Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹3.4 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹4.0 L
EMD Value
₹20,007
Closing Date
3 Feb 2026, 3:00 pmClosed
CHIEF ENGINEER
NNM
Construction of park in front of house no. 1383 Manish Goyals house in Ward-63 Shastri Nagar L Block and work of interlocking tiles around the park.
2026_NNMEE_1108565_60
8783/SNV-85T/2026
Open Tender
Civil Works
Fixed-rate
60 days
MEERUT.
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
NAGAR AYUKT NAGAR NIGAM
₹20,007
23 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet).
Dismentling of CC interlocking tiles in all com
Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work.
M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work.
Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
S/Laying of 22.4-53 mm size stone ballast.
Consalidation of stone ballast excluding of roller charges and excluding all SIN.755(B)
Supply of 80 mm thick ISI marked I shaped mechanicaly compressed interlocking cement concrete paver blocks manufatactered by high prussureand control vibration machine having plan dimension 200 x (160+120 mm )with minimum 5 mm thick topping of O.P. cement mixed with 25 %marble powder . The compresive strenth of concrete paver block shall not be less than 40 Mpa and 4.50 kg per no. including cost of all material labour T& P etc required for proper complition of work new item no-14 Work should be done with colour tiles.
12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc.
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire.
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.
Finishing wall with water proof paint of approved make and quality with three coat as per SI No 660,661
Painting or varnishing two cort with one prining coat SIN 644+645
Deduction cost of old C.C. Tiles& all complete of work
Deduction cost of old bricks
Deduction cost of old bricks bats
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
NNMT1.pdf
Tender Documents • 5.21 MB
BOQ_2048195.xls
BOQ • 0.28 MB
60.pdf
Additional Documents • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .