Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
18 Dec 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Piyush Kumar Gupta
Power Grid Corporation of India Limited Saudamini 3rd Floor Plot No 2 Sector 29 Gurgaon Haryana 122001
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA)
CC/NT/W-COND/DOM/A04/26/14123
Open
Power/Energy Projects/Products
Works
India
₹25,000
23 Nov 2026
23 Nov 2026
18 Dec 2026
23 Nov 2026
18 Dec 2026
23 Nov 2026
1 Dec 2026
Name of Package : Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Package No : OH01
Specification No. : CC/NT/W-COND/DOM/A04/26/14123
Completion Period 24.0
: Attachments: General guidelines for filling up the Attachments ORIGINAL
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Specification No.: CC/NT/W-COND/DOM/A04/26/14123
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3(JV), 4, 4(A), 4(B), 5, 5(A), 5(B), 6, 7, 9, 10, 11, 12, 13,14, 14-IP, 15, 16, 17, 19, 20, 25 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as per ITB Clause No. 13.
3 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
4 Attachment-3 (QR Schedule) : Format attached in Volume-III of Bidding Documents.
5 Attachment 8 Manufacturer’s Authorisation Form : To be furnished as per proforma provided in the bidding document, on the letter head of the each Manufactures proposed to supply main items. Not included here.
6 Attachment 18 Safety Pact : To be submitted as per ITB Clause No. 9.3(s) and as per remarks in the safety pact.
7 Attachment-21 to 32: To be submitted as per proforma provided in the Bidding Document.
Note : Enable the Active X Control & Macros. Also ensure to keep option of "Trust acess to VBA project object Model" cheched [√]. Ensure that you work on MS Excel 2007 or higher version.
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Sole Bidder 1
JV (Joint Venture) 2 or More
Whether Bidder is MSE [Select from drop down menu] 0
Specify type of Bidder [Select from drop down menu] SOLE BIDDER SOLE BIDDER 1 1 0
1 JOINT VENTURE (JV)
Name of Sole Bidder
Address of Sole Bidder
Address of other Partner
Name of other Partner - 2 (More, if any)
Address of other Partner - 2 (More, if any) …… ……. …….. …… ……. ……..
Any Tower Parts Manufacturer proposed other than the bidder [Yes / No] No
Proposed Tower Parts Manufacturer other than the bidder, if any [Maximum two nos.]
NOTE: (In case of JV, all partners of the Joint Venture shall be MSEs to consdier its bid as bid from MSE, JV bidder with at least one non-MSE partner (whether lead or other partner) shall not be eligible for the benefit available to the MSE bidders)
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-3(JV) SOLE BIDDER OH01
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Joint Venture Agreement and Power of Attorney for Joint Venture*)
Bidder’s Name and Address : To:
Contract Services 1 &
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
This Attachment is Not Applicable
Name(s) and Addresse(s) of other partner(s)
The Joint Venture Agreement (as per the proforma attached at no. 15 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) and Power of Attorney for Joint Venture (as per the proforma attached at no. 14 in Section-VI, Sample Forms and Procedures, Conditions of Contract, Vol.-I of the Bidding Documents) are enclosed herewith.
Date : Printed Name : 0
Place : Designation : 24
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 ATTACHMENT-3 (QR)
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Qualifying Requirement Data)
Bidder’s Name and Address : To:
Contract Services
Name: Power Grid Corporation of India Ltd.,
Address: "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
Attachment-3 (QR) is attached with this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-4
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Form of Certificate of Origin and Eligibility)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We hereby certify that equipment and materials to be supplied are produced in [Name of Countries], eligible source country. Equipments & Materials produced in [Name of countries] Company incorporated & registered in [Name of countries]
We hereby certify that our company is incorporated and registered in [Name of Countries], eligible source country. [Name of Countries] [Name of Countries] [Name of Countries], [Name of Countries],
Date : Printed Name :
Place : Designation :
country. country. [Name of Countries], [Name of Countries],
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-4(A)
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles are included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
S.No. For Equipment Item Description Unit Quantity
Notwithstanding what is stated above, we further confirm that any additional special maintenance tools and tackles, required for the equipment under this package shall be furnished by us at no extra cost to the employer.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-4(B)
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(List of Special Maintenance Tools & Tackles)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We are furnishing below the list of special maintenance tools & tackles for various equipment under the subject package. The prices for these tools & tackles which are to be taken back after the completion of the work by us are not included in our lumpsum bid price. We further confirm that the list of special maintenance tools & tackles includes all the items specifically identified in your bidding documents as brought out below:
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-5
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Subcontractors Proposed by the Bidder)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
1.We hereby furnish the details of the items/ sub-assemblies (supply items), we propose to buy for the purpose of furnishing and installation of the subject Package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details of the proposed sub-contractor/sub-vendor
2. We hereby delare that we would not subcontract the erection portion of the contract without prior approval of the Employer.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 ATTACHMENT-5A
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Items, Components, Raw material, Services proposed to be sourced from Micro and Small Enterprises (MSEs)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
1. We hereby furnish the details of the items, components, raw material, services which we propose to buy/avail from Micro and Small Enterprises (MSEs) for the purpose of completion of works under the subject package :
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Name of Micro and Small Enterprises (MSEs)
Name & Address Category (Micro or Small)
2. The above is a list of items we propose to procure from MSEs. However, based on the situations during the execution of the contract, the above list may undergo changes. We hereby confirm that the details regarding actual procurement from MSEs carried out by us, as per the format provided at Section VI, Forms and Procedures, Volume-I of bidding documents, shall be submitted along with the bills for payment against supplies made/works done during execution of contract.
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 ATTACHMENT-5A
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Declaration to source material/equipment and services from within Arunachal Pradesh)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
In line with ITB Clause 9.3 (e), we intend to supply following items which are to be manufactured within Arunachal Pradesh. We further declare that we would source material / services for atleast 30% of the Installation Price of Second /Services contract from within Arunachal Pradesh.
Sl. No. Item Description Quantity proposed to be bought/sub-contracted Details / write-up to engage the Locals sub-contractor/sub-vendor
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-6
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Annexure I toAttachment-6
(Alternative, Deviations and Exceptions to the Provisions)
Sl. No. Reference clause in the Specifications Deviation Cost of withdrawal of the deviation
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-7
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Details of Alternative Bid)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
No Alternative Bid
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Work Completion Schedule)
Bidder’s Name and Address :
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject Package i.e., Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA). for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from from the date of Notification of Award
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
1 Detailed Engineering and drawing submission
a) commencement
2 Procurement of equipment/ components & assembly
a) commencement
a) commencement
4 Manufacturing
a) commencement
5 Shipments & Delivery
a) commencement
6 Establishment of site office
7 Installation at Site
a) commencement
8 Testing & Pre-commissioning
a) commencement
9 Trial Operation
a) commencement
Date : Printed Name :
Place : Designation :
Note : Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise.
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-10
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Guarantee Declaration)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
Dear Sir, We conform that the equipments offered shall have minimum performance specified in Technical Specification. We further guarantee the performance/efficiency of the equipments in response to the Technical Specifications.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-11
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We declare that we are aware of and have gone through the “Code of Business Conduct and Ethics for Senior Management Personnel”1 and “Code of Business Conduct and Ethics for Board Members”1 of POWERGRID (hereinafter referred to as the “Code of Conduct”). We further understand that as per the “Code of Conduct”, Senior Management Personnel including Board Members, who have retired/resigned from POWERGRID, shall not accept any appointment or post, as detailed in the referred “Code of Conduct”, within 1 year from the date of cessation of service/directorship unless approved by the Competent Authority. Accordingly,We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
*In case the date of joining in the bidder’s organization of such ex-employee is within 1 year from the date of retirement/resignation from POWERGRID, No Objection Certificate/ approval from the Competent Authority must be furnished along with the bid or subsequent through clarification pursuant to ITB Clause 21.
In case of non-submission of No Objection Certificate/approval of the Competent Authority, as required, We understand that POWERGRID shall deal with such cases as per its Policy and procedures in vogue, which may also result in rejection of our bid. We also confirm that POWERGRID shall be the sole judge in this regard. We further declare that any misrepresentation or submission of false/forged documents/information in this regard shall be dealt with as per the provisions of the Integrity Pact and/or the Bidding Documents and/or POWERGRID’s policy and procedures.
Date : Printed Name :
Place : Designation :
Note: 1. “Code of Business Conduct and Ethics for Senior Management Personnel” and “Code of Business Conduct and Ethics for Board Members” are available on POWERGRID’s website https://www.powergridindia.com. 2. The information in similar format should be furnished for each partner of joint venture in case of joint venture bid. 3. In case bidder has furnished no details on ex-employees of POWERGRID or has left blank or has indicated ‘-‘ against the same, it shall be deemed that they have not employed any such person in their organization.
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-11
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-11
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 Attachment-12
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Price Adjustment Data)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurgaon (Haryana) - 122001
We hereby furnish the relevant details pertaining to the price adjustment provisions for equipment as specified in your specifications and documents for the subject package. The necessary documentary evidence is enclosed.
Sl. No. Name of Materials / Labour Value of co-efficient Name of the published index Value of index
A For Fabricated Tower Parts (including bolts & nuts)
a Steel Blooms, co-efficient a = Steel Blooms of size 150 mm x 150 mm, as published by IEEMA
b. Electrolytic High Grade Zinc, co-efficient b = Electrolytic High Grade Zinc, as published by IEEMA
c. Labour, Co-efficient l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
Coefficient ‘a’ shall be between 0.51 to 0.57 and coefficient ‘b’ shall be between 0.08 to 0.10 and coefficient ‘l’ shall be between 0.20 to 0.24 and sum of Coefficients ‘a’, ‘b’ and ‘l’ shall be 0.85
A For Fabricated Pole Structures
a Steel Blooms, co-efficient a = Steel Blooms of size 150 mm x 150 mm, as published by IEEMA
b. Electrolytic High Grade Zinc, co-efficient b = IEEMA
c. Labour, Co-efficient l= Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
Coefficient ‘a’ shall be between 0.51 to 0.57 and coefficient ‘b’ shall be between 0.08 to 0.10 and coefficient ‘l’ shall be between 0.20 to 0.24 and sum of Coefficients ‘a’, ‘b’ and ‘l’ shall be 0.85
B. Line Materials
B1. AL59 Conductor
1 EC grade aluminium ingots, co-eifciant a = 0.80 Monthly average of “Aluminum LME SELLER Settlement Price including Premium of Al Ingots and Customs duty converted in RS./MT” as published by IEEMA
2 Labour, Co-efficient l= 0.05 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
i) Raw Material
A High Tensile Steel Galvanized Wire, coefficient a = CACMAI/ Nationally recognized published index
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
Coefficient ‘a’ shall be between 0.69 to 0.71 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
B2. AACSR Earthwire
1 EC grade aluminium ingots, co-eifciant a = 0.65 Monthly average of “Aluminum LME SELLER Settlement Price including Premium of Al Ingots and Customs duty converted in RS./MT” as published by IEEMA
High Carbon Steel Rods , co-efficient b = 0.13 FALSE FALSE
High Grade Electrolytic Zinc, co-efficient c = 0.02 High Carbon Steel Rods , co-efficient b = High Grade Electrolytic Zinc, co-efficient c = High Tensile Galvanised Steel wire, co-efficient b =
High Grade Electrolytic Zinc , co-efficient c =
3 Labour, Co-efficient l= 0.05 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
B2. Hardware Fittings
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA
B Electrolytic High Grade Zinc, coefficient b = Price indices for Electrolytic High Grade Zinc, as published by IEEMA
C Manufacture of Basic Metals, coefficient c= Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’, ‘b’, ‘c’ and ‘l’ shall be 0.80
B3 Conductor Accessories
3(a) Mid Span Compression Joint for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
3(b) Repair Sleeve for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
3(c) Bundle Spacer for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
3(d) T-connector
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
3(e) Rigid Spacer
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
3(f) Vibration Damper for Conductor
i) Raw Material
B Electrolytic High Grade Zinc, coefficient b = Price indices for Electrolytic High Grade Zinc, as published by IEEMA
C Manufacture of Basic Metals, coefficient c = Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
B4 Earthwire Accessories
4(a) Mid Span Compression Joint for Earthwire
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = Price indices for EC Grade Aluminium Ingots, as published by IEEMA.
B Electrolytic High Grade Zinc, coefficient b = Price indices for Electrolytic High Grade Zinc, as published by IEEMA.
C Manufacture of Basic Metals, coefficient c = Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ , 'b' , 'c' and ‘l’ shall be 0.80
4(b) Vibration Damper for Earthwire
i) Raw Material
B Electrolytic High Grade Zinc, coefficient b = Price indices for Electrolytic High Grade Zinc, as published by IEEMA.
C Manufacture of Basic Metals, coefficient c = Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
4(c) Suspension Clamp for Earthwire
i) Raw Material
B Electrolytic High Grade Zinc, coefficient b = Price indices for Electrolytic High Grade Zinc, as published by IEEMA.
C Manufacture of Basic Metals, coefficient c = Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
4(d) Tension Clamp for Earthwire
i) Raw Material
B Electrolytic High Grade Zinc, coefficient b = Price indices for Electrolytic High Grade Zinc, as published by IEEMA.
C Manufacture of Basic Metals, coefficient c = Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in). (Base: 2016 = 100) (www.labourbureau.nic.in)
Coefficient ‘b’ shall be between 0.06 to 0.08 and coefficient ‘c’ shall be between 0.55 to 0.61 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients 'b' , 'c' and ‘l’ shall be 0.80
5 Flexible Alumunium Bond Firm
D For PVC/XLPE Insulated Power and Control Cable
a) a=PVC Compound 0.15
b) Published Price of Metal IEEMA
i) Aluminium per MT IEEMA
ii) Copper per MT IEEMA
c) Weight in MT of Metal per kM (Size wise)
E Substation Structures
Lattice Steel Structures & Pipe Structures (including bolts & nuts, washers & foundation bolts)
a) Raw Materials
i) a=Structural steel 0.58 JPC Market Price (Retail) for average Price of Steel Angles of size 50 x 50 x 6 mm of all cities in Rs./MT as published by Joint Plant Committee(JPC).
ii) b=Electrolytic Zinc 0.16 IEEMA
b) Labour 0.11 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
F Transformer (excluding Insulating Oil) (ratings above 10MVA or voltage above 33kV up to 400kV)
i) Copper a= Price indices for copper wire rod, as published by IEEMA.
ii) Electrical Lamination Steel b= Price of CRGO Electrical Steel Lamination as published by IEEMA.
iii) Construction Steel c= Average price of Steel Plates (10mm thick), as published by IEEMA
iv) Insulating Material d= Price of Insulating Materials , as published by IEEMA.
v) Labour l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
a = Co-efficient of Copper, Value of which shall be between 0.16& 0.20., b = Co-efficient of Electrical Lamination Steel, Value of which shall be between 0.19 & 0.23, c = Co-efficient of Construction Steel, Value of which shall be between 0.10 & 0.12, d = Co-efficient of Insulating material, Value of which shall be between 0.10 & 0.12, l =Co-efficient of Labour, Value of which shall be between 0.22 & 0.26. and the sum of a, b, c, d & l shall be 0.85.
G Insulating oil for Power Transformer:
a) Insulating Oil e= 0.85 Transformer Oil (TO): Transformer oil conforming to IS:335-1993, supplied in drum(Ex-Refinery, Mumbai) as published by IEEMA.
H LT Transformer
i) Copper a= Price indices for copper wire rod, as published by IEEMA.
ii) Electrical Lamination Steel b= Price of CRGO Electrical Steel Lamination as published by IEEMA.
iii) Construction Steel c= Average price of Steel Plates (10mm thick), as published by IEEMA
iv) Insulating Material d= Price of Insulating Materials , as published by IEEMA.
v) Labour l= Indian field labour index – namely All-India Average Consumer Price Index Numbers for Industrial Workers (monthly) (Base 2016=100), as published by Labour Bureau, Shimla, Government of India (http://labourbureaunew.gov.in)
The sum of the value of coefficients for raw materials: a+b+c+d=0.65 to 0.73 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
I Surge Arrester
a) Raw Material
i Polymeric Compound a= Price of Polymeric Compound as published by IEEMA.
ii Zinc b= Price of electrolytic high grade Zinc as published by IEEMA.
iii Aluminum c= LME average Settlement Price Including Premium for ingot as published by IEEMA.
iv Cobalt d= LMB Price of Cobalt, converted into Indian Rupees as published by IEEMA.
b) Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
The sum of the value of coefficients for raw materials: a+b+c+d=0.55 to 0.65 and sum of all the coefficients including labour shall be a+b+c+d+l=0.85.
1 EC grade aluminium ingots, co-eifciant a = 0.65 Monthly average of “Aluminum LME SELLER Settlement Price including Premium of Al Ingots and Customs duty converted in RS./MT” as published by IEEMA
High Carbon Steel Rods , co-efficient b = 0.13 FALSE FALSE
High Grade Electrolytic Zinc, co-efficient c = 0.02 High Carbon Steel Rods , co-efficient b = High Grade Electrolytic Zinc, co-efficient c = High Tensile Galvanised Steel wire, co-efficient b =
3 Labour, Co-efficient l= 0.05 Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
C. For Installation Price Component
1 Installation Price Component [including Civil Works]
A High Speed Diesel, coefficient a = Wholesale Price Index Number for `High Speed Diesel (HSD)’ (Individual Commodity) (monthly) (Base: 2022-23=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in)
L Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
Coefficient ‘a’ shall be between 0.20 to 0.24 and coefficient ‘l’ shall be between 0.56 to 0.60 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
2 Supply & Placement of Reinforcement Steel
A High Speed Diesel, coefficient a = Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
L Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
B Manufacture of Basic Metals, coefficient b = Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
Coefficient ‘a’ shall be between 0.09 to 0.11 and coefficient ‘b’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.04 to 0.06 and sum of Coefficients ‘a’, ’b’ and ‘l’ shall be 0.80
3 For Concreting
A High Speed Diesel, coefficient a = Wholesale Price Index Number for `HSD’(Individual Commodity) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
L Labour, coefficient l = Indian field labour index – namely All India average consumer price index for Industrial Workers (monthly) (Base: 2016= 100), as published by Labour Bureau, Shimla, Government of India (www.labourbureau.nic.in).
B Manufacture of cement, lime and plaster, coefficient b = Wholesale Price Index Number for `Manufacture of cement, lime and plaster’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
C Cutting, shaping and finishing of stone, coefficient c = Wholesale Price Index Number for `Cutting, shaping and finishing of stone’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
Coefficient ‘a’ shall be between 0.18 to 0.22 and coefficient ‘b’ shall be between 0.25 to 0.35 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’, ’b’, 'c' and ‘l’ shall be 0.80
B.1 Hardware Fittings
i) Raw Material
a EC Grade Aluminium Ingots, coefficient a = IEEMA
b Electrolytic High Grade Zinc, coefficient b = IEEMA
c Manufacture of Basic Metals, coefficient c= Wholesale Price Index Number for `Manufacture of Basic Metals’(Group Item) (monthly) (Base: 2011-12=100), as published by Office of Economic Advisor, Ministry of Commerce & Industry(www.eaindustry.nic.in).
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.35 to 0.45 and coefficient ‘b’ shall be between 0.04 to 0.06 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’, ‘b’, ‘c’ and ‘l’ shall be 0.80
B.2 Conductor Accessories
(a) Mid Span Compression Joint for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = IEEMA
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
(b) Repair Sleeve for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = IEEMA
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
(c) Vibration damper for Conductor
i) Raw Material
A EC Grade Aluminium Ingots, coefficient a = IEEMA
ii) Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.13 to 0.17 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
d) Flexible Copper Bond shall be on FIRM PRICE BASIS
C. For Erection Price Component
1 Installation Price Component {including civil works but excluding ‘supply & placement of reinforcement steel’, ‘concreting’, survey, soil investigation and aviation signal for river crossing towers(if any)}
A HSD, coefficient a = Wholesale Price Index Number for ‘HSD’ (Individual commodity) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = 0.80 Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
Coefficient ‘a’ shall be between 0.20 to 0.24 and coefficient ‘l’ shall be between 0.56 to 0.60 and sum of Coefficients ‘a’ and ‘l’ shall be 0.80
2 Supply & Placement of Reinforcement Steel
A HSD, coefficient a = Wholesale Price Index Number for ‘HSD’ (Individual commodity) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
B Manufacture of Basic Metals, coefficient b = 0.80 Wholesale Price Index Number for ‘Manufacture of Basic Metals’ (Group Item) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Coefficient ‘a’ shall be between 0.09 to 0.11 and coefficient ‘b’ shall be between 0.63 to 0.67 and coefficient ‘l’ shall be between 0.04 to 0.06 and sum of Coefficients ‘a’, ’b’ and ‘l’ shall be 0.80
3 For Concreting
A HSD, coefficient a = Wholesale Price Index Number for ‘HSD’ (Individual commodity) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
L Labour, coefficient l = Indian Labour Bureau, Shimla, Govt. of India (monthly) (Base: 2001 = 100) (www.labourbureau.nic.in)
B Manufacture of Cement, Lime & Plaster, coefficient b = Wholesale Price Index Number for ‘Manufacture of Cement, Lime & Plaster’ (Group Item) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
C Cutting, Shaping and finishing of stone, coefficient c = 0.80 Wholesale Price Index Number for ‘Cutting, Shaping and finishing of stone’ (Group Item) (monthly) (Base: 2011-12=100) as published by Office of Economic Advisor, Ministry of Commerce & Industry (www.eaindustry.nic.in).
Coefficient ‘a’ shall be between 0.18 to 0.22 and coefficient ‘b’ shall be between 0.25 to 0.35 and coefficient ‘c’ shall be between 0.18 to 0.22 and coefficient ‘l’ shall be between 0.09 to 0.11 and sum of Coefficients ‘a’, ’b’, 'c' and ‘l’ shall be 0.80
The Bidders are required to estimate and indicate the values of different coefficients for each of the items in the price variation formulae within the specified range such that their summation is as specified in the Bidding Documents. Where no value or ‘-’ or ‘shall be furnished later’ is specified against the coefficient, the same will be deemed to be zero and the fixed component would be suitably adjusted. If the values of all coefficients in price variation formulae indicated by the Bidder are within the specified range but their sum exceeds the summation specified in the Bidding Documents, the values of the coefficients shall be pro-rata adjusted such that the summation remains as per the provisions of the Bidding Documents. If the values of all coefficients indicated by the Bidder are within the specified range but their summation is less than the value specified in the Bidding Documents, the values of the coefficients as indicated by the Bidder shall be considered as such and the fixed component in the price variation formulae would be suitably adjusted. Further, if any of values of the coefficients indicated by the Bidder is out of the range specified in the Bidding Documents, the lower of the values, as indicated by the Bidder vis-à-vis lower value of the range for that coefficient specified in the Bidding Documents, shall be considered and the fixed component would be suitably adjusted.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-13
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Declaration regarding Social Accountability)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-14
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
Integrity Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (o).
Power Grid Corporation of India Limited
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as
having its Registered Office at
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 1 of 8
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA). Package and Specification Number CC/NT/W-COND/DOM/A04/26/14123
POWERGRID values full compliance with all relevant laws of the land, rules, regulations, economic use of resources, and of fairness / transparency in its relations with its Bidders/ Contractors."
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles
(a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to
(b) POWERGRID will, during the tender process treat all Bidder(s) with equity, fairness and reason. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution
(c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personal interest in the Companies/Agencies participating in the Bidding/Tendering process and all known prejudiced persons
(2) If POWERGRID obtains information on the conduct of any of its employee which is a criminal offence under the IPC / PC Act , or if there be a substantive suspicion in this regard, POWERGRID will inform its Chief Vigilance Officer and in addition disciplinary actions can be initiated under POWERGRID’s Rules
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits itself to take all measures necessary to prevent corruption. The Bidder/Contractor commits itself to observe the following principles during its participation in the tender process and during the contract execution:
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 2 of 8
(a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which it is not legally entitled to, in order to obtain in exchange an advantage of any kind whatsoever during the tender process or during the execution of the contract
(b) The Bidder/Contractor will not enter into any illegal or undisclosed agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
(c ) The Bidder/Contractor shall not pass any information provided by POWERGRID as part of business relationship to others and shall not commit any offence under PC / IPC Act.
(d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
(e ) The Bidder/Contractor will, when presenting his bid, disclose any and all payments made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
(f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/information in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID
(g) The Bidder/Contractor shall ensure adoption of Integrity Pact by its Sub-contractors and shall be responsible for the same
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason
(2) If the Bidder/Contractor has committed a transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may, after following due procedures, ban /blacklist the Bidder/Contractor in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. The imposition and duration of the ban will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The ban will be imposed for a maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the ban prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID is entitled for forfeiture of the Bid Guarantee under the Bid
(2) If POWERGRID has terminated the contract under Section III or if POWERGRID is entitled to terminate the contract under Section III, POWERGRID shall be entitled to forfeit the Contract Performance Guarantee of this contract, in full or part thereof as may be decided, besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall disclose in its Bid any transgressions occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country, that may impinge on the Anti-corruption principle
(2) If the Bidder makes incorrect statement on this subject, it can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason and further action can be taken in line with POWERGRID’s policies.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 4 of 8
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or its subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India. The names of the IEMs have been indicated in the Bidding Documents.
(2) The panel of IEMs shall review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. The panel of IEMs has right of access to all project documentation. The panel of IEMs may examine any complaint received by them and submit a report to Chairman-cum-Managing Director, POWERGRID, giving joint findings, at the earliest. The panel of IEMs may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He / She reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his / her request and demonstration of a valid interest, unrestricted and unconditional access to their documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEMs information as sought by him / her which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract. The IEMs shall also sign declaration on ’Non-Disclosure of Confidential Information’ and of ‘Absence of Conflict of Interest’. In case of any conflict of interest arising at a later date, the IEM shall inform Chairman-cum-Managing Director, POWERGRID and recuse himself/herself from that case
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he / she will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under PC / IPC Act, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 6 of 8
(9) While representing any matter in relation to the Integrity pact inter-alia including its transgression to the panel of IEMs, POWERGRID and Bidder/Contractor shall not approach the court of law and await the decision of the IEM in the matter
(10) The word ‘IEM’ would include both singular and plural
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration/Conciliation clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing. Side agreements have not been made.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Issues like Warranty/Guarantees etc. shall be outside the purview of IEMs.
(6) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral/Conciliation or judicial proceedings (arising out of the arbitral/Conciliation proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of
Integrity Pact Page 7 of 8
(7) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-15
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Option for Interest Bearing Advance(s) (Initial Advance and/or Engineering Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises)
Bidder’s Name and Address : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
I We have read the provisions in the Bidding Documents regarding furnishing the option for advance payment. Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents, we hereby confirm to opt the following:
Interest Bearing Advance(s)
(a) Supply Portion:
(i) Interest bearing Initial advance :
(b) Services Portion: Interest Bearing Initial Advance
II We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3.(a) Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
3.(b) Are you a MSE owned by SC/ST* entrepreneurs in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order (Indicate Yes/No) 0
3.(c) If 3(b) is ‘Yes’ please mention whether you are (Proprietary MSE/ Partnership MSE/ Private Limited Company) owned by SC/ST entrepreneurs
3.(d) Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No)
4. Permanent Account (PAN) No.
5. GSTIN Numbers
I. GSTIN in the Sates/UT from where the supply of goods take place
Name of the States/UT GSTIN number
II. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
Name of the States/UT GSTIN number
6. PF Registration No. of the Company
7. PF Regional Office covered (with Address)
8. Name of Contact Person
9. Contact Details
10. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account:
Type of Account: Current Account
11. 9 digit MICR code printed at bottom in middle, next to cheque no.
12. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
*The definition of MSEs owned by SC/ST is as given under:
a. In case of proprietary MSE, proprietor(s) shall be SC /ST.
b. In case of partnership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
c. In case of Private Limited companies, at least 51% share shall be held by SC/ST promoters.
Documentary evidence: Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-16
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Additional Information)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
In support of the additional information required as per ITB Sub-Clause 9.3 (p) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
A certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Bidder (Sole Bidder)
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder (in case of JV bidder, from all the partners) addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
(iii) As per para BDS/ITB clause 9.3 q, Bidder shall furnish the details of their Provident Fund Code Number
Sl. No. Name of Bidders/JV Partners Provident Fund Code Number Details
2.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder or any partner of JV may result in rejection of Bid. [Reference ITB clause 9.3(p)(ii)]
2.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3 Details regarding previous transgressions of Integrity Pact
The bidder should provide detailed information on any transgression of Integrity Pact that occurred in the last 10 years with any other Public Sector Undertaking or Government Department or any other Company, in any country.
3.1 Details regarding previous transgressions of Integrity Pact that occurred in the last 10 years
Year Name of client Details of Transgression of Integrity Pact by the bidder
4.0 OTHER INFORMATION
4.1 Current Contract Commitments of works in progress
Bidders (individual firms or each partners of JV) should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
4.2 Financial Data:
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-17
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Declaration for tax exemptions, reductions, allowances or benefits)
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
1 We confirm that we are solely responsible for obtaining following tax exemptions, reductions, allowances or benefits in respect of supplies under the subject package, in case of award. We further confirm that we have considered the same in our bid thereby passing on the benefit to POWERGRID while quoting our prices. In case of our failure to receive such benefits, partly or fully, for any reason whatsoever, the Employer will not compensate us.
2 We are furnishing the following information required by the Employer for issue of requisite certificate if and as permitted in terms of the applicable Govt. of India policies/procedures (in case of award):
Applicable Act, Notification No. and Clause Ref. No. Sl. No. Description of item on which applicable Country of origin Remarks, if any
(The requirements listed above are as per current Notification of Govt. of India indicated above. These may be modified, if necessary, in terms of the Notifications.)
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-17
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : …… ……. …….. …… ……. …….. Power Grid Corporation of India Ltd.,
Address : …… ……. …….. …… ……. …….. "Saudamini", Plot No. 2, Sector 29
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-17
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(Information regarding Ex-employees of POWERGRID in our Organisation)
Name(s) and Addresse(s) of other partner(s) To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-18
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
Safety Pact is annexed separately herewith this Volume.
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Attachment-19
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Bidder’s Name and Address : To:
Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No. 2, Sector 29
Gurugram (Haryana) - 122001
Further, we hereby confirm that except as mentioned in the Attachment – 6 (Alternative, Deviations and Exceptions to the Provisions) hereof forming part of our First Envelope :
Date : Printed Name :
Place : Designation :
Specification No. :CC/NT/W-COND/DOM/A04/26/14123 Bid Form 1st Envelope 1 one 1 st 1 January
2 two 2 nd 2 February
BID FORM (First Envelope) 3 three 3 rd 3 March
4 four 4 th 4 April
Bid Proposal Ref. No. 5 five 5 th 5 May
Date : 6 six 6 th #VALUE! 6 June
7 seven 7 th #VALUE! 7 July
To: 8 eight 8 th #VALUE! 8 August
Contract Services 9 nine 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 ten 10 th 10 October
"Saudamini", Plot No. 2, Sector 29 11 eleven 11 th 11 November
Gurugram (Haryana) - 122001 12 twelve 12 th 12 December
13 thirteen 13 th
14 fourteen 14 th
Name of Contract : Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA). 15 fifteen 15 th
Dear Ladies and/or Gentlemen, Enter details here. 0 16 sixteen 16 th
1.0 Having examined the Bidding Documents, including Amendment Nos. ...[Enter the Amendment]… dated …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). ...[Enter the Amendment]… …[Enter the Date in dd-mm-yyyy]… the receipt of which is hereby acknowledged, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial operation, Performance & Guarantee Test as per the provision of Technical Specification) the Facilities under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 9.1 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid, in two envelopes i.e. First Envelope – Techno – Commercial Part & Second Envelope - Price Part (to be opened subsequently). 17 seventeen 17 th
1.1 We meet the eligibility requirements and have no conflict of interest in accordance with ITB Clause 2
2.0 Attachments to the Bid Form (First Envelope) Bank Draft 18 eighteen 18 th
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments: Date Month Year Pay Order 19 nineteen 19 th
(a) Attachment 1(OH01) : Not Applicable Bank Guarantee INR Banks certified Cheque Zero 20 twenty 20 th
(b) Attachment 2(OH01) : A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 14. Bank Guarantee (0) 21 st
(c) Attachment 3(OH01) : The documentary evidence that we are eligible to bid in accordance with ITB Clause 2. Further, in terms of ITB Clause 9.3 (c) & (e), the qualification data has been furnished as per your format enclosed with the bidding documents Attachment-3(QR). 22 th
Further, the required Joint Venture Agreement signed by us and our Partners has also been furnished as per your format Attachment-3(JV). SOLE BIDDER Applicable 23 th
Further the required deed of Joint Undertaking signed by us and Tower Manufacturer has also been furnished as per your format. 0 1 Not Applicable 24 th
(d) Attachment 4(OH01) : The documentary evidence establishing in accordance with ITB Clause 3, Vol.-I of the Bidding Documents that the facilities offered by us are eligible facilities and conform to the Bidding Documents has been furnished as Attachment 4. A list of Special Tools & Tackles to be used by us for erection, testing & Commissioning and to be handed over to Employer, the cost of which is included is our Bid Price, is also enclosed as per your format as Attachment 4A. A list of Special Tools & Tackles to be brought by the contractor for erection, testing & Commissioning and to be taken back after completion of work, whose cost in not included in our bid price, is enclosed as per your format as Attachment 4B. 25 th
(e) Attachment 5(OH01) : The details of all major items of services or supply which we propose subletting in case of award, giving details of the name and nationality of the proposed subcontractor/sub-vendor for each item. 26 th
(f) Attachment 5A(OH01) : (Items, Components, Raw Material, Services proposed to be sourced from Micro and Small Enterprises): The details of the items, components, raw material, services which is proposed to bought/availed from Micro and Small Enterprises for the purpose of completion of works 27 th
(g) Attachment 6(OH01) : The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings (excluding critical provisions as mentioned at clause 6.0 below) in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein. 28 th
(h) Attachment 7(OH01) : The details of Alternative Bids made by us indicating the complete Technical Specifications and the deviation to contractual and commercial conditions. (Not Applicable) 29 th
(i) Attachment 8(OH01) : Manufacturer’s Authorisation Forms. 30 th
(j) Attachment 9(OH01) : Work Completion Schedule. 31 st
(k) Attachment 10(OH01) : Guarantee Declaration.
(l) Attachment 11(OH01) : Information regarding ex-employees of Employer in our firm.
(m) Attachment 12(OH01) : Filled up information regarding Price Adjustment Data as per the format enclosed in the bidding documents.
(n) Attachment 13(OH01) : Declaration regarding Social Accountability.
(o) Attachment 14(OH01) : Integrity Pact, in a separate envelope, duly signed on each page by the person signing the bid.
(p) Attachment 15(OH01) : Option for Interest Bearing Advance(s) (Initial Advance and/or Engineering Advance) and Information for E-payment, PF details and declaration regarding Micro/Small & Medium Enterprises
(q) Attachment 16(OH01) : Additional Information.
(r) Attachment 17(OH01) : Declaration for tax exemptions, reductions, allowances or benefits
(s) Attachment 18(OH01) : Safety Pact
(t) Attachment 19 (OH01) : Declaration.
(u) Attachment 20 (OH01) : Declaration of Key Managerial Person jointly with Power of Attorney holder
(v) Attachment 21 (OH01) : Affidavit of Self certification regarding Minimum Local Content in line with PPP-MII order, if applicable
(w) Attachment 22 (OH01) : VOID
(x) Attachment 23 (OH01) : Affidavit of Self certification regarding Domestic Value Addition in Iron &Steel Products in line with DMI&SP policy
(y) Attachment 24 (OH01) : Compliance to the process related to the e-RA Terms & Conditions and the Business Rules governing the e-RA.
(z) Attachment 25 (OH01) : Declaration by the Bidder regarding events encountered pursuant to ITB Clause 2.1
(aa) Attachment 26 (OH01) : Certification by the Bidder as per DoE Order in line with ITB Clause 2.1
(ab) Attachment 27 (OH01) : Bid Securing Declaration
(ac) Attachment 28 (OH01) : Unequivocal consent of the proposed Sub-Contractor (Refer Clause 1.2(b) and Notes#8 to Technical Experience of the stipulated Qualification Requirements (QR) enclosed at Annexure-A (BDS)).
(ad) Attachment 29 (OH01) : Capacity, Capability and Experience of Sub-Contractor (Refer Clause 1.2(b) of the stipulated Qualification Requirements (QR) enclosed at Annexure-A (BDS)).
(ae) Attachment 30 (OH01) : Undertaking regarding submission of original/Hard copy part of the bid
(af) Attachment 31 (OH01) : Declaration by the bidder for ‘Code of Integrity for Public procurement’
(ag) Attachment 32 (OH01) : Declaration by the bidder for Acknowledgement and Acceptance of Supplier Code of Conduct
2.2 We are a Micro and Small Enterprise (MSE) registered with
a designated Authority of GoI under the Public Procurement Policy for MSEs order 2012, Notification dated 01/06/2020 and 26/06/2020 including subsequent amendments, read in conjunction with related notifications issued from time to time for such enterprises. (applicable for MSE only)
3.0 We are aware that, in line with Clause No. 27.1 (ITB), our Second Envelope (Price Part) is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in this First Envelope.
4.0 We confirm that except as otherwise specifically provided our Bid Prices in Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods
5.0 Construction of the Contract
5.1 We declare that we have studied Clause GCC 2.1 relating to mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us two separate Contracts viz ‘First Contract’ for ex-works supply of all equipment and materials including mandatory spares and ‘Second Contract’ for providing all the services i.e. inland transportation for delivery at site, insurance, unloading, storage, handling at site, installation, testing and commissioning including Trial operation in respect of all the equipment supplied under the ‘First Contract’ and other services specified in the Contract Documents. We declare that the award of two contracts, will not, in any way, dilute our responsibility for successful operation of plant/equipment and fulfillment of all obligations as per Bidding Documents and that both the Contracts will have a cross-fall breach clause i.e. a breach in one Contract will automatically be classified as a breach of the other contract which will confer on you the right to terminate the other contract at our risk and cost.
6.0 We have read the provisions of following clauses and confirm that the specified stipulations of these clauses are acceptable to us:
(a) GCC 2.14 Governing Law
(b) GCC 5.7 Contractors Responsibility
(c) GCC 8 Terms of Payment
(d) GCC 9.3 Performance Security
(e) GCC 10 Taxes and Duties
(f) GCC 21.2 Completion Time Guarantee
(g) GCC 22 Defect Liability
(h) GCC 23 Functional Guarantee
(i) GCC 25 Patent Indemnity
(j) GCC 26 Limitation of Liability
(k) GCC 38 Settlement of Disputes
(l) GCC 39 Arbitration
(m) GCC 40 Conciliation
(n) Appendix 2 to Form of Contract Agreement Price Adjustment
Further we understand that deviation taken in any of the above clauses by us may make our bid non-responsive as per provision of bidding documents and be rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification of Award to us, and to achieve the delivery of goods and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of Six (06) months from the date fixed for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period.
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 Commissions or gratuities, if any, paid or to be paid by us to agents relating to this Bid, and to contract execution, if we are awarded the contract, are listed below:-
Name and Address of Agent Amount and Currency Purpose of Commission or Gratuity
(If none, state “none”)
13.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
14.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
15.0 We, hereby, declare that we, along with our associate/ collaborators/ sub-contractors/ sub-vendors/consultants/ service providers shall strictly adhere to the POWERGRID Whistle Blower and Fraud Prevention Policy. We, along with our associate / collaborator / subcontractors / sub-vendors / consultants / service providers shall observe the highest standard of ethics and shall not indulge or allow anybody else working in our organization to indulge in fraudulent activities during execution of the contract and would immediately apprise the Employer about any fraud or suspected fraud as soon as it comes to our notice.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him
Other Partner -1 Other Partner -2 2
Printed Name : Printed Name :
Designation : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(OH01) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2(OH01) Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Package Name Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
Package Code OH01 Bought-out
Specification No. CC/NT/W-COND/DOM/A04/26/14123
CC/NT/W-COND/DOM/A04/26/14123
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-4, Sch-6, Sch-8, Discount and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-7 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● Fill up applicable rate of Excise Duty. The amount of Excise Duty on the items mentioned as Direct in the mode of transaction in Schedule-1 shall be calculated automatically at the rate mentioned by the bidder here.
● Segregate and fill up the amount on which Sales Tax shall be applicable out of Ex-works supply items mentioned as direct in the mode of transaction in Schedule-1. Applicable Excise Duty on this amount will be calculated automatically at the rate mentioned by the bidder. Further, fill up the rate of applicable Sales Tax. Amount of Sales Tax shall be automatically calculated on the amount mentioned by the bidder as subjected to Sales Tax plus applicable Excise Duty at the rate mentioned by the Bidder.
● Difference of total amount quoted by the bidder as Direct Transaction and the amount mentioned by him subjected to Sales Tax shall be considered as the amount on which VAT shall become applicable and the same shall be calculated & displayed automatically. Applicable Excise Duty on this amount at the rate mentioned by the bidder shall also be calculated & displayed automatically. Fill up the rate of applicable VAT. The amount of VAT shall be calculated automatically on the amount considered to be subjected to VAT plus applicable Excise Duty at the rate mentioned by the bidder here.
● Amount as per details filled up by the bidder in the work sheets Entry Tax, Octroi and other Taxes & Duties shall be displayed in this work sheet Sch-5 but will not be added to the grand total and shall be considered as applicable.
● Click at the links to go to the work sheets Entry Tax, Octroi and other Taxes & Duties one by one.
● Fill the description, amount and rate of applicable Entry Tax. Total of this worksheet shall be displayed in Sch -5 (Taxes & Duties)
● Click at the link to go back to Sch-5.
● Fill the description, amount and rate of applicable Octroi. Total of this worksheet shall be displayed in Sch -5 (Taxes & Duties)
● Click at the link to go back to Sch-5.
Other Taxes & Duties :
● Fill the description, amount and rate of applicable Other Taxes & Duties. Total of this worksheet shall be displayed in Sch -5 (Taxes & Duties)
● Click at the link to go back to Sch-5.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Fill up the rates & location where type tests are proposed.
● Total of this Sch-7 shall automatically appear in Sch-1.
Bid form 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
CC/NT/W-COND/DOM/A04/26/14123 Sole Bidder 1
JV (Joint Venture) Other Partner
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder 1 0
Name of Sole Bidder
Address of Sole Bidder
Name of other Partner - 2 (more, if any)
Address of other Partner - 2 (more, if any)
CC/NT/W-COND/DOM/A04/26/14123 Schedule-1
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : Contract Services 0
Name : Power Grid Corporation of India Ltd., 0
Address : "Saudamini", Plot No.-2 JOINT VENTURE OF 0 & 0
Gurgaon (Haryana) - 122001
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted.
(All Prices are in Indian Rupees)
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘6’ is confirmed. If not indicate applicable the HSN code # Rate of GST applicable ( in %) Whether rate of GST in column ‘8’ is confirmed. If not indicate applicable rate of GST # Item Description Unit Qty. Unit Ex-Works Price (excluding GST) Total Ex-Works Price (excluding GST)
I Recond Gooty-Tumkur 400kV D/C-HTLS
1 7000038559 10 Conductor 1000064223 76169990 18 HTLS CONDUCTOR FOR 400KV TL KM 1263 INCLUDED 0 0 0.00 0.00 0.00 0.00
2 7000038559 20 HTLS CLAMPS & FITTINGS 1000064233 76169990 18 SUSPENSION CLAMP (FREE CENTRE TYPE SUSPENSION CLAMP ALONG WITHPREFORMED ARMOUR RODS OR ARMOUR GRIP SUSPENSION CLAMP) SUITABLE FORSUSPENSION INSULATOR STRING FOR HTLS CONDUCTOR FOR 400KV TL EA 2640 INCLUDED 0 0 0.00 0.00 0.00 0.00
3 7000038559 30 HTLS CLAMPS & FITTINGS 1000064235 76169990 18 SUSPENSION CLAMP SUITABLE FOR SUSPENSION PILOT INSULATOR STRING FORHTLS CONDUCTOR FOR 400KV TL EA 336 INCLUDED 0 0 0.00 0.00 0.00 0.00
4 7000038559 40 HTLS CLAMPS & FITTINGS 1000064221 76169990 18 DEAD END CLAMP SUITABLE FOR TENSION INSULATOR STRING FOR HTLSCONDUCTOR FOR 400KV TL EA 1560 INCLUDED 0 0 0.00 0.00 0.00 0.00
5 7000038559 50 HTLS CLAMPS & FITTINGS 1000019805 73082011 18 Hardware Fittings for Twin HTLS Conductor-Single "I" Suspension String(without clamps) SET 960 INCLUDED 0 0 0.00 0.00 0.00 0.00
6 7000038559 60 HTLS CLAMPS & FITTINGS 1000019783 73082011 18 Hardware Fittings for Twin HTLS Conductor-Single I Suspension String(Pilot)(without clamps) SET 168 INCLUDED 0 0 0.00 0.00 0.00 0.00
7 7000038559 70 HTLS CLAMPS & FITTINGS 1000010803 73082011 18 Hardware Fittings for Twin HTLS Conductor-Double TensionString(without clamps) SET 780 INCLUDED 0 0 0.00 0.00 0.00 0.00
8 7000038559 80 HTLS CLAMPS & FITTINGS 1000010766 73082011 18 Hardware Fittings for Twin HTLS Conductor-Double I SuspensionString(without clamps) SET 360 INCLUDED 0 0 0.00 0.00 0.00 0.00
9 7000038559 90 Conductor Accessories 1000064225 76169990 18 MID SPAN COMPRESSION JOINT FOR HTLS CONDUCTOR FOR 400KV TL EA 556 INCLUDED 0 0 0.00 0.00 0.00 0.00
10 7000038559 100 Conductor Accessories 1000064227 76169990 18 REPAIR SLEEVE FOR HTLS CONDUCTOR FOR 400KV TL EA 167 INCLUDED 0 0 0.00 0.00 0.00 0.00
11 7000038559 110 Conductor Accessories 1000064231 76169990 18 SPACER DAMPER FOR HTLS CONDUCTOR-FOR 400KV TL EA 11928 INCLUDED 0 0 0.00 0.00 0.00 0.00
12 7000038559 120 Conductor Accessories 1000064229 76169990 18 RIGID SPACER FOR HTLS CONDUCTOR-FOR 400KV TL EA 1152 INCLUDED 0 0 0.00 0.00 0.00 0.00
13 7000038559 130 Conductor Accessories 1000064237 76169990 18 T-CONNECTOR FOR HTLS CONDUCTOR-FOR 400KV TL EA 32 INCLUDED 0 0 0.00 0.00 0.00 0.00
14 7000038559 140 SPARE- HTLS CONDUCTOR 1000064223 76169990 18 HTLS CONDUCTOR FOR 400KV TL KM 40 INCLUDED 0 0 0.00 0.00 0.00 0.00
15 7000038559 150 SPARE- CLAMP FITTINGS 1000064233 76169990 18 SUSPENSION CLAMP (FREE CENTRE TYPE SUSPENSION CLAMP ALONG WITHPREFORMED ARMOUR RODS OR ARMOUR GRIP SUSPENSION CLAMP) SUITABLE FORSUSPENSION INSULATOR STRING FOR HTLS CONDUCTOR FOR 400KV TL EA 120 INCLUDED 0 0 0.00 0.00 0.00 0.00
16 7000038559 160 SPARE- CLAMP FITTINGS 1000064235 76169990 18 SUSPENSION CLAMP SUITABLE FOR SUSPENSION PILOT INSULATOR STRING FORHTLS CONDUCTOR FOR 400KV TL EA 12 INCLUDED 0 0 0.00 0.00 0.00 0.00
17 7000038559 170 SPARE- CLAMP FITTINGS 1000064221 76169990 18 DEAD END CLAMP SUITABLE FOR TENSION INSULATOR STRING FOR HTLSCONDUCTOR FOR 400KV TL EA 96 INCLUDED 0 0 0.00 0.00 0.00 0.00
18 7000038559 180 SPARE- CLAMP FITTINGS 1000019805 73082011 18 Hardware Fittings for Twin HTLS Conductor-Single "I" Suspension String(without clamps) SET 19 INCLUDED 0 0 0.00 0.00 0.00 0.00
19 7000038559 190 SPARE- CLAMP FITTINGS 1000019783 73082011 18 Hardware Fittings for Twin HTLS Conductor-Single I Suspension String(Pilot)(without clamps) SET 3 INCLUDED 0 0 0.00 0.00 0.00 0.00
20 7000038559 200 SPARE- CLAMP FITTINGS 1000010803 73082011 18 Hardware Fittings for Twin HTLS Conductor-Double TensionString(without clamps) SET 16 INCLUDED 0 0 0.00 0.00 0.00 0.00
21 7000038559 210 SPARE- CLAMP FITTINGS 1000010766 73082011 18 Hardware Fittings for Twin HTLS Conductor-Double I SuspensionString(without clamps) SET 7 INCLUDED 0 0 0.00 0.00 0.00 0.00
22 7000038559 220 SPARE-CONDUCTOR ACCESSORIES 1000064225 76169990 18 MID SPAN COMPRESSION JOINT FOR HTLS CONDUCTOR FOR 400KV TL EA 50 INCLUDED 0 0 0.00 0.00 0.00 0.00
23 7000038559 230 SPARE-CONDUCTOR ACCESSORIES 1000064227 76169990 18 REPAIR SLEEVE FOR HTLS CONDUCTOR FOR 400KV TL EA 50 INCLUDED 0 0 0.00 0.00 0.00 0.00
24 7000038559 240 SPARE-CONDUCTOR ACCESSORIES 1000064231 76169990 18 SPACER DAMPER FOR HTLS CONDUCTOR-FOR 400KV TL EA 504 INCLUDED 0 0 0.00 0.00 0.00 0.00
25 7000038559 250 SPARE-CONDUCTOR ACCESSORIES 1000064229 76169990 18 RIGID SPACER FOR HTLS CONDUCTOR-FOR 400KV TL EA 36 INCLUDED 0 0 0.00 0.00 0.00 0.00
26 7000038559 260 SPARE-CONDUCTOR ACCESSORIES 1000064237 76169990 18 T-CONNECTOR FOR HTLS CONDUCTOR-FOR 400KV TL EA 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
27 7000038559 270 FABRICATION & SUPPLY (ASSORTED MEMBERS) 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts fortowers including Step Bolts,SpringWashers etc. MT 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
28 7000038559 280 FABRICATION & SUPPLY (ASSORTED MEMBERS) 1000064591 73082011 18 SUPPLY OF ASSORTED TOWER MEMBERS HT MT 20 INCLUDED 0 0 0.00 0.00 0.00 0.00
29 7000038559 290 FABRICATION & SUPPLY (ASSORTED MEMBERS) 1000064592 73082011 18 SUPPLY OF ASSORTED TOWER MEMBERS MS MT 5 INCLUDED 0 0 0.00 0.00 0.00 0.00
30 7000038559 300 SHIELDWIRE EARTHING 1000019718 73082011 18 Supply of Shieldwire EarthingincludingPG clamps, downlead clampsbutexcluding Earthwire bits for Pipetypeearthing EA 6 INCLUDED 0 0 0.00 0.00 0.00 0.00
31 7000038559 310 SHIELDWIRE EARTHING 1000019717 73082011 18 Supply of Shieldwire EarthingincludingPG clamps, downlead clampsbutexcluding Earthwire bitsforCounterpoise type earthing EA 9 INCLUDED 0 0 0.00 0.00 0.00 0.00
32 7000038559 320 COMPOSITE LONG ROD INSULATOR 1000009328 85469090 18 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 1560 INCLUDED 0 0 0.00 0.00 0.00 0.00
33 7000038559 330 COMPOSITE LONG ROD INSULATOR 1000084105 85469090 18 COMPOSITE LONG ROD INSULATORS FOR 400KV TRANSMISSION LINE-120KN(LENGTH-3375 MM, CREEPAGE-13020 MM) EA 1848 INCLUDED 0 0 0.00 0.00 0.00 0.00
34 7000038559 340 SPARE- CLR INSULATOR 1000084105 85469090 18 COMPOSITE LONG ROD INSULATORS FOR 400KV TRANSMISSION LINE-120KN(LENGTH-3375 MM, CREEPAGE-13020 MM) EA 185 INCLUDED 0 0 0.00 0.00 0.00 0.00
35 7000038559 350 SPARE- CLR INSULATOR 1000009328 85469090 18 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 156 INCLUDED 0 0 0.00 0.00 0.00 0.00
36 7000038559 360 SPECIAL TOOLS & TACKLES FOR HTLS 8000002295 85389000 18 SUPPLY OF ONE SET OF ALL THE SPECIAL TOOLS & TACKLES REQUIRED FORSTRINGING OF THE OFFERED HTLS CONDUCTOR LS 1 INCLUDED 0 0 0.00 0.00 0.00 0.00
37 7000038559 440 TOWER ACCESSORIES 1000010539 73082011 18 Danger Plate for 400kV EA 284 INCLUDED 0 0 0.00 0.00 0.00 0.00
38 7000038559 450 TOWER ACCESSORIES 1000015971 73082011 18 Number Plate for 400kV EA 284 INCLUDED 0 0 0.00 0.00 0.00 0.00
39 7000038559 460 TOWER ACCESSORIES 1000017508 73082011 18 Phase Plate (Set of three) SET 568 INCLUDED 0 0 0.00 0.00 0.00 0.00
40 7000038559 470 TOWER ACCESSORIES 1000009119 73082011 18 Circuit Plate (Set of two) SET 284 INCLUDED 0 0 0.00 0.00 0.00 0.00
41 7000038559 480 TOWER ACCESSORIES 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbedWire Type SET 100 INCLUDED 0 0 0.00 0.00 0.00 0.00
42 7000038559 490 TOWER ACCESSORIES 1000007735 73082011 18 Bird Guard (Set of Three) SET 300 INCLUDED 0 0 0.00 0.00 0.00 0.00
44 7000038559 520 Insulation Sleeve 1000050789 76169990 18 INSULATION SLEEVE FOR CONDUCTOR M 200 INCLUDED 0 0 0.00 0.00 0.00 0.00
Total Ex-Works Price 0.00 0.00 0.00 0.00 0.00
Total Type Test charges as per Schedule-7 0.00
Total Ex-Works Price including Type Test charges 0.00
# In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date Printed Name
Place Designation
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 2
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Local Transportation, In-transit Insurance, Loading and Unloading
(All Prices are in Indian Rupees)
SI. No. PR No PR Line Item No Activity Description Material Code Description Unit Quantity Unit Freight, In-transit Insurance, loading & Unloading Charges Total Freight, In-transit Insurance, loading & Unloading Charges
I Recond Gooty-Tumkur 400kV D/C-HTLS
1 7000038559 10 Conductor 1000064223 HTLS CONDUCTOR FOR 400KV TL KM 1263 INCLUDED
2 7000038559 20 HTLS CLAMPS & FITTINGS 1000064233 SUSPENSION CLAMP (FREE CENTRE TYPE SUSPENSION CLAMP ALONG WITHPREFORMED ARMOUR RODS OR ARMOUR GRIP SUSPENSION CLAMP) SUITABLE FORSUSPENSION INSULATOR STRING FOR HTLS CONDUCTOR FOR 400KV TL EA 2640 INCLUDED
3 7000038559 30 HTLS CLAMPS & FITTINGS 1000064235 SUSPENSION CLAMP SUITABLE FOR SUSPENSION PILOT INSULATOR STRING FORHTLS CONDUCTOR FOR 400KV TL EA 336 INCLUDED
4 7000038559 40 HTLS CLAMPS & FITTINGS 1000064221 DEAD END CLAMP SUITABLE FOR TENSION INSULATOR STRING FOR HTLSCONDUCTOR FOR 400KV TL EA 1560 INCLUDED
5 7000038559 50 HTLS CLAMPS & FITTINGS 1000019805 Hardware Fittings for Twin HTLS Conductor-Single "I" Suspension String(without clamps) SET 960 INCLUDED
6 7000038559 60 HTLS CLAMPS & FITTINGS 1000019783 Hardware Fittings for Twin HTLS Conductor-Single I Suspension String(Pilot)(without clamps) SET 168 INCLUDED
7 7000038559 70 HTLS CLAMPS & FITTINGS 1000010803 Hardware Fittings for Twin HTLS Conductor-Double TensionString(without clamps) SET 780 INCLUDED
8 7000038559 80 HTLS CLAMPS & FITTINGS 1000010766 Hardware Fittings for Twin HTLS Conductor-Double I SuspensionString(without clamps) SET 360 INCLUDED
9 7000038559 90 Conductor Accessories 1000064225 MID SPAN COMPRESSION JOINT FOR HTLS CONDUCTOR FOR 400KV TL EA 556 INCLUDED
10 7000038559 100 Conductor Accessories 1000064227 REPAIR SLEEVE FOR HTLS CONDUCTOR FOR 400KV TL EA 167 INCLUDED
11 7000038559 110 Conductor Accessories 1000064231 SPACER DAMPER FOR HTLS CONDUCTOR-FOR 400KV TL EA 11928 INCLUDED
12 7000038559 120 Conductor Accessories 1000064229 RIGID SPACER FOR HTLS CONDUCTOR-FOR 400KV TL EA 1152 INCLUDED
13 7000038559 130 Conductor Accessories 1000064237 T-CONNECTOR FOR HTLS CONDUCTOR-FOR 400KV TL EA 32 INCLUDED
14 7000038559 140 SPARE- HTLS CONDUCTOR 1000064223 HTLS CONDUCTOR FOR 400KV TL KM 40 INCLUDED
15 7000038559 150 SPARE- CLAMP FITTINGS 1000064233 SUSPENSION CLAMP (FREE CENTRE TYPE SUSPENSION CLAMP ALONG WITHPREFORMED ARMOUR RODS OR ARMOUR GRIP SUSPENSION CLAMP) SUITABLE FORSUSPENSION INSULATOR STRING FOR HTLS CONDUCTOR FOR 400KV TL EA 120 INCLUDED
16 7000038559 160 SPARE- CLAMP FITTINGS 1000064235 SUSPENSION CLAMP SUITABLE FOR SUSPENSION PILOT INSULATOR STRING FORHTLS CONDUCTOR FOR 400KV TL EA 12 INCLUDED
17 7000038559 170 SPARE- CLAMP FITTINGS 1000064221 DEAD END CLAMP SUITABLE FOR TENSION INSULATOR STRING FOR HTLSCONDUCTOR FOR 400KV TL EA 96 INCLUDED
18 7000038559 180 SPARE- CLAMP FITTINGS 1000019805 Hardware Fittings for Twin HTLS Conductor-Single "I" Suspension String(without clamps) SET 19 INCLUDED
19 7000038559 190 SPARE- CLAMP FITTINGS 1000019783 Hardware Fittings for Twin HTLS Conductor-Single I Suspension String(Pilot)(without clamps) SET 3 INCLUDED
20 7000038559 200 SPARE- CLAMP FITTINGS 1000010803 Hardware Fittings for Twin HTLS Conductor-Double TensionString(without clamps) SET 16 INCLUDED
21 7000038559 210 SPARE- CLAMP FITTINGS 1000010766 Hardware Fittings for Twin HTLS Conductor-Double I SuspensionString(without clamps) SET 7 INCLUDED
22 7000038559 220 SPARE-CONDUCTOR ACCESSORIES 1000064225 MID SPAN COMPRESSION JOINT FOR HTLS CONDUCTOR FOR 400KV TL EA 50 INCLUDED
23 7000038559 230 SPARE-CONDUCTOR ACCESSORIES 1000064227 REPAIR SLEEVE FOR HTLS CONDUCTOR FOR 400KV TL EA 50 INCLUDED
24 7000038559 240 SPARE-CONDUCTOR ACCESSORIES 1000064231 SPACER DAMPER FOR HTLS CONDUCTOR-FOR 400KV TL EA 504 INCLUDED
25 7000038559 250 SPARE-CONDUCTOR ACCESSORIES 1000064229 RIGID SPACER FOR HTLS CONDUCTOR-FOR 400KV TL EA 36 INCLUDED
26 7000038559 260 SPARE-CONDUCTOR ACCESSORIES 1000064237 T-CONNECTOR FOR HTLS CONDUCTOR-FOR 400KV TL EA 6 INCLUDED
27 7000038559 270 FABRICATION & SUPPLY (ASSORTED MEMBERS) 1000013472 Supply of Hexagonal Bolts & Nuts fortowers including Step Bolts,SpringWashers etc. MT 5 INCLUDED
28 7000038559 280 FABRICATION & SUPPLY (ASSORTED MEMBERS) 1000064591 SUPPLY OF ASSORTED TOWER MEMBERS HT MT 20 INCLUDED
29 7000038559 290 FABRICATION & SUPPLY (ASSORTED MEMBERS) 1000064592 SUPPLY OF ASSORTED TOWER MEMBERS MS MT 5 INCLUDED
30 7000038559 300 SHIELDWIRE EARTHING 1000019718 Supply of Shieldwire EarthingincludingPG clamps, downlead clampsbutexcluding Earthwire bits for Pipetypeearthing EA 6 INCLUDED
31 7000038559 310 SHIELDWIRE EARTHING 1000019717 Supply of Shieldwire EarthingincludingPG clamps, downlead clampsbutexcluding Earthwire bitsforCounterpoise type earthing EA 9 INCLUDED
32 7000038559 320 COMPOSITE LONG ROD INSULATOR 1000009328 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 1560 INCLUDED
33 7000038559 330 COMPOSITE LONG ROD INSULATOR 1000084105 COMPOSITE LONG ROD INSULATORS FOR 400KV TRANSMISSION LINE-120KN(LENGTH-3375 MM, CREEPAGE-13020 MM) EA 1848 INCLUDED
34 7000038559 340 SPARE- CLR INSULATOR 1000084105 COMPOSITE LONG ROD INSULATORS FOR 400KV TRANSMISSION LINE-120KN(LENGTH-3375 MM, CREEPAGE-13020 MM) EA 185 INCLUDED
35 7000038559 350 SPARE- CLR INSULATOR 1000009328 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 156 INCLUDED
36 7000038559 360 SPECIAL TOOLS & TACKLES FOR HTLS 8000002295 SUPPLY OF ONE SET OF ALL THE SPECIAL TOOLS & TACKLES REQUIRED FORSTRINGING OF THE OFFERED HTLS CONDUCTOR LS 1 INCLUDED
37 7000038559 440 TOWER ACCESSORIES 1000010539 Danger Plate for 400kV EA 284 INCLUDED
38 7000038559 450 TOWER ACCESSORIES 1000015971 Number Plate for 400kV EA 284 INCLUDED
39 7000038559 460 TOWER ACCESSORIES 1000017508 Phase Plate (Set of three) SET 568 INCLUDED
40 7000038559 470 TOWER ACCESSORIES 1000009119 Circuit Plate (Set of two) SET 284 INCLUDED
41 7000038559 480 TOWER ACCESSORIES 1000006779 Supply of Anti-Climbing Devices ofBarbedWire Type SET 100 INCLUDED
42 7000038559 490 TOWER ACCESSORIES 1000007735 Bird Guard (Set of Three) SET 300 INCLUDED
43 7000038559 500 Earthwire 1000030841 7/3.66 G.S. EARTHWIRE KM 4 INCLUDED
44 7000038559 520 Insulation Sleeve 1000050789 INSULATION SLEEVE FOR CONDUCTOR M 200 INCLUDED
TOTAL FOR Local Transportation, In-transit Insurance, Loading and Unloading 0.00
Date Printed Name
Place Designation
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 3
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Installation Charges : (All Prices are in Indian Rupees)
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column ‘8’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘10’ is confirmed. If not indicate applicable rate of GST # Description Unit Quantity Unit Erection Charges (excluding GST) Total Erection Charges (excluding GST) GST Before Discount Discount Total Price after discount GST After Discount
I Recond Gooty-Tumkur 400kV D/C-HTLS
1 7000038559 370 130 10 PROFILING-EXISTING LINE 100002803 998344 18 Profiling of existing line route covering ground profile, locating towers, verification of sag profile of high capacity conductor atmaximum operating temperature & varification of clearances etc. employing Total Stations & PLSS CAD software. KM 104.18 INCLUDED 0 0 0.0000000000 0 0 0.00
2 7000038559 380 140 10 STRINGING 100017997 995468 18 Installation of necessary hardware, hoisting of insulator Strings, Installing and Stringing of Twin High capacity conductorincluding fixing of conductor accessories for reconductoring of existing 400kv D/C line KM 104.18 INCLUDED 0 0 0.0000000000 0 0 0.00
3 7000038559 380 140 20 STRINGING 100055162 995468 18 Installation of insulator strings complete with arcing horns and necessary hardware, installation and stringing of conductorincluding fixing of conductor accessories for powerline crossing location under live line condition. EA 15 INCLUDED 0 0 0.0000000000 0 0 0.00
4 7000038559 380 140 30 STRINGING 100056872 995469 18 Cable bypass arrangement of 11KV Powerline crossing including arrangement of required cables and all other accessories, works, etcfor bypass arrangement and restoration of line. EA 50 INCLUDED 0 0 0.0000000000 0 0 0.00
5 7000038559 380 140 40 STRINGING 100056873 995469 18 Cable bypass arrangement of 33KV Powerline crossing including arrangement of required cables and all other accessories,works etc forbypass arrangement and restoration of line. EA 15 INCLUDED 0 0 0.0000000000 0 0 0.00
6 7000038559 380 140 50 STRINGING 100056874 995469 18 Cable bypass arrangement of LT lines including arrangement of required cables and all other accessories, works etc for bypassarrangement and restoration of line. EA 180 INCLUDED 0 0 0.0000000000 0 0 0.00
7 7000038559 390 150 10 DESTRINGING 100057486 995468 18 Destringing of existing 400kV D/C (Twin) line excluding Earth wire/OPGW KM 104.18 INCLUDED 0 0 0.0000000000 0 0 0.00
8 7000038559 400 160 10 ERECTION 100038034 995455 18 Fixing of Asrt Tower parts in Erct Tower MT 30 INCLUDED 0 0 0.0000000000 0 0 0.00
9 7000038559 410 170 10 INSTALLATION SHIELDWIRE EARTHING 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 6 INCLUDED 0 0 0.0000000000 0 0 0.00
10 7000038559 410 170 20 INSTALLATION SHIELDWIRE EARTHING 100002203 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/counterpoisetype)-Counterpoise type EA 9 INCLUDED 0 0 0.0000000000 0 0 0.00
11 7000038559 420 180 10 PAINTING (STUB) 170002651 995419 18 PAINTING OF TOWER LEGS EA 10 INCLUDED 0 0 0.0000000000 0 0 0.00
12 7000038559 430 190 10 LABOUR FACILITIES 100023085 995455 18 ESTABLISHMENT OF LABOUR CAMPS AS PER PROVISION UNDER FACILITIES TO BE INCORPORATED FOR LABOURERS IN TECHNICAL SPECIFICATION LS 1 INCLUDED 0 0 0.0000000000 0 0 0.00
13 7000038559 510 220 10 INSTALLTION OF TOWER ACCESSORIES 100001274 995444 18 Installation of tower accessories : Danger Plate EA 284 INCLUDED 0 0 0.0000000000 0 0 0.00
14 7000038559 510 220 20 INSTALLTION OF TOWER ACCESSORIES 100001275 995444 18 Installation of tower accessories: Number Plate EA 284 INCLUDED 0 0 0.0000000000 0 0 0.00
15 7000038559 510 220 30 INSTALLTION OF TOWER ACCESSORIES 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 568 INCLUDED 0 0 0.0000000000 0 0 0.00
16 7000038559 510 220 40 INSTALLTION OF TOWER ACCESSORIES 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 100 INCLUDED 0 0 0.0000000000 0 0 0.00
17 7000038559 510 220 50 INSTALLTION OF TOWER ACCESSORIES 100001278 995444 18 Installation of tower accessories: Circuit Plate (Set of two) SET 284 INCLUDED 0 0 0.0000000000 0 0 0.00
18 7000038559 510 220 60 INSTALLTION OF TOWER ACCESSORIES 100001279 995444 18 Installation of tower accessories: Bird Guard (Set of Three) SET 300 INCLUDED 0 0 0.0000000000 0 0 0.00
19 7000038559 530 240 10 Installation of Insulation Sleeve 100007299 995468 18 Installation of insulation sleeve on Conductor . M 200 INCLUDED 0 0 0.0000000000 0 0 0.00
Total of Schedule-3 0.00 0.00 0.00 0.00
# In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Date Printed Name
Place Designation
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 4
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Training Charges :
SI. No. PR No Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column ‘…’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘---’ is confirmed. If not indicate applicable rate of GST # Description Unit Quantity Unit Charges Total Charges
Place Printed Name
CC/NT/W-COND/DOM/A04/26/14123 Schedule-4(a)
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : Contract Services #REF!
Name : Power Grid Corporation of India Ltd., #REF!
Address : "Saudamini", Plot No.-2 #REF!
Gurgaon (Haryana) - 122001
Buy-back Charges (Scrap value)
(All Prices are in Indian Rupees)
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Material Code HSN Code Rate of GST applicable ( in %) Item Description Unit Qty. Unit Charges (excluding GST) Total Charges (excluding GST)
I Recond Gooty-Tumkur 400kV D/C-HTLS
1 73082011 18% De-strunged ACSR Moose Conductor along with associated clamp fittings & accessories KM 1,262.662 INCLUDED 0 #REF! 0.00 0.00 #REF! 0.00
Total Buy-back Charges (Excl. GST) 0.00 #REF! #REF! #REF! #REF!
+ Buyer (Bidder/Contractor) of the scrap/buyback material shall be liable to pay extra towards GST, TCS (Tax Collected at Source) as per Income Tax Act and other applicable taxes if any, as per actual, as per tax invoice raised by the employer.
+ Scrap/Buyback Value (excluding GST and other applicable taxes if any) shall be considered solely for bid evaluation purpose to arrive at the net evaluated price of the Bidder/Contractor.
+ However, bidders shall not be allowed to change the Scrap/Buyback value [as quoted by bidder in Schedule-4(a) {Buy Back Charges(Scrap value)} which after correction, if any, shall be indicated in the template calculation sheet provided during the e-Reverse Auction] during e-Reverse Auction.
Date Printed Name
Place Designation
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 5
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SUMMARY OF TAXES & DUTIES not included in Schedule 1 & 3)
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST on Goods 0.00 Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST on Services 0.00 Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (indentified in Schedule-3) and Training to be imparted in India (identified in Schedule-4) which are not included in the Installation and Training charges as per the provision of the Bidding Documents, as applicable #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 5
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
#REF! Contract Services
Name : #REF! Power Grid Corporation of India Ltd.,
Address : #REF! "Saudamini", Plot No.-2
#REF! Sector-29,
#REF! Gurgaon (Haryana) - 122001
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST on Goods 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST on Services 0.00
Total GST on Installation Services (indentified in Schedule-3) and Training to be imparted in India (identified in Schedule-4) which are not included in the Installation and Training charges as per the provision of the Bidding Documents, as applicable
GRAND TOTAL [1+2] 0.00
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 6
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading and unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 Not Applicable
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 4(a) 0.00
Buy-back Charges (Scrap value)
6 TOTAL SCHEDULE NO. 7 Not Applicable
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+5-6]
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 6 After Discount
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2
Local Transportation, Insurance and other Incidental Services
3 TOTAL SCHEDULE NO. 3
Installation Charges
4 TOTAL SCHEDULE NO. 4
Training Charges
5 TOTAL SCHEDULE NO. 5
Taxes and Duties
6 TOTAL SCHEDULE NO. 7
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5]
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 Schedule - 6 (After Discount)
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : Contract Services
Name : Power Grid Corporation of India Ltd.,
Address : "Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
Sl. No. Description Total Price (INR) From Sch-6 Discount Factors
1 TOTAL SCHEDULE NO. 1 0.00 0.00 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00 0.00 0.00
Local Transportation, In-transit Insurance, loading and unloading
3 TOTAL SCHEDULE NO. 3 0.00 0.00 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 Not Applicable
Training Charges
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 4(a) 0.00
Buy-back Charges (Scrap value)
7 TOTAL SCHEDULE NO. 7 Not Applicable
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+5-6]
Date : Printed Name :
Place : Designation :
CC/NT/W-COND/DOM/A04/26/14123 Schedule 7
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA). As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
Bidder’s Name and Address (Sole Bidder) : To:
Name : Contract Services
Address : Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Gurgaon (Haryana) - 122001
SL. NO. PR No Line Item No Code HSN of the Equipment /item for which type test is to be conducted Whether HSN in column ‘---’ is confirmed. If not indicate applicable the HSN code # Rate of GST applicable ( in %) Whether rate of GST in column ‘---’ is confirmed. If not indicate applicable rate of GST # Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
Date Printed Name
Place Designation
CC/NT/W-COND/DOM/A04/26/14123
Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA). 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
CC/NT/W-COND/DOM/A04/26/14123 Letter of Discount
LETTER OF DISCOUNT
Contract Services Schedule 1 0.00
Power Grid Corporation of India Ltd., Schedule 2 0.00
"Saudamini", Plot No.-2 Schedule 3 0.00
Sector-29, (near IFFCO Chowk) Total 0.00
Gurgaon (Haryana) - 122001
Subject : Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA).
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Sch-1 Sch-2 Sch-3
1 Discount on lum-sum basis on total price quoted by us without GST. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4(a) & Sch-7] In Rs. 0.00 0.00 0.00
2 Discount on percent basis on total price quoted by us without GST. [The discount shall be applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4(a) & Sch-7] In Percent (%) 0.00 0.00 0.00
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00
Schedule-2 : Local Transportation, In-transit Insurance, loading and unloading In Rs. 0.00
Schedule-3 : Installation Charges In Rs. 0.00
Schedule-4 : Training Charges In Rs.
Schedule-7 : Type Test Charges In Rs.
4 Discount on percent basis on the Schedules as given below : [The discount shall be applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00
Schedule-2 : Local Transportation, In-transit Insurance, loading and unloading In Percent (%) 0.00
Schedule-3 : Installation Charges In Percent (%) 0.00
Schedule-4 : Training Charges In Percent (%)
Schedule-7 : Type Test Charges In Percent (%)
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation. #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF!
[Discount will not be calculated authometrically. However, the same shall be considered during evaluation.]
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain, 0.00 0.00 0.00
Yours faithfully, 0.00000000 0.00000000 0.00000000 Discount Factors
For and on behalf of
Date : Printed Name : 0.00 0.00 0
Place : Designation : 0.00 0 0
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
CC/NT/W-COND/DOM/A04/26/14123 Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
0 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
"Saudamini", Plot No.-2 11 th 11 November
Sector-29, 12 th 12 December
Gurgaon (Haryana) - 122001 13 th
Name of Contract : Reconductoring Package OH01 for Re-conductoring of Gooty Tumkur (Pavgada) 400 KV D/C line with TWIN HTLS conductor. (Capacity 2100 MVA). 15 th
Dear Ladies and/or Gentlemen, 16 th
1.0 In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. 0/- () or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to design, manufacture, test, deliver, install and commission (including carrying out Trial Operation, Performance & Guarantee Test as per provision of Technical Specification) under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. 17 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. Sole Bidder 23 th
Schedule 4 Training charges for training to be imparted (Not Applicable) 24 th
Schedule 4 (a) Buy-back Charges
Schedule 5 Taxes and Duties not included in Schedule 1 to 4 25 th
Schedule 6 Grand Summary [Schedule 1 to 5] 26 th
Schedule 7 Break-up of Type Test Charges (Not Applicable) 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of test
Date : Printed Name :
Place : Designation :
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
Total Ex-Works Price Direct 0.00
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF!
Total Ex-works Price including Type Test charges #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
^ If the item(s) quoted/considered as "Bought-out" in the bid are manufactured at Bidder's works and confirmed to be supplied under “Direct transaction” by the bidder, then the taxes and duties on such items shall be paid/reimbursed by POWERGRID in line with the provisions of Bidding Documents. For this purpose, at the time of award, the Ex-works price (exclusive of taxes & duties) shall be arrived at from the quoted Ex-works price (inclusive of taxes ad duties) by excluding taxes and duties applicable on such items, as on date of Bid opening, in case of supplies from manufacturer proposed in the bid. During contract execution, the taxes and duties on such items shall be paid/reimbursed at actuals, limited to the rates prevailing on date of Bid opening.
Place : #REF! Printed Name : #REF! --
Designation : #REF!
Total F&I Price (=SUM(I16:I27))
Date : (='Sch-1'!B43)
Place : (='Sch-1'!B44) Printed Name : (='Sch-1'!E44)
Designation : (='Sch-1'!E45)
Total Installaiton Charges #REF!
Date : (='Sch-1'!B43)
Place : (='Sch-1'!B44) Printed Name : (='Sch-1'!E44)
Designation : (='Sch-1'!E45)
Date : (=IF('Sch-1'!B43=0,"", 'Sch-1'!B43)) (="Printed Name : " & IF('Sch-1'!E44=0,"",'Sch-1'!E44))
Place : (=IF('Sch-1'!B44=0,"", 'Sch-1'!B44)) (="Designation : " & IF('Sch-1'!E45=0,"",'Sch-1'!E45))
TOTAL TYPE TEST CHARGES (=SUM(I17:I18))
Date : (='Sch-1'!B43) (="Printed Name : " & 'Sch-1'!E44)
Place : (='Sch-1'!B44) (="Designation : " & 'Sch-1'!E45)
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
#REF! 0.00 #REF! 0.00 #REF!
#REF! #REF! #N/A
#REF! #REF! 0 #REF! #REF! 0
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 0 0 #REF! plus
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 0 1 #REF!
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 1 0 #REF!
#REF! #REF! #REF! 0 #REF! #REF! #REF! 0 #REF! 0 0 1 1 #REF!
#REF! 0 1 0 0 #REF!
1 One 1 One 1 One 1 One #REF! 0 1 0 1 #REF!
2 Two 2 Two 2 Two 2 Two #REF! 0 1 1 0 #REF!
3 Three 3 Three 3 Three 3 Three #REF! 0 1 1 1 #REF!
4 Four 4 Four 4 Four 4 Four #REF! 1 0 0 0 #REF!
5 Five 5 Five 5 Five 5 Five #REF! 1 0 0 1 #REF!
6 Six 6 Six 6 Six 6 Six #REF! 1 0 1 0 #REF!
7 Seven 7 Seven 7 Seven 7 Seven #REF! 1 0 1 1 #REF!
8 Eight 8 Eight 8 Eight 8 Eight #REF! 1 1 0 0 #REF!
9 Nine 9 Nine 9 Nine 9 Nine #REF! 1 1 0 1 #REF!
10 Ten 10 Ten 10 Ten 10 Ten #REF! 1 1 1 0 #REF!
11 Eleven 11 Eleven 11 Eleven 11 Eleven #REF! 1 1 1 1 #REF!
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen #REF! 0 0 0 0 #REF! +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen #REF! 0 0 0 1 #REF! /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen #REF! 0 0 1 0 #REF! /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen #REF! 0 0 1 1 #REF!
20 Twenty 20 Twenty 20 Twenty 20 Twenty #REF! 0 1 0 0 #REF!
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One #REF! 0 1 0 1 #REF!
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two #REF! 0 1 1 0 #REF!
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three #REF! 0 1 1 1 #REF!
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four #REF! 1 0 0 0 #REF!
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five #REF! 1 0 0 1 #REF!
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six #REF! 1 0 1 0 #REF!
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven #REF! 1 0 1 1 #REF!
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight #REF! 1 1 0 0 #REF!
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine #REF! 1 1 0 1 #REF!
30 Thirty 30 Thirty 30 Thirty 30 Thirty #REF! 1 1 1 0 #REF!
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One #REF! 1 1 1 1 #REF!
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Name_Of_Line Tower_No Tower_Latitude Tower_Longitude Forward_Span Type_Of_Tower No_Of_CKT CKT Position Vulnerability_Levels Name_Of_Crossing Nearest_Village Angle_Of_Deviation Comm_Length_ From GTY Comm_%_ From GTY Comm_Length_ From PGD Comm_%_ From PGD Foundation_Type Earthing_Type Wind_Zone CKT-1 TOP CKT-1 MIDDLE CKT-1 BOTTOM CKT-2 TOP CKT-2 MIDDLE CKT-2 BOTTOM
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD1 15.1505133645 77.6589757896 128 DDE+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing vannedoddi 13°33'45" RT 0.245KM 0.23% 104.755KM 99.77% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD2 15.1497303513 77.6598515015 124 DD+18 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 400 KV D/C line Xing vannedoddi 11°39'51" LT 0.369KM 0.35% 104.631KM 99.65% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD3 15.1491540555 77.660840204 340 DD+25 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 220 KV D/C line Xing vannedoddi 56°26'20" RT 0.709KM 0.68% 104.291KM 99.32% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD4 15.1460856256 77.6609663173 330 DD+18 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal vannedoddi 09°53'24" LT 1.039KM 0.99% 103.961KM 99.01% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD5 15.1431595315 77.66155032 292 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal vannedoddi 00°00'00" 1.331KM 1.27% 103.669KM 98.73% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD6 15.1405836198 77.6620644199 248 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable NH-7 Xing vannedoddi 44°13'12" LT 1.579KM 1.50% 103.421KM 98.50% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD7 15.1393055076 77.6639582047 517 DD+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable vannedoddi 24°48'39" RT 2.096KM 2.00% 102.904KM 98.00% WFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD8 15.1352778335 77.6663907003 248 DD+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Rly.line Xing vannedoddi 42°28'43" RT 2.344KM 2.23% 102.656KM 97.77% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD9 15.1330889077 77.6659015646 370 DD+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable vannedoddi 35°50'14" LT 2.714KM 2.58% 102.286KM 97.42% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD10 15.1300262929 77.6672783464 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal vannedoddi 3.104KM 2.96% 101.896KM 97.04% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD11 15.1267981653 77.6687294925 387 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal vannedoddi 3.491KM 3.32% 101.509KM 96.68% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD12 15.123594853 77.6701694474 390 DC+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 23°00'45" RT 3.881KM 3.70% 101.119KM 96.30% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD13 15.1200725621 77.6702059949 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 4.276KM 4.07% 100.724KM 95.93% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD14 15.1165051383 77.6702430089 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable SH-5 Xing Kothapeta 4.671KM 4.45% 100.329KM 95.55% WBC CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD15 15.1129377316 77.6702800414 382 DB+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Kothapeta 05°09'52" LT 5.053KM 4.81% 99.947KM 95.19% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD16 15.1095123853 77.6706374168 349 DD+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 32 KV S/C line Xing Kothapeta 51°35'24" RT 5.402KM 5.14% 99.598KM 94.86% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD17 15.107314837 77.6683114007 398 DC+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 27°03'47" LT 5.8KM 5.52% 99.2KM 94.48% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD18 15.103910606 77.667122992 398 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 6.198KM 5.90% 98.802KM 94.10% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD19 15.1005063977 77.6659346392 398 DB+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 11°25'03" LT 6.596KM 6.28% 98.404KM 93.72% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD20 15.0970524206 77.6655291166 395 DB+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 07°59'01" RT 6.991KM 6.66% 98.009KM 93.34% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD21 15.0936024596 77.6645938685 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kothapeta 7.386KM 7.03% 97.614KM 92.97% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD22 15.0901525159 77.66365866 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 7.781KM 7.41% 97.219KM 92.59% WET Plate II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD23 15.0867025534 77.6627234905 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 8.171KM 7.78% 96.829KM 92.22% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD24 15.0832962859 77.661800209 400 DB+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 11°01'31" RT 8.571KM 8.16% 96.429KM 91.84% WBC CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD25 15.080043099 77.660183117 355 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 8.926KM 8.50% 96.074KM 91.50% WBC Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD26 15.0771558852 77.6587479855 390 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 9.316KM 8.87% 95.684KM 91.13% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD27 15.0739839929 77.657171425 228 DD+25 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 220 KV D/C line Xing Gooty Anantapur 47°37'04" RT 9.544KM 9.09% 95.456KM 90.91% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD28 15.0733955857 77.6551404341 392 DB+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 14°00'00" LT 9.936KM 9.46% 95.064KM 90.54% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD29 15.0715931179 77.6520042225 390 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Gooty Anantapur 47°26'23" LT 10.326KM 9.83% 94.674KM 90.17% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD30 15.0681470405 77.6512533545 400 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 10.726KM 10.22% 94.274KM 89.78% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD31 15.0646125886 77.6504832523 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 11.126KM 10.60% 93.874KM 89.40% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD32 15.0610781198 77.6497131943 400 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gooty Anantapur 11.526KM 10.98% 93.474KM 89.02% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD33 15.0575436433 77.6489431621 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 11.926KM 11.36% 93.074KM 88.64% PS CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD34 15.054009159 77.6481731741 400 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 12.326KM 11.74% 92.674KM 88.26% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD35 15.050474676 77.647403212 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 12.716KM 12.11% 92.284KM 87.89% WBC CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD36 15.0470285354 77.6466525386 392 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 13.108KM 12.48% 91.892KM 87.52% WBC CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD37 15.0435647012 77.6458980458 390 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 00°13'06" RT 13.498KM 12.86% 91.502KM 87.14% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD38 15.0401213773 77.6451339407 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 13.888KM 13.23% 91.112KM 86.77% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD39 15.0366780278 77.6443698691 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 14.283KM 13.60% 90.717KM 86.40% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD40 15.0331905155 77.6435960296 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 14.678KM 13.98% 90.322KM 86.02% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD41 15.0297030046 77.6428222248 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kasepalli 15.073KM 14.36% 89.927KM 85.64% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD42 15.0262154767 77.6420484635 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Peddavaduguru 15.463KM 14.73% 89.537KM 85.27% WFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD43 15.022772097 77.6412845183 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Peddavaduguru 15.858KM 15.10% 89.142KM 84.90% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD44 15.0192845629 77.6405108257 390 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Peddavaduguru 16.248KM 15.47% 88.752KM 84.53% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD45 15.015841159 77.639746948 396 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Peddavaduguru 16.644KM 15.85% 88.356KM 84.15% WBC Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD46 15.01234728 77.63897192 241 DD+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 132 KV S/C line Xing Peddavaduguru 58°59'06" RT 16.885KM 16.08% 88.115KM 83.92% WBC Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD47 15.0116441047 77.6368524156 395 DD+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Peddavaduguru 40°29'20" LT 17.28KM 16.46% 87.72KM 83.54% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD48 15.0084893 77.6350051 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 17.67KM 16.83% 87.33KM 83.17% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD49 15.0055451988 77.6331323084 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 18.05KM 17.19% 86.95KM 82.81% WFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD50 15.0025928254 77.6313315709 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 18.435KM 17.56% 86.565KM 82.44% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD51 14.9996015818 77.6295071982 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 18.805KM 17.91% 86.195KM 82.09% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD52 14.9967268561 77.6277539559 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 19.195KM 18.28% 85.805KM 81.72% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD53 14.9936967276 77.6259060042 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 19.57KM 18.64% 85.43KM 81.36% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD54 14.9907831092 77.6241291706 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 19.96KM 19.01% 85.04KM 80.99% WBC Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD55 14.9877529238 77.6222813302 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Gajarampalli 20.34KM 19.37% 84.66KM 80.63% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD56 14.9848004111 77.6204809181 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 20.735KM 19.75% 84.265KM 80.25% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD57 14.981731329 77.618609505 386 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 21.121KM 20.12% 83.879KM 79.88% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD58 14.9787321522 77.616780778 300 DC+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Thamballapalle 18°52'00" LT 21.421KM 20.40% 83.579KM 79.60% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD59 14.9760781418 77.6162109863 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 21.806KM 20.77% 83.194KM 79.23% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD60 14.9726741714 77.6154802018 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 22.191KM 21.13% 82.809KM 78.87% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD61 14.9692681665 77.614749025 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 22.586KM 21.51% 82.414KM 78.49% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD62 14.9657782642 77.6139998681 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 22.981KM 21.89% 82.019KM 78.11% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD63 14.9622858405 77.6132502032 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thamballapalle 23.371KM 22.26% 81.629KM 77.74% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD64 14.9588375174 77.6125100447 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Pamidi 23.751KM 22.62% 81.249KM 77.38% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD65 14.9554800525 77.6117894159 310 DC+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Pamidi 18°19'40" RT 24.061KM 22.92% 80.939KM 77.08% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD66 14.9530281595 77.6103986008 310 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Pamidi 24.371KM 23.21% 80.629KM 76.79% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD67 14.9505762702 77.6090078302 305 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Pamidi 24.676KM 23.50% 80.324KM 76.50% PS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD68 14.9481639185 77.6076395271 335 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Pamidi 40°34'14" LT 25.011KM 23.82% 79.989KM 76.18% PS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD69 14.9453877515 77.6082804877 600 DD+18 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Penna River Xing Pamidi 00°00'00" 25.611KM 24.39% 79.389KM 75.61% FS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD70 14.9398302 77.6093923 320 DD+18 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Illuru 00°00'00" 25.931KM 24.70% 79.069KM 75.30% FS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD71 14.9369984 77.6099678 310 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Illuru 30°54'15" RT 26.241KM 24.99% 78.759KM 75.01% PS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD72 14.9343793 77.6089497 370 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Illuru 26.611KM 25.34% 78.389KM 74.66% PS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD73 14.9313324 77.6078083 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Illuru 26.976KM 25.69% 78.024KM 74.31% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD74 14.9283443273 77.6065756946 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Illuru 27.346KM 26.04% 77.654KM 73.96% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD75 14.9252016 77.605413 395 DC+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Illuru 19°53'30" RT 27.741KM 26.42% 77.259KM 73.58% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD76 14.9224372 77.6031133 345 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Illuru 28.086KM 26.75% 76.914KM 73.25% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD77 14.9201166 77.6011097 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 28.481KM 27.12% 76.519KM 72.88% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD78 14.917369 77.5987794 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 28.846KM 27.47% 76.154KM 72.53% DFR Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD79 14.914891 77.596622 400 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 29.246KM 27.85% 75.754KM 72.15% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD80 14.9120561 77.5942299 375 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 29.621KM 28.21% 75.379KM 71.79% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD81 14.9093586576 77.5918888254 392 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 30.013KM 28.58% 74.987KM 71.42% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD82 14.9066215305 77.5895790457 390 DD+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 33°18'56" LT 30.403KM 28.96% 74.597KM 71.04% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD83 14.9031988 77.5892586 351 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 30.754KM 29.29% 74.246KM 70.71% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD84 14.8999657301 77.5888529949 218 DB+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 00°06'36" LT 30.972KM 29.50% 74.028KM 70.50% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD85 14.8980072102 77.588643281 383 DC+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru 22°25'49" RT 31.355KM 29.86% 73.645KM 70.14% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD86 14.8949634112 77.5869526648 220 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable NH-7 Xing Kalluru 37°42'49" RT 31.575KM 30.07% 73.425KM 69.93% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD87 14.8941580012 77.5850846437 362 DC+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Kalluru 17°34'53" LT 31.937KM 30.42% 73.063KM 69.58% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD88 14.8919916975 77.5825661793 240 DD+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Rly.line Xing Kalluru 42°24'38" RT 32.177KM 30.64% 72.823KM 69.36% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD89 14.8920264262 77.5803373017 365 DD+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Vulnerable Kalluru 56°52'57" LT 32.542KM 30.99% 72.458KM 69.01% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD90 14.8894125 77.5784835 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru Agraharam 32.907KM 31.34% 72.093KM 68.66% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD91 14.8868740771 77.5765797516 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru Agraharam 33.297KM 31.71% 71.703KM 68.29% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD92 14.8837737 77.5745003 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru Agraharam 33.677KM 32.07% 71.323KM 67.93% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD93 14.8808411 77.5724842 383 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru Agraharam 34.06KM 32.44% 70.94KM 67.56% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD94 14.8780779 77.5705717 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kalluru Agraharam 34.425KM 32.79% 70.575KM 67.21% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD95 14.8755731269 77.5685956831 380 DC+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Muntimadugu 23°28'44" LT 34.805KM 33.15% 70.195KM 66.85% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD96 14.8722038971 77.5679215675 370 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Muntimadugu 35.175KM 33.50% 69.825KM 66.50% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD97 14.8686356 77.5673457 340 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Guddalapalli 35.515KM 33.82% 69.485KM 66.18% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD98 14.8656339 77.5667426 355 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Guddalapalli 35.87KM 34.16% 69.13KM 65.84% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD99 14.8624889 77.566129 345 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Guddalapalli 36.215KM 34.49% 68.785KM 65.51% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD100 14.8594482 77.5654714 355 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Guddalapalli 36.57KM 34.83% 68.43KM 65.17% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD101 14.8562643 77.5648498 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 36.94KM 35.18% 68.06KM 64.82% WFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD102 14.8532740165 77.5641345871 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 37.33KM 35.55% 67.67KM 64.45% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD103 14.8498160734 77.5634429222 385 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 37.715KM 35.92% 67.285KM 64.08% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD104 14.8464024598 77.5627601599 295 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 12°39'51" RT 38.01KM 36.20% 66.99KM 63.80% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD105 14.8439620448 77.5616602157 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 38.395KM 36.57% 66.605KM 63.43% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD106 14.8407770852 77.5602247417 380 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 38.775KM 36.93% 66.225KM 63.07% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD107 14.8373716 77.5588562 385 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Budedu 39.16KM 37.30% 65.84KM 62.70% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD108 14.8342281 77.5573753 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sangivapuram 39.54KM 37.66% 65.46KM 62.34% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD109 14.8308874 77.5560015 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sangivapuram 39.935KM 38.03% 65.065KM 61.97% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD110 14.8277596 77.5545718 385 DB+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sangivapuram 08°00'25" LT 40.32KM 38.40% 64.68KM 61.60% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD111 14.8244137 77.5535852 360 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sangivapuram 40.68KM 38.74% 64.32KM 61.26% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD112 14.8212204 77.5526479 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sangivapuram 41.06KM 39.10% 63.94KM 60.90% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD113 14.8179984 77.5517355 390 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 41.45KM 39.48% 63.55KM 60.52% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD114 14.814583 77.5507284 375 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 41.825KM 39.83% 63.175KM 60.17% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD115 14.8115989224 77.5497455345 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 42.215KM 40.20% 62.785KM 59.80% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD116 14.8079241 77.5487652 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 42.595KM 40.57% 62.405KM 59.43% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD117 14.8049018384 77.5478155938 350 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 42.945KM 40.90% 62.055KM 59.10% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD118 14.801601 77.5470081 365 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 43.31KM 41.25% 61.69KM 58.75% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD119 14.7986830777 77.5460236342 335 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 43.645KM 41.57% 61.355KM 58.43% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD120 14.7957693822 77.5451840849 345 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 43.99KM 41.90% 61.01KM 58.10% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD121 14.7927687015 77.5443195114 320 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 44.31KM 42.20% 60.69KM 57.80% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD122 14.7899854626 77.5435176114 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 44.7KM 42.57% 60.3KM 57.43% DFR Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD123 14.7865933693 77.542540335 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Marthadu 45.07KM 42.92% 59.93KM 57.08% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD124 14.783375223 77.5416132154 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Marthadu 45.45KM 43.29% 59.55KM 56.71% WET Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD125 14.78007009 77.54066106 375 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 45.825KM 43.64% 59.175KM 56.36% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD126 14.7768109972 77.5397222206 390 DC+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 15°02'38" RT 46.215KM 44.01% 58.785KM 55.99% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD127 14.7735355 77.5379274 390 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 46.605KM 44.39% 58.395KM 55.61% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD128 14.770752849 77.5360252659 310 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 46.915KM 44.68% 58.085KM 55.32% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD129 14.768345094 77.5345560273 397 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Kontaka 47.312KM 45.06% 57.688KM 54.94% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD130 14.7652615908 77.532674495 194 DD+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 400 KV S/C line Xing Kontaka 33°00'00" RT 47.506KM 45.24% 57.494KM 54.76% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD131 14.7644851741 77.5310600142 385 DB+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 01°02'51" RT 47.891KM 45.61% 57.109KM 54.39% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD132 14.7628926 77.5275031 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 48.276KM 45.98% 56.724KM 54.02% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD133 14.7615386 77.5242547 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 48.671KM 46.35% 56.329KM 53.65% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD134 14.7599982 77.5209679 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 49.051KM 46.72% 55.949KM 53.28% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD135 14.7586426 77.5177347 365 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 49.416KM 47.06% 55.584KM 52.94% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD136 14.7572566 77.5146328 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 49.806KM 47.43% 55.194KM 52.57% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD137 14.7558027 77.511305 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kontaka 50.196KM 47.81% 54.804KM 52.19% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD138 14.7543566 77.5080282 350 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 50.546KM 48.14% 54.454KM 51.86% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD139 14.7530944 77.5051209 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 50.941KM 48.52% 54.059KM 51.48% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD140 14.7516624 77.5018218 375 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 51.316KM 48.87% 53.684KM 51.13% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD141 14.7501685 77.4984474 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 51.716KM 49.25% 53.284KM 50.75% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD142 14.7486777 77.4951469 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 52.106KM 49.62% 52.894KM 50.38% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD143 14.7472135 77.4918699 365 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 39°19'17" LT 52.471KM 49.97% 52.529KM 50.03% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD144 14.7441269 77.490367 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 52.871KM 50.35% 52.129KM 49.65% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD145 14.7411332 77.4887113 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Kammuru 53.266KM 50.73% 51.734KM 49.27% WER CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD146 14.7379769 77.4870337 390 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 53.656KM 51.10% 51.344KM 48.90% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD147 14.7347554 77.4854646 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 54.051KM 51.48% 50.949KM 48.52% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD148 14.731528 77.4837531 315 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kammuru 54.366KM 51.78% 50.634KM 48.22% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD149 14.7291635 77.482421 368 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal SH-32 Xing Brahmanapalle 00°00'00" 54.734KM 52.13% 50.266KM 47.87% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD150 14.7260763 77.4809356 240 DD+25 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 220 KV S/C line Xing Brahmanapalle 18°40'28" LT 54.974KM 52.36% 50.026KM 47.64% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD151 14.7240429 77.4806097 395 DB+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Brahmanapalle 03°36'31" RT 55.369KM 52.73% 49.631KM 47.27% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD152 14.7206013 77.4800501 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Brahmanapalle 55.744KM 53.09% 49.256KM 46.91% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD153 14.7170528 77.4793255 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Brahmanapalle 56.144KM 53.47% 48.856KM 46.53% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD154 14.713533 77.4786908 241 DB+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal 132 KV S/C line Xing Brahmanapalle 03°17'12" LT 56.385KM 53.70% 48.615KM 46.30% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD155 14.7114841 77.4783347 390 DD+18 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Brahmanapalle 18°12'04" LT 56.775KM 54.07% 48.225KM 45.93% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD156 14.7078606899 77.4789654607 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Brahmanapalle 57.15KM 54.43% 47.85KM 45.57% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD157 14.7045285108 77.4795922737 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 57.525KM 54.79% 47.475KM 45.21% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD158 14.7011963321 77.480219085 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 57.92KM 55.16% 47.08KM 44.84% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD159 14.69768643 77.4808793043 350 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 58.27KM 55.50% 46.73KM 44.50% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD160 14.6945763955 77.4814643037 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 58.65KM 55.86% 46.35KM 44.14% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD161 14.6911997893 77.4820994344 350 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 59KM 56.19% 46KM 43.81% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD162 14.6881413 77.4827 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 59.37KM 56.54% 45.63KM 43.46% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD163 14.6848019985 77.4833028099 375 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 59.745KM 56.90% 45.255KM 43.10% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD164 14.6814698221 77.4839295563 385 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thalupur 60.13KM 57.27% 44.87KM 42.73% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD165 14.6780487799 77.4845729948 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal SH-30 Xing Kumarupalle 60.525KM 57.64% 44.475KM 42.36% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD166 14.6745388898 77.4852331432 387 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 60.912KM 58.01% 44.088KM 41.99% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD167 14.6711000789 77.4858799027 370 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 14°15'33" RT 61.282KM 58.36% 43.718KM 41.64% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD168 14.6677647356 77.4856573156 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 61.652KM 58.72% 43.348KM 41.28% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD169 14.6644293903 77.4854347437 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 62.027KM 59.07% 42.973KM 40.93% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD170 14.6610489682 77.4852091728 340 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 62.367KM 59.40% 42.633KM 40.60% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD171 14.6579840572 77.4850046774 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 62.747KM 59.76% 42.253KM 40.24% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD172 14.6545585563 77.4847761315 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 63.127KM 60.12% 41.873KM 39.88% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD173 14.651133062 77.484547611 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 63.487KM 60.46% 41.513KM 39.54% WET CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD174 14.6478878464 77.4843311222 315 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 63.802KM 60.76% 41.198KM 39.24% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD175 14.6450482924 77.4841417098 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 64.197KM 61.14% 40.803KM 38.86% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD176 14.6414875676 77.483904204 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Kumarupalle 64.582KM 61.51% 40.418KM 38.49% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD177 14.63801699 77.4836727408 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 64.972KM 61.88% 40.028KM 38.12% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD178 14.6345013353 77.4834382721 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 65.352KM 62.24% 39.648KM 37.76% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD179 14.6310758188 77.4832098445 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 65.747KM 62.62% 39.253KM 37.38% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD180 14.6275150845 77.4829724061 340 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Sanapa 03°48'29" RT 66.087KM 62.94% 38.913KM 37.06% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD181 14.6242462715 77.4825290848 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 66.447KM 63.28% 38.553KM 36.72% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD182 14.6212569 77.4820969 355 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 66.802KM 63.62% 38.198KM 36.38% PS Pipe II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD183 14.6180187 77.4815712 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 67.167KM 63.97% 37.833KM 36.03% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD184 14.6148303 77.4811573 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 67.527KM 64.31% 37.473KM 35.69% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD185 14.611601 77.4807414 320 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 67.847KM 64.62% 37.153KM 35.38% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD186 14.608774 77.4803766 380 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 68.227KM 64.98% 36.773KM 35.02% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD187 14.6053416 77.4799413 350 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 68.577KM 65.31% 36.423KM 34.69% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD188 14.6021909 77.4795184 350 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 68.927KM 65.64% 36.073KM 34.36% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD189 14.5990888 77.4790893 300 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Sanapa 69.227KM 65.93% 35.773KM 34.07% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD190 14.5963754 77.4787158 330 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Rangampet 69.557KM 66.24% 35.443KM 33.76% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD191 14.5934317 77.4783271 320 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Rangampet 69.877KM 66.55% 35.123KM 33.45% DFR CP II B Ph Y Ph R Ph R Ph Y Ph B Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD192 14.5905225 77.4778667 331 DC (T)+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Rangampet 00°00'00" 70.208KM 66.86% 34.792KM 33.14% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD193 14.5875633334 77.4775555561 320 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Rangampet 06°56'50" RT 70.528KM 67.17% 34.472KM 32.83% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD194 14.5847642717 77.4768140192 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Rangampet 70.918KM 67.54% 34.082KM 32.46% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD195 14.5813529066 77.4759103032 355 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Rangampet 71.273KM 67.88% 33.727KM 32.12% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD196 14.5782476867 77.4750877216 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Vepacherla 71.643KM 68.23% 33.357KM 31.77% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD197 14.5750112465 77.4742304132 379 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Vepacherla 72.022KM 68.59% 32.978KM 31.41% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD198 14.5716960703 77.4733522879 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Vepacherla 72.422KM 68.97% 32.578KM 31.03% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD199 14.5681972047 77.4724255376 385 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Vepacherla 72.807KM 69.34% 32.193KM 30.66% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD200 14.5648295348 77.4715335775 373 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Vepacherla 73.18KM 69.70% 31.82KM 30.30% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD201 14.5615699718 77.4706702934 350 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Chennamanaynikota 06°20'02" LT 73.53KM 70.03% 31.47KM 29.97% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD202 14.5584399879 77.4702112007 320 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Chennamanaynikota 73.85KM 70.33% 31.15KM 29.67% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD203 14.555578287 77.4697914819 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Chennamanaynikota 74.225KM 70.69% 30.775KM 29.31% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD204 14.5522247309 77.469299639 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Chennamanaynikota 74.59KM 71.04% 30.41KM 28.96% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD205 14.5489605966 77.4688209359 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Chennamanaynikota 74.96KM 71.39% 30.04KM 28.61% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD206 14.545651736 77.4683357012 340 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 75.3KM 71.71% 29.7KM 28.29% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD207 14.5426111686 77.4678898265 365 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 75.665KM 72.06% 29.335KM 27.94% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD208 14.5393470224 77.4674111879 365 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 76.03KM 72.41% 28.97KM 27.59% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD209 14.5360828722 77.4669325711 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 76.39KM 72.75% 28.61KM 27.25% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD210 14.5328634313 77.4664605378 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 76.765KM 73.11% 28.235KM 26.89% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD211 14.5295098462 77.4659688513 345 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 77.11KM 73.44% 27.89KM 26.56% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD212 14.5264245377 77.4655165256 380 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 77.49KM 73.80% 27.51KM 26.20% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD213 14.523026231 77.4650183321 353 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 77.843KM 74.14% 27.157KM 25.86% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD214 14.519869384 77.4645555547 380 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 09°06'24" RT 78.223KM 74.50% 26.777KM 25.50% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD215 14.5165907069 77.4635115701 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Thumucherla 78.608KM 74.86% 26.392KM 25.14% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD216 14.5132688989 77.4624538946 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 78.983KM 75.22% 26.017KM 24.78% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD217 14.5100333574 77.4614237338 370 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 79.353KM 75.57% 25.647KM 24.43% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD218 14.5068409445 77.460407338 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 79.718KM 75.92% 25.282KM 24.08% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD219 14.5036916606 77.4594047151 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 80.118KM 76.30% 24.882KM 23.70% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD220 14.5002403854 77.4583059821 380 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 80.498KM 76.66% 24.502KM 23.34% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD221 14.4969616551 77.4572622344 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 80.888KM 77.04% 24.112KM 22.96% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD222 14.4935966359 77.4561910541 390 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 81.278KM 77.41% 23.722KM 22.59% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD223 14.4902316059 77.4551199138 370 DA+3+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Togarakunta 81.648KM 77.76% 23.352KM 22.24% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD224 14.48703913 77.45410374 355 DA+4+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 82.003KM 78.10% 22.997KM 21.90% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD225 14.4839760763 77.4531288065 350 DA+5+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 82.353KM 78.43% 22.647KM 21.57% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD226 14.480953144 77.4521666686 350 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 43°32'43" LT 82.703KM 78.76% 22.297KM 21.24% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD227 14.4781189236 77.4536052935 370 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 83.073KM 79.12% 21.927KM 20.88% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD228 14.4751227748 77.4551260812 370 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 83.443KM 79.47% 21.557KM 20.53% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD229 14.4721266218 77.4566468238 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 83.838KM 79.85% 21.162KM 20.15% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD230 14.4689280129 77.458270285 355 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 84.193KM 80.18% 20.807KM 19.82% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD231 14.4660533226 77.4597293098 340 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Togarakunta 84.533KM 80.51% 20.467KM 19.49% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD232 14.4633000908 77.46112665 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 84.893KM 80.85% 20.107KM 19.15% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD233 14.4603848933 77.4626061634 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 85.288KM 81.23% 19.712KM 18.77% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD234 14.4571863033 77.4642294567 400 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 85.688KM 81.61% 19.312KM 18.39% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD235 14.4539471907 77.4658732796 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 86.083KM 81.98% 18.917KM 18.02% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD236 14.4507485368 77.4674965181 395 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 86.478KM 82.36% 18.522KM 17.64% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD237 14.4475499326 77.4691196887 396 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 86.874KM 82.74% 18.126KM 17.26% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD238 14.4443394254 77.4707488613 390 DC+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Elakkuntla 27°16'29" RT 87.264KM 83.11% 17.736KM 16.89% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD239 14.4408167085 77.470688201 390 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 87.654KM 83.48% 17.346KM 16.52% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD240 14.4372940536 77.4706275527 375 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 88.029KM 83.84% 16.971KM 16.16% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD241 14.4339068867 77.470569245 390 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 88.419KM 84.21% 16.581KM 15.79% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD242 14.4303842293 77.4705086186 395 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 88.814KM 84.58% 16.186KM 15.42% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD243 14.4268164076 77.4704472272 375 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 89.189KM 84.94% 15.811KM 15.06% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD244 14.4234278189 77.4703889266 300 DD+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 47°37'44" RT 89.489KM 85.23% 15.511KM 14.77% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD245 14.4216409214 77.4682983077 390 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 89.879KM 85.60% 15.121KM 14.40% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD246 14.419317912 77.4655805584 295 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 90.174KM 85.88% 14.826KM 14.12% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD247 14.4175607413 77.4635248616 382 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 90.556KM 86.24% 14.444KM 13.76% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD248 14.4152853111 77.4608629501 355 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 90.911KM 86.58% 14.089KM 13.42% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD249 14.413170684 77.4583892245 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Elakkuntla 91.276KM 86.93% 13.724KM 13.07% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD250 14.4109964457 77.4558458731 370 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 91.646KM 87.28% 13.354KM 12.72% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD251 14.4087923958 77.4532677351 365 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 92.011KM 87.63% 12.989KM 12.37% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD252 14.4066180853 77.450724481 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 92.371KM 87.97% 12.629KM 12.03% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD253 14.4044735335 77.448216109 365 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 92.736KM 88.32% 12.264KM 11.68% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD254 14.4022991517 77.4456729508 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 93.131KM 88.70% 11.869KM 11.30% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD255 14.3999460237 77.4429208286 345 DA+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 93.476KM 89.02% 11.524KM 10.98% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD256 14.3978907246 77.4405171162 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 93.871KM 89.40% 11.129KM 10.60% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD257 14.3955375091 77.4377650906 395 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 94.266KM 89.78% 10.734KM 10.22% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD258 14.3931842517 77.4350131216 350 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 94.616KM 90.11% 10.384KM 9.89% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD259 14.3910990499 77.4325747121 395 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 95.011KM 90.49% 9.989KM 9.51% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD260 14.3887457225 77.4298228497 358 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 95.369KM 90.83% 9.631KM 9.17% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD261 14.3866127981 77.4273288171 395 DC+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 17°37'51" LT 95.764KM 91.20% 9.236KM 8.80% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD262 14.3835600194 77.4254332947 325 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 96.089KM 91.51% 8.911KM 8.49% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD263 14.3810482232 77.4238737314 330 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 96.419KM 91.83% 8.581KM 8.17% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD264 14.3784977632 77.4222902114 305 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Narsampalle 96.724KM 92.12% 8.276KM 7.88% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD265 14.3761405068 77.4208266817 360 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venjkatapuram 97.084KM 92.46% 7.916KM 7.54% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD266 14.3733581538 77.419099295 325 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 97.409KM 92.77% 7.591KM 7.23% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD267 14.3708462823 77.4175398759 280 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 97.689KM 93.04% 7.311KM 6.96% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD268 14.3686822031 77.4161964155 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 98.074KM 93.40% 6.926KM 6.60% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD269 14.365706571 77.4143492044 400 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 98.474KM 93.78% 6.526KM 6.22% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD270 14.3626149872 77.4124300737 355 DB+6 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 03°47'18" RT 98.829KM 94.12% 6.171KM 5.88% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD271 14.360006728 77.4105158708 400 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 99.229KM 94.50% 5.771KM 5.50% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD272 14.3570678299 77.4083590807 350 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 99.579KM 94.84% 5.421KM 5.16% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD273 14.354496262 77.4064719392 385 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 99.964KM 95.20% 5.036KM 4.80% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD274 14.3516675134 77.404396125 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 100.364KM 95.58% 4.636KM 4.42% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD275 14.348842782 77.4023233466 355 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Venkatapuram 00°52'41" RT 100.719KM 95.92% 4.281KM 4.08% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD276 14.3462377 77.4004197 355 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 101.074KM 96.26% 3.926KM 3.74% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD277 14.3436646434 77.3984406908 345 DA+9 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 101.419KM 96.59% 3.581KM 3.41% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD278 14.341148464 77.3965541179 370 DA+3 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Tr.Rd. Xing Eguvapalli 101.789KM 96.94% 3.211KM 3.06% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD279 14.338449943 77.394530888 350 DB+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 03°24'18" LT 102.139KM 97.28% 2.861KM 2.72% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD280 14.3357942811 77.3927706201 325 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 102.464KM 97.58% 2.536KM 2.42% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD281 14.3333282965 77.3911361243 350 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 102.814KM 97.92% 5.186KM 2.08% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD282 14.3306725957 77.3893759422 345 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 103.159KM 98.25% 1.841KM 1.75% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD283 14.3280548202 77.3876409471 400 DA+0 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 103.559KM 98.63% 1.441KM 1.37% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
400 KV D/C GOOTY-PAVAGADA LINE GTYPGD284 14.3249328 77.3854392 310 DD+18 Double CKT - TWIN MOOSE CKT-I in left TW PGD and CKT-II in Right TW PGD Normal Eguvapalli 103.869KM 98.92% 1.131KM 1.08% DFR CP II R Ph B Ph Y Ph B Ph R Ph Y Ph
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
01_Attachment-3 (QR).DOC
doc • 0.26 MB
02_Attachment-8- Manufacturers Authorization Form (MAF).doc
doc • 0.03 MB
03_Attachment-18-SAFETY PACT.docx
docx • 0.03 MB
04_Attachment-20_KMP Declaration.doc
doc • 0.03 MB
05_Attachment-21_Affidavit of Self certification.DOCX
docx • 0.03 MB
06_Attachment-23_Affidavit DMI&SP policy.docx
docx • 0.03 MB
07_Attachment 24_Compliance to the process related to the e-RA-.docx
docx • 0.03 MB
08_Attachment -25_Events.docx
docx • 0.03 MB
09_Attachment-26_DOE.docx
docx • 0.02 MB
10_Attachment-27_Bid Securing Declaration (BSD).docx
docx • 0.02 MB
11_Attachment-30_Undertaking Hard Copy Part.docx
docx • 0.02 MB
12_Attachment-31_CIPP.docx
docx • 0.02 MB
13_Attachment-32_SCoC.docx
docx • 0.02 MB
14_Legends for Units.pdf
pdf • 0.03 MB
First Envelope and Bid Forms.xlsx
xlsx • 2.34 MB
Price_schedule.xlsx
xlsx • 0.65 MB
12_Section XII FAQ.pdf
pdf • 0.37 MB
Section IVF pole Rev-4(Aug'2026).pdf
pdf • 1.13 MB
Technical Data Sheets (400KV) (Volume-III).doc
doc • 0.37 MB
Tower Schedule PVG Patrosoft.xlsx
xlsx • 0.06 MB
Tower spotting data of Gooty-Pavagadha TL.pdf
pdf • 1.14 MB
HARD ROCK EARTHING.pdf
pdf • 0.19 MB
Indicative sketches.pdf
pdf • 0.59 MB
Individual Leg SST.pdf
pdf • 0.58 MB
Insulator Packing drawing PVC type.pdf
pdf • 0.88 MB
Insulator Packing drawing.pdf
pdf • 0.09 MB
pile earthing Drawing.pdf
pdf • 0.30 MB
Revised Bird Guard Sheet 1 of 2.pdf
pdf • 0.10 MB
Revised Bird Guard Sheet 2 of 2 .pdf
pdf • 0.11 MB
Rod Type Earthing.pdf
pdf • 0.15 MB
Standard Drum Drawing Conductor & Earth Wire (Rev_Dec'2023).pdf
pdf • 0.61 MB
Standard drum Drawing Earth Wire.pdf
pdf • 0.19 MB
Standard Steel Drum Drawing Conductor Rev2 (Dec'2023).pdf
pdf • 0.16 MB
Steel Drum Drawing (HTLS Conductor) R1.pdf
pdf • 0.18 MB
Tower & Access R1.pdf
pdf • 2.86 MB
Typical sketch for Ladder and Platform.pdf
pdf • 1.08 MB
Wooden Drum Drawing (HTLS Conductor).pdf
pdf • 0.22 MB
132kV-765kV DC std hw (Part-6).pdf
pdf • 3.53 MB
220 KV SISP WITH BALANCING WT Model (1).pdf
pdf • 0.08 MB
220KV DT.pdf
pdf • 0.11 MB
220kV fittings with deer conductor.pdf
pdf • 0.38 MB
500HVDC- 765SC string drg.pdf
pdf • 0.86 MB
800kV HVDC string drg.pdf
pdf • 1.63 MB
Alternate TRANSPOSITION ARRANGEMENT Sketch .pdf
pdf • 1.21 MB
BFD DRAWING.pdf
pdf • 0.52 MB
bird gurad for V String.pdf
pdf • 0.35 MB
boulder and sand dwg.pdf
pdf • 0.12 MB
Chemical Counterpoise.pdf
pdf • 0.10 MB
Chemical Pipe Type.pdf
pdf • 0.10 MB
Covered grading Ring Drawing.pdf
pdf • 0.62 MB
Extension application scheme.pdf
pdf • 0.06 MB
GA_A_PROP TYPE SST Model (1).pdf
pdf • 0.17 MB
132kV-765kV DC std hw (Part-5).pdf
pdf • 8.03 MB
132kV-765kV DC std hw (Part-4).pdf
pdf • 8.39 MB
132kV-765kV DC std hw (Part-3).pdf
pdf • 7.94 MB
132kV-765kV DC std hw (Part-2).pdf
pdf • 10.31 MB
132kV and 220kV Typical Tower.pdf
pdf • 0.04 MB
132kV-765kV DC std hw (Part-1).pdf
pdf • 9.30 MB
Appendix-A-General.pdf
pdf • 0.17 MB
Appendix-B-DRS.pdf
pdf • 0.62 MB
Appendix-D -Guidelines for Off Line installation.pdf
pdf • 0.49 MB
Appendix-E-Splicing _guidlines.pdf
pdf • 1.50 MB
Appendix-G-2_FAT Procedure for OPGW Fittings, JB & FODP.pdf
pdf • 1.33 MB
Appendix-G-3_FAT Procedure for Vibration Damper.pdf
pdf • 0.74 MB
Appendix-G_1_ FAT Procedure for OPGW.pdf
pdf • 0.34 MB
Appendix-G_4_ FAT procedure of Approach Cable.pdf
pdf • 0.40 MB
Appendix-J.pdf
pdf • 0.73 MB
Appendix-K.pdf
pdf • 0.62 MB
Appendix_F_3_ OPGW HARDWARE FITTINGS TYPE TEST PROCEDURE.pdf
pdf • 0.49 MB
Appendix_F_4_ GENERAL TYPE TEST PROCEDURE-VIBRATION DAMPER.pdf
pdf • 0.29 MB
Section-01 General.pdf
pdf • 0.31 MB
Section-02-OPGW.pdf
pdf • 0.43 MB
Section-03-Testing.pdf
pdf • 0.80 MB
Section-04 Support Services & Document.pdf
pdf • 0.18 MB
Section-05 ADSS.pdf
pdf • 0.26 MB
Section-06_UGFO Specifications.pdf
pdf • 0.65 MB
Appendix I _ Guidelines for Approach cable installation.pdf
pdf • 0.82 MB
Appendix C_Live Line Installation.pdf
pdf • 1.60 MB
Appendix F_1_TT Procedure for optical fibre.pdf
pdf • 4.21 MB
Appendix_F_2_ Type Test procedure OPGW Cable.pdf
pdf • 1.14 MB
Appendix_F_5 Type Test Procedure for Joint Box.pdf
pdf • 0.20 MB
Appendix_H_1 SAT Procedure.pdf
pdf • 2.84 MB
GTR Forms for OPGW manufacturer in TL packages.docx
docx • 0.04 MB
GTR of OPGW for TBCB.pdf
pdf • 0.13 MB
06_2 Section VI B Clamp fittings and Accessories for HTLS Conductor,Rev-3(March'2026).pdf
pdf • 0.65 MB
07_1 Section VII A Conductor,Rev-4(March'2026).pdf
pdf • 0.74 MB
07_2 Section VII A (SMQP of Conductor).pdf
pdf • 4.76 MB
07_3 Section-VIIB - HTLS Conductor Rev-8(March'2026).pdf
pdf • 0.64 MB
08_1 Section VIII Composite Longrod Insulator, Rev-6(June'26).pdf
pdf • 1.20 MB
09_1 Section-IXA Pile FoundatonRev-6 (Oct'2024).pdf
pdf • 0.72 MB
09_2 Section-IX B Stone Column, Rev-0 (Dec'2023).pdf
pdf • 0.57 MB
04_5 Section IVC Appendix II(Part-A) Precommissioning procedure, Rev-1 (Sept'2021).pdf
pdf • 1.89 MB
04_5 Section IVC Appendix II(Part-B) Precommissioning Formats, Rev-1 (Sept'2021).pdf
pdf • 2.38 MB
04_6 Section IVC Appendix III (Standard MQP for Transmission Line Tower Rev 06).pdf
pdf • 0.26 MB
04_7 Section IVD Foundation (Contractor design), Rev-10(August'2026).pdf
pdf • 0.59 MB
04_8 Section IVE Foundation (Employer design),Rev-8(Sept'2025).pdf
pdf • 0.30 MB
05_1 Section V Earthwire,Rev-2(March'2026).pdf
pdf • 0.38 MB
05_2 Section V (MQP for Earthwire).pdf
pdf • 0.90 MB
06_1 Section VI A Hardware Fittings Clamp and Accessories for Conductor & Earthwire Rev-5(Sept'26).pdf
pdf • 3.87 MB
01_1 Section IA (standard)ScopeRev-25 (Sept'2026).pdf
pdf • 0.53 MB
01_2 Section IB General InformationRev-16(Oct'2026).pdf
pdf • 1.09 MB
02_1 Section II General Tehnical Conditions,Rev-4(Jan'2026).pdf
pdf • 0.30 MB
02_2 Section II Annexure-A (Quality Assurance Programme).pdf
pdf • 1.28 MB
03_1 Section III Survey & Soil Investigation,Rev-9(April'2026).pdf
pdf • 0.83 MB
03_2 Section III Annexure-A(Format for site BOQ).pdf
pdf • 1.70 MB
03_3 Section III Annexure B-C-D-E1&E2(Formats for other site data).pdf
pdf • 1.82 MB
04_1 Section IVA Tower Design,Rev-7(Jan'2025).pdf
pdf • 0.36 MB
04_2 Section IVB Tower Testing,Rev-3(Dec'2023).pdf
pdf • 0.17 MB
04_3 Section IVC Appendix-IV (List of Special Tools & Tackles).pdf
pdf • 0.12 MB
04_3 Section IVC Fabrication, Erection & Stringing,Rev-11(Feb'2026).pdf
pdf • 0.67 MB
04_4 Section IVC Appendix I (List of T&P).pdf
pdf • 0.83 MB
00_Cover Pages Volume-I.doc
doc • 0.81 MB
00_Main Index_Volume-I.pdf
pdf • 0.11 MB
01_Section-I Invitation for Bids (IFB).docx
docx • 0.05 MB
02 Section - II ITB SSTE S&I DCB-PRANIT.pdf
pdf • 0.75 MB
03A_Annexure-A (BDS).docx
docx • 0.04 MB
03B_Annexure-B (BDS).docx
docx • 0.02 MB
03C_Annexure-C (BDS) - MJunction.docx
docx • 0.03 MB
03D_Annexure-C (BDS) - PRANIT.docx
docx • 0.03 MB
03_Section-III Bid Data Sheets (BDS).docx
docx • 0.09 MB
04_Section-IV General Conditions of Contract (GCC) -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
05A_Appendix -I to SCC.pdf
pdf • 0.30 MB
05B_Appendix-II_SCC.docx
docx • 0.03 MB
05C_Annexure-III_SCC.pdf
pdf • 0.62 MB
05_Section-V Special Conditions of Contract (SCC)_Ratle.docx
docx • 0.09 MB
06_Section-VI Sample Forms and Procedures (SFP).doc
doc • 0.72 MB
~$RD1679.tmp
tmp • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .