SE FARRUKHABAD
FARRUKHABAD
PLINTH AND EARTHING WORK IN EUDD FARRUKHABAD
2024_DVVNL_915125_4
103/EDC(F)/2023-24
Open Tender
Electrical Works
Turn-key
60 days
FARRUKHABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE FARRUKHABAD
₹20,000
9 May 2024
24 Apr 2024
29 Apr 2024
24 Apr 2024
29 Apr 2024
24 Apr 2024
Amount
Laying and Jointing PVC Pipe. Heading
Construction of T/F plinth (FOR 100/250/400/630) KVA of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement, sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be fiilled from the ground level up to 15 centimeter below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimeter. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4. The t/fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand. (All the material will be arranged by the contractor)
CHEMICAL PIPE EARTHING -The hollow pipe used in the chemical pipe earthing is fitted with a G.I. strip 50x6mm and CCM (Crystalline conducive mixture) is compressed in to the pipe and pipe is sealed at both the end. CCM is a semi metal and the hollow pipe filled with CCM behave like a salt pipe and therefore the current carrying capacity increases substantially. The CCM has a high melting temperature of 2500°c and unlike coal it will not burn into ashes under high temperatures of 1500°c under high fault currents occurring due to phase to phase or phase to earth fault. (All the material will be arranged by the contractor)
Cartage Refilling
New Cartage for Printer
M/S Sushil Kumar
M/S ANURAG MISHRA CONTRACTOR & SUPPLIER
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .