Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 03 SHIAH SHIAH BHUNTER NEENU KULLU HIMACHAL PRADESH 175141 | KULLU | HIMACHAL PRADESH | 175141 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.4 L
Closing Date
13 Aug 2021, 6:00 pmClosed
XEN REW DODA
XEN REW DODA
Construction of Water Tank Champ Nallah Kakota Pyt- Dharyouth Block- Kahara
2021_RDPR_131988_27
e-NIT 17 of 2021-22 BV3
Open Tender
Civil Works
Item Rate
30 days
DODA
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
Rural Development and Panchayati Raj
Exempted
20 Sept 2021
2 Aug 2021
14 Aug 2021
2 Aug 2021
13 Aug 2021
2 Aug 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, All Kind soil.(70%)
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, Ordinary Rock (30%)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 4.4.8 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) incl carriage of material all complete.
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 5.2.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl carriage of material all complete.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.3 Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for:5.16.1.1 Under 20 cm wide
12mm Cement plaster of mix: 13.4.1 1 : 4 ( 1 cement : 4 coarse sand) incl carriage of material all complete.
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 11.3.2 40mm thick with 20 mm nominal size stone aggregate. incl carriage of material all complete.
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) incl carriage of material all complete.
CIB (citizen information Board ) size 4'00"x5'00"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job)
JASWANT SINGH
JAI DEV SINGH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .