151.88 | cum | 15,481.32 | ₹23,51,302.88 |
| 6 | Providing and applying primer Coat with bitumen Emulsion ( S.S. )on prepared surface of granular base including clearing of road surface and spraying primer @ 0.20 Kg / sqm using mechanical means.complete & as per specification & direction of the Engineer-in-charge. | 548.8 | sqm | 60.6 | ₹33,257.28 |
| 7 | Scarifying the existing bituminious surface for finished item of work with hire & running including cost and conveyance of all materials and labour etc complete & as per specification & direction of the Engineer-in-charge. | 486 | sqm | 6 | ₹2,916 |
| 8 | Earth work in ordinary soil by mechanical means within 5.0 KM lead and lift including dressing, breaking clods to maximum 5cm to 7cm, laying in layers not exceeding 0.3 m in depth including sectioning , cambering, & compacting by HRR , all labour ,T&P, royalty & taxes etc. complete | 477.58 | cum | 590.5 | ₹2,82,010.99 |
stage.html
html • 0.11 MB
finance_602234.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.22 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_602234.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .