Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-I₹51.4 LAccepted-AOC | L-I | Accepted-AOC Accept | |
| 2 | L-I₹51.4 LRejected-AOC | L-I | Rejected-AOC Accept | |
| 3 | L-I₹51.4 LRejected-AOC C O JUGAKANTA GOGOI GELAKEY MORAN GAON P O GELAKY P S GELAKEY DIST SIVASAGAR PIN 785696 ASSAM | SIVASAGAR | ASSAM | 785696 | L-I | Rejected-AOC Accept |
Tender Value
₹54.1 L
EMD Value
₹1.1 L
Closing Date
25 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE PWRD CSRC
O/o SE PWRD CSRC
Improvement of Rongagarah Road under fund assistance from ONGC Ltd for the year 2022-23 (Ch.0.00 m to Ch.1000.00 m) under Nazira and Amguri Territorial Road Division, Nazira. PKG NO. SE/CSRC/2022-23/NATRD /ONGCL/NAZIRA/01
2023_PWD_28593_1
SE/CSRC/NIT and DNIT/6B/1214
Open Tender
Civil Works – Roads
Item Rate
180 days
Nazira
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,100
₹1.1 L
Yes
6 May 2023
5 Jan 2023
27 Jan 2023
5 Jan 2023
25 Jan 2023
5 Jan 2023
Amount
Construction of subgrade and earthen shoulders with approved materials obtained from pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical specification clause 303.1. (i) Private land
Construction of granular sub – base by providing well graded materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method rotavator at OMC, and compacting with vibratory roller to achive the desired density, complete as per clause 401, (ii) For Grading II Materials.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone screening to fill-up the interstics of coarse aggregates watering and compacting to the required density Grading 2 as per Technical specification clause 405. (A) By manual means WBM Gr - II
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming stone screening to fill-up the interstics of coarse aggregates watering and compacting to the required density Grading 2 as per Technical specification clause 405. (A) By manual means WBM Gr - III
Providing and applying prime coat with bitumen emulsion(ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70-1.00 km/sqm using mechanical means as per Technical specification clause 502
Providing and applying tack coat with bitumen emulsion(Rs-1) at the rate of 0.30-0.35 km/sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per Technical specification clause 503
Dense Graded Bituminous Macadam( Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.5% by weigth of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller to achieve the desired compaction as per MORT&H cl. no. 507 complete in all respect.( including carriagr of mixed materials up to 10.00km initial lead from mixing plant)( including cost of testing of materials at site and laboratory as directed by the deptt.) I. With hydrated lime/ cement as filler ( refer table 509-9 of MORT&H specification)A. With 60/70 or VG-30 grade bitumen (ii) for Grading II(19mm nominal size)
Bituminous Concrete( Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 to 5.6% by weigth of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller to achieve the desired compaction as per MORT&H cl. no. 507 complete in all respect.( including carriagr of mixed materials up to 10.00km initial lead from mixing plant)( including cost of testing of materials at site and laboratory as directed by the deptt.)I. With hydrated lime/ cement as filler ( refer table 509-9 of MORT&H specification)A. With 60/70 or VG-30 grade bitumen (ii) for Grading II(13mm nominal size)
E/W in excavation for foundation of structures up to 3 m dept. as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deletorious matterial, and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with approved materiels
Bedding for Pipe : Laying (First class) bedding on well compected approved granular materials clause 1105 (ii)
Providing concrete for Plain/ Reinforced concrete in open M10 (1:3:6) nominal mix in levelling course below open in head walls as per drawing & technical specifications 1109
Providing and Laying Reinforced Cement Concrete pipe NP3 for culverts on first classs bodding of granular material in single row including fixing coller with cement motar 1:2 but excluding excavation, protection works, bachfilling, concrete and masonary work in head walls and perapet clause 1106 (1000mm dia)
Brick masonary work in cement mortar in foundation complete excluding pointing and plastering, as per drawing and technical specification Clause 1109
Plastering with cement mortar (1:3) 15 mm thick on brickwork in substructure as per Technical specification Clause 613.3
Backfilling in foundation trenches as per drawing and technical specification clause 1108
PINKU GOGOI
seema konwar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .