| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAccepted-Finance | L1 | Accepted-Finance low quoted | |
| 2 | L2₹37.2 L+₹2.2 L (6.38%)Rejected-Finance H NO 72 KOTHIWADA KARAPUR SANKHALI GOA | L2 | Rejected-Finance high quoted | |
| 3 | L3₹62.5 L+₹27.5 L (78.7%)Rejected-Finance 407 4TH FLOOR FORTUNE SQUARE MOROD MAPUSA GOA | MAPUSA | GOA | L3 | Rejected-Finance high quoted |
Tender Value
₹37.2 L
EMD Value
₹74,391
Closing Date
8 Sept 2026, 5:30 pmClosed
Executive Engineer-V
the office of the Executive Engineer -V, PWD, Altinho Panaji Goa.
Construction of G plus 2 lift Shaft for the existing New Building of Civil and Criminal Court at Bicholim
2026_PWD_31530_1
PWD/D-V/ASW-I/28/26-27/L02
Open Tender
Civil Works - Buildings
Percentage
180 days
Altinho, Panaji -Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹74,391
24 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
8 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.All kinds of soil | 31.47 | cu.m | 291 | ₹9,157.77 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 3.53 | cu.m | 2,211 | ₹7,804.83 |
| 3 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:All works upto plinth level | 1.77 | cu.m | 6,810 | ₹12,053.7 |
| 4 | Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level ; M-30grade of concrete | 25.81 | cu.m | 8,874 | ₹2,29,037.94 |
| 5 | Centering & shuttering including Strutting, Propping & removal of forms for :Footings, Bases for columns Foundations | 39.74 | sq.m | 407 | ₹16,174.18 |
| 6 | Centering & shuttering including Strutting, Propping & removal of forms for sloping or battering surface (slabs, beams, louvers, etc) including folded plates ; Where inclination to the horizontal does not exceed 30° requiring shuttering on the underside only | 31.76 | sq.m | 805 | ₹25,566.8 |
| 7 | Extra to be added for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de- shuttering and de-centering at all levels, over a height of 3.5m, for every additional height of 1m or part thereof. (Plan area to be measured) Suspended floors, roofs, landings, beams and balconies (plan area to be measured) | 158.94 | sq.m | 297 | ₹47,205.18 |
| 8 | Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) | 86.31 | sq.m | 598 | ₹51,613.38 |
| 9 | Extra to be added for additional height in centering, shuttering where ever required with adequate bracing, propping etc. including cost of de- shuttering and de-centering at all levels, over a height of 3.5m, for every additional height of 1m or part thereof. (Plan area to be measured) Suspended floors, roofs, landings, beams and balconies (plan area to be measured) | 24.11 | sq.m | 297 | ₹7,160.67 |
| 10 | Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams exceeding 1m in depth | 81.08 | sq.m | 527 | ₹42,729.16 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_31912.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .