Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | -16.89% | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹10.9 L+₹57,765.93 (5.62%)Admitted-Finance | -12.22% | ₹10.9 L+₹57,765.93 (5.62%) | L2 | Admitted-Finance |
| 3 | L3₹12.2 L+₹2.0 L (19.1%)Admitted-Finance | -1.01% | ₹12.2 L+₹2.0 L (19.1%) | L3 | Admitted-Finance |
| 4 | L4₹12.3 L+₹2.0 L (19.7%)Admitted-Finance | -0.50% | ₹12.3 L+₹2.0 L (19.7%) | L4 | Admitted-Finance |
Tender Value
₹12.4 L
EMD Value
₹12,370
Closing Date
9 Jan 2026, 5:00 pmClosed
ADCEO ZP PALGHAR
ADCEO ZP PALGHAR
Construction of Steps and Railing At Gunj Parashuram Temple, Tal - Wada, Dist - Palghar
2026_PALGH_1265079_11
20/EE/WD/ZPPAL/TENDER/2025-26
Open Tender
Civil Works
Percentage
Wada
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,360
₹12,370
Yes
18 Sept 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
9 Jan 2026
2 Jan 2026
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.
Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Providing and laying Cast in situ/Ready Mixcement concrete in M20 of trap/ granite/quartzite/gneiss metal for steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Providing and laying chequered tiles of approved quality of size 30 cm x 30 cm, confirming to corresponding I.S. for flooring in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.
Providing and fixing 900mm high S.S.304 Grade Stainless steel railing with 40mm diameter and 1.5mm thick at top, 40mm diameter and 1.5mm thick vertical supports spaced at 1.5m center to center and 8mm thick toughened glass including fabricating ,fixtures, errecting , necessary welding , grinding , finishing, buffing to stainless steel pipe etc. complete
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.99 MB
Tendernotice_2.pdf
PDF • 5.01 MB
Tendernotice_3.pdf
PDF • 0.47 MB
Tendernotice_4.pdf
PDF • 0.33 MB
BOQ_2180117.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .