Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance LOW | |
| 2 | L2₹3.2 L+₹1,559.12 (0.49%)Accepted-Finance | L2 | Accepted-Finance MIDIUM | |
| 3 | L3₹3.2 L+₹3,844.35 (1.20%)Accepted-Finance | L3 | Accepted-Finance HIGH |
Tender Value
Refer Docs
Closing Date
20 Jul 2023, 4:00 pmClosed
SARPANCH/SACHIV
GP HUDKESHWAR
Supply of water supply material at village DHAMNA Nal Connection v Nal Yojna Pipe Line GP HUDKESHWAR KURD
2023_NAGPU_925629_1
PSNG/HUDKESHWAR/2022/23/141
Open Tender
Consumables - Raw Materials
Item Wise
280 days
GP HUDKESHWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
25 Jul 2023
15 Jul 2023
21 Jul 2023
15 Jul 2023
20 Jul 2023
15 Jul 2023
PVC PIPE 75 MM 4 KG
PVC PIPE 60 MM 4 KG
PVC PIPE 60 MM 6 KG
PVC PIPE 90 MM 6 KG
GI PIPE 1 "
GI PIPE 2 "
GI PIPE 3 "
GI PIPE 2.5 "
SLUSE VLEVE 2
SLUSE VLEVE 2.5 "
SLUSE VLEVE 3 "
AIR VALVE 1 " SINGAL BALL
AIR VALVE 2 " DOUBLE BALL
N.R.V. VLEVE 2 "
N.R.V. VLEVE 3 "
FLANCH 2 "
FLANCH 2.5 "
FLANCH 3 "
UPVC TEE 1/2 INCH
UPVC TEE 1/3 INCH
UPVC TEE 1 INCH
UPVC LBO 1/2 INCH
UPVC LBO 1/3 INCH
UPVC LBO 1 INCH
UPVC BEND 1/2 INCH
UPVC BEND 1/3 INCH
UPVC BEND 1 INCH
UPVC COPLING 1/2 INCH
UPVC COPLING 1/3 INCH
UPVC COPLING 1 INCH
GI TEE 1 "
GI TEE 2 "
GI TEE 2.5 "
GI TEE 3 "
GI BEND 1 "
GI BEND 2 "
GI BEND 2.5 "
GI BEND 3 '
GI COUPLING 1 "
GI COUPLING 2 "
GI COUPLING 2.5 "
GI COUPLING 3 "
PVC COUPLING 1 "
PVC COPLING 2 "
PVC COPLING 2.5 "
BRAS FERUL ( SWITCH SHOKET )
BRAS FERUL REGULETOR
PVC COUPLING 3 "
PVC SADAL 1 "
PVC SADAL 2 "
PVC SADAL 2.5 "
PVC SADAL 3 "
SOLUATION
CABLE 3 COR .2.5 SQ.M
MAIN SWITCH 5 HP
3 HP 8 STEG PUMP ( SUBMURSIBAL PUMP )
5 HP 8 STEG PUMP ( SUBMURSIBAL PUMP )
7.5 HP 8 STEG PUMP ( SUBMURSIBAL PUMP)
10 HP 8 STEG PUMP ( SUBMURSIBAL PUMP)
HDPE Pipe 65 MM
HDPE Pipe 75 MM
HDPE Pipe 90 MM
PVC pipe 75 mm 6 kg
G I pipe 100 mm
sluise valve 65 mm
hard murum
hard murum bolder
salt rock
sluise valve 80 mm
cement ISI Mark
Badari 20 mm
PANNEL BOX ( ALAN )
LIGHTING CONDUCTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .