Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.5 L Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Soil Investigation of Administrative Block, Academic Amenities Block, Class room & Laboratories and Recreation Block for NIT Phase-II). | Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Soil Investigation of Administrative Block, Academic Amenities Block, Class room & Laboratories and Recreation Block for NIT Phase-II). | L1 | |
| 2 | - | - |
| Sl No | Description | Qty | Unit | M/S ALLIED ENGINEERS L1 |
|---|---|---|---|---|
| 1 | Drilling by using any suitable method up to 15mtr depth or refusal in all type of strata, conducting standard penetration tests at every 1.5m depth, collection disturbed and undisturbed soil samples at 1.0 m interval or where strata changes, carrying out grain size analysis, atterberg limits, hydrometer analysis, unconfined compressive strength, triaxial shear tests, consolidation test, etc necessary for determination for safe bearing capacity and suggestion of suitable foundation type on the soil samples obtained from the bore holes as per relevant IS Code for the computation of safe bearing capacity and submission of final report in triplicate.
(Note:- Calculation of suitable foundation should be enclosed) | 20 | each | 10,000 ₹2,00,000 Lowest |
| 2 | Dynamic cone penetration tests upto 10m depth or refusal whichever is earlier. | 10 | each | 5,000 ₹50,000 Lowest |
Tender Value
₹4.0 L
EMD Value
₹7,917
Closing Date
25 Nov 2022, 3:00 pmClosed
AE-C-4
Bikas Chandra
EXECUTIVE ENGINEER GARHWAL
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Soil Investigation of Administrative Block, Academic Amenities Block, Class room & Laboratories and Recreation Block for NIT Phase-II). Subwork/Packages: Site development and the construction of Girls & Boys Hostel at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-I) including maintenance for three years on EPC Basis. (SH : Soil Investigation of Administrative Block, Academic Amenities Block, Class room & Laboratories and Recreation Block for NIT Phase-II)
25253
19/EE-Garhwal/CPWD/2022-23/AE/HNB
OPEN
Civil Works - Others
NCB
15 days
Srinagar, Jammu And Kashmir
4 documents required · 4 mandatory
₹7,917
Not Applicable
25 Nov 2022
18 Nov 2022
25 Nov 2022
25 Nov 2022
24 Nov 2022
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITPII19.pdf
document • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .