| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2,617.83Admitted-Finance | ₹2,617.83 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Keshav Kumar Sharma Construction Company L1 |
|---|---|---|---|---|
| 1.00 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing (Hard Soil between 10 to 30% boulders) | 1 | Per Cubic meter | 53.9 ₹53.9 Lowest |
| 2.00 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing(Hard Soil between 30 to 50% boulders) | 1 | Per Cubic meter | 70.22 ₹70.22 Lowest |
| 3.00 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing(Hard Soil with above 50% boulders) | 1 | Per Cubic meter | 92.12 ₹92.12 Lowest |
| 4.00 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing(In hard muram/canker/compact clayey soil) | 1 | Per Cubic meter | 75 ₹75 Lowest |
| 5.00 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (Hard Soil between 10 to 30% boulders) | 1 | per pit | 12.95 ₹12.95 Lowest |
| 6.00 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (Hard Soil between 30 to 50% boulders) | 1 | per pit | 15.78 ₹15.78 Lowest |
| 7.00 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (Hard Soil with above 50% boulders) | 1 | per pit | 14.71 ₹14.71 Lowest |
| 8.00 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (In hard muram/canker/compact clayey soil) | 1 | per pit | 12.11 ₹12.11 Lowest |
| 9.00 | Digging of Trench by mechanical means of desired shape & size including dressing and laying of excavated soil in contunuous mound and dressing of mound manually (Hard Soil between 10 to 30% boulders) | 1 | Per Cubic meter | 90.78 ₹90.78 Lowest |
| 10.00 | Digging of Trench by mechanical means of desired shape & size including dressing and laying of excavated soil in contunuous mound and dressing of mound manually (Hard Soil between 30 to 50 % boulders) | 1 | Per Cubic meter | 115.76 ₹115.76 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
5 Aug 2026, 6:00 pmClosed
DCF JHALAWAR
DCF Office JHALAWAR
Advance action works
2026_FORES_578838_1
NIT 16 2026-27
Open Tender
Miscellaneous Works
Item Rate
240 days
JHALAWAR
please see the tender document
2 documents required · 2 mandatory
₹2,000
DCF JHALAWAR
₹3.9 L
DCF Office JHALAWAR
6 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing (Hard Soil between 10 to 30% boulders) | 1 | Per Cubic meter | 54.78 | ₹54.78 |
| 2 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing(Hard Soil between 30 to 50% boulders) | 1 | Per Cubic meter | 70.22 | ₹70.22 |
| 3 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing(Hard Soil with above 50% boulders) | 1 | Per Cubic meter | 93.29 | ₹93.29 |
| 4 | Ditch fencing:- 1.2 m deep, 1.5 m. wide at top and 0.9 m. wide at bottom includes dressing and laying excavated soil in continuous mound and dressing of mound. (Volume per running meter = 1.44 Cum) Rates For mechanically digging of ditch with JCB and manual dressing(In hard muram/canker/compact clayey soil) | 1 | Per Cubic meter | 75.2 | ₹75.2 |
| 5 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (Hard Soil between 10 to 30% boulders) | 1 | per pit | 12.95 | ₹12.95 |
| 6 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (Hard Soil between 30 to 50% boulders) | 1 | per pit | 15.78 | ₹15.78 |
| 7 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (Hard Soil with above 50% boulders) | 1 | per pit | 14.71 | ₹14.71 |
| 8 | Digging of Pits Size 0.45 x 0.45 x 0.45 cubic meter Excavated By JCB (In hard muram/canker/compact clayey soil) | 1 | per pit | 12.11 | ₹12.11 |
| 9 | Digging of Trench by mechanical means of desired shape & size including dressing and laying of excavated soil in contunuous mound and dressing of mound manually (Hard Soil between 10 to 30% boulders) | 1 | Per Cubic meter | 90.78 | ₹90.78 |
| 10 | Digging of Trench by mechanical means of desired shape & size including dressing and laying of excavated soil in contunuous mound and dressing of mound manually (Hard Soil between 30 to 50 % boulders) | 1 | Per Cubic meter | 115.76 | ₹115.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BID.pdf
Tender Documents • 18.64 MB
BOQ_1028691.xls
BOQ • 0.35 MB
c.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .