| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.8 LAccepted-AOC | L1 | Accepted-AOC Tender Approved by Commissioner | |
| 2 | L2₹94.6 L+₹3.8 L (4.16%)Rejected-Finance | L2 | Rejected-Finance Highest rate quoted |
Tender Value
₹90.9 L
EMD Value
₹55,500
Closing Date
17 Sept 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Inspector
Arulmigu Varatharaja perumal temple,Kezhuvathur village ,Mannargudi taluk,Thiruvarur district.
Reconstruction of Arulmigu Varatharaja perumal temple,Kezhuvathur village ,Mannargudi taluk,Thiruvarur district.
2024_HRCE_450373_2
01-L-2024-KVR
Open Tender
Civil Works - Others
Lump-sum
550 days
Varatharaja perumal temple, Kezhuvathur
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹55,500
Yes
9 Jan 2025
24 Apr 2024
18 Sept 2024
24 Apr 2024
17 Sept 2024
24 Apr 2024
24 Apr 2024 - 17 Sept 2024
Amount
Clearing Scrub Jungle
Temple
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls Stone masonary in lime mortar etc complete
Temple
Upto 3m
Above 3m to 6m
Above 6m to 9m
Karudazhvar
Earthwork excavation for foundation in all soils except hard rock requiring blasting to a full depth with initial lead of 10 m and lift of 2m etc., complete (SS 20B) as directed by the Dept, Officers.
Temple
Compound Wall- Estimate
Karudazhvar
Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand.
Temple
Compound Wall
Karudazhvar
Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete as per Std, Specification and as directed by the Dept, Officers
Temple
Compound Wall
Karudazhvar
Temple
Karudazhvar
Providing and laying position,Standardised concrete mi M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors,finishing,curing,etc,complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the excess usage of materials.)
Temple
a) For foundation and basement
b) Superstructure
Compound wall
a) Foundation and Basement
b) For Ground floor
Karudazhvar
a) Foundation and Basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Temple
Compound Wall
Karudazhvar
Centering for sides and soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M hight using MS sheets of size 90cmx60cm and BG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supported by casurina prop. 10cm to 13cm dia ( spaced of 75cm c/c) complying with standard specification and directed by the Dept, Officers. 10sqm.
Temple
A) centre upto grade beam
Compound wall
Centering up to grade beam
Centering for column (910) x 1.2
Centering for beams and slabs for up to 3m ht.
Karudazhvar
A) Centering upto grade beam
Brick work in Cement Mortar 1:5 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Temple
a) For Substructure
b) For Superstructure
b) For Superstructure
Compound wall
b) In Ground floor
Karudazhvar
b) For Superstructure
b) For Superstructure
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.
Temple
Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in cm 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.
Temple
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Cement Mortar 1:5 & Combination Mortor1:1:5 etc complete.
Temple
Karudazhvar
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
Temple
Upto 25'h
Karudazhvar
Vimanam upto 15'0"
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Cement Mortar1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
Temple
Kalkaram
(b) Vimanam / gopuram of ht. Up to 15'0" excluding Kalkaram
Karudazhvar
A) For Kalkaram up to 25'0"
Vimanam Upto 15'0" exculding Kalkaram
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Temple
Compound Wall
Karudazhvar
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Temple
(a) Vimanam / gopuram of ht. Up to 15'0" excluding Kalkaram
Karudazhvar
Vimanam up to 15'0"
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Compound Wall
Plastering with lime Mortor1:1:5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Temple
Karudazhvar Estimate
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Temple
Karudazhvar Estimate
Best varnish two coats for wood works etc, complete complying with standard specifications.
Temple
Karudazhvar Estimate
Refixing Cut Stone Slab / RCC Cover Slab etc, complete complying with standard specifications.
Temple
Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification
Temple
Karudazhvar Estimate
Labour charges for cut stone Nilaikkal (Nagapantham, poo )excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Temple
Karudazhvar
Pavukkal
Nilaikal Nagapattam
Labour charges for cut stone Pillar excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Temple
Labour charges for cut stone Thani Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Temple
Pointing the cut stone joints with lime mortar 1:1.5 20mm thick including cost of special tiles such brush and watering, curing etc complete, as per standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Temple
Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Compound wall
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over one coat of red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Compound wall
Painting with Manicka pattai with terracotta two coats etc complete. complying standard specification
Compound wall
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in CM 1:1.5 finishing the same with CM 1:1.5 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)
Temple
Sudhai size above 1' 0" upto 2' 6"
Sudhai size above 2' 6" upto 3' 6"
Karudazhvar
Sudhai size above 1' 0" upto 2' 6"
Sudhai size above 2' 6" upto 3' 6"
Add GST 18%
SRI ABIRAMI CONSTRUCTIONS (BID ID -1135030)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_537181.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .