Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.5 L
Closing Date
6 Jan 2020, 6:00 pmClosed
COL N K SAH
CWE AF LOHEGAON
SHIFTING OF LT PANEL FROM INFRONT OF NEW CONSTRUCTION OMQ NP 4 TO BACK SIDE OF P 45 BLOCK AT AFS MADH ISLAND UNDER GE AF THANE
2019_MES_308977_1
330011/41/E3
Limited
Job Works
Works
30 days
GE AF Thane
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Jan 2020
24 Dec 2019
8 Jan 2020
25 Dec 2019
6 Jan 2020
30 Dec 2019
Disconnecting all cable connections of incoming & outgoing in LT Panel-02 Nos.
Dismantling and taking out LT Panels carefully from foundation and shifting from in front of new construction OMQ NP-4 to backside of P/45 block including PCC work for base support with installation, one coat of synthetic enamel paint of LT Panel complete all as directed by AGE E/M. 02 Nos.
Cutting of existing cable ends of the following size cables of LT XLPE insulated armoured heavy duty, connected with supply and fixing LT XLPE insulated armoured heavy duty cable 1100Volts grade of the same size including supply and fixing of heat shrinkable straight through joint kit old and new cables and connections of all cables with suitable size lugs, nut and bolts, washers, fixing accessories complete all as directed by AGE E/M:- (a) 120 Sqmm 3.5 Core-40RM with straight through joint kit-02 Nos. (b) 95 Sqmm 3.5 Core-40RM with straight through joint kit-02 Nos. (c) 70 Sqmm 3.5 Core-40RM with straight through joint kit-02 Nos. (d) 50 Sqmm 3.5 Core-40RM with straight through joint kit-02 Nos. (e) 35 Sqmm 4 Core-40RM with straight through joint kit-02 Nos. (f) 25 Sqmm 4 Core-40RM with straight through joint kit-02 Nos. (g) 16 Sqmm 4 Core-60RM with straight through joint kit-03 Nos. (h) 16 Sqmm 2 Core-40RM with straight through joint kit-03 Nos.
Dismantling and taking out unserviceable MCCB 3 Pole 25 KA 63 Amps from existing LT Panels carefully supply and fixing MCCB 3 Pole 25 KA 63 Amps complete all as directed by AGE E/M. 02 Nos.
Dismantling and taking out unserviceable MCB 4 Pole, 63 Amps 10KA from existing LT Panel carefully and supply and fix MCB 4 Pole, 63 Amps 10KA complete all as directed by AGE E/M.-06 Nos
Dismantling of existing covered shed of post and sheets and supporting members and re-erect proposed site including replace the wornout MS section angle iron 50mmx50mmx6mm and 75mmx75mmx6mm including two coat of synthetic enamelled paint over a coat of primer complete-85 Kgs, powder coated galvanism iron 0.5 mm thick sheet with fixing accessories-48 Sqm and with PCC work for base and pillars complete all as directed by AGE E/M.-01 No. Note:- Old unserviceable material are shall be property of tenderer, necessary credit of the same deducted.
venus enterprises
Vinod Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .