| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | K.A.SENGUTUVAN L1 |
|---|---|---|---|---|
| 1.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - IV No. 111,112,401,900 | 1,640 | One Cubic Meter | 1,703 ₹27,92,920 Lowest |
| 2.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including using 45mm to 22.4mm 0.396 cum, 22.40mm to 2.36mm of 0.528cum, 2.3mm of 0.396cum premixing the materialwith water at OMC in mechanical mix plant carriage for mixed material by tipper to site laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORTH specifications. as per standard specifications etc., completed | 1,640 | One Cubic Meter | 1,988.3 ₹32,60,812 Lowest |
| 3.00 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications | 10,932 | One Square Meter | 74.6 ₹8,15,527.2 Lowest |
| 4.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 10,932 | One Square Meter | 16.7 ₹1,82,564.4 Lowest |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 547 | One Cubic Meter | 9,558 ₹52,28,226 Lowest |
| 6.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ 60/70 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP ith bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory /Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 328 | One Cubic Meter | 10,128 ₹33,21,984 Lowest |
| 7.00 | Collection and supply of U.S. Red Gravel from approved Quarry including cost and con-veyance of U.S. Red Gravel and all other labour charges and stocking them to departmen-tal gauge for premeasurements including labour charges for laying U.S. Red Gravel, hand packing to camber and all other labour charges etc. complete as per standard specification. | 259 | One Cubic Meter | 310 ₹80,290 Lowest |
| 8.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250gms per sqm area, thickness 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | 576 | One Square Meter | 891 ₹5,13,216 Lowest |
| 9.00 | Providing and fixing of Retro Refectories Cautionary, Mandatory Signs made out of wide Angle Cube Corner Micro Prismatic grade conforming to IRC - 67:2010 & Type XI standard of ASTM D 4956 - 09 specification with 7 years warranty for Reflective Sheeting as per Clause 6.9 of IRC 67: 2010 and fixed over 2mm thick aluminium sheet fixed on back supporting on Vertical Post of 65 NB GI pipe, Medium Thick firmly fixed to the ground by means of property designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm as per standard drawing 90cm equilateral triangle. | 10 | One Square Meter | 14,041 ₹1,40,410 Lowest |
| 10.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, sand, silt or other loose soil and to full depth as may be directed except in hardrock reqiring blasting inclusive of shoring shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officrs with initial lead and lifts and cleaning, levelling, the site etc., complete as per SS 20B for foundation | 75.26 | One Cubic Meter | 168 ₹12,643.68 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
12 Jul 2023, 3:00 pmClosed
Executive Officer, Achirapakkam Town Panchayat
100, loop road, achirapakkam
Conversion of Earthen Road to BT Road with Culvert at Ravathanallur Burial Ground Salai,Jinna Nagar 2nd Street,Om Sakthi Nagar 1st street,MGR Nagar Sandai Salai,Kasthuri Nagar Salai,Iyyappan Kovil Salai,Gandhi Nagar Extension 1st and 4th Street Exten
2023_DTP_337100_1
71/2023
Open Tender
Civil Works
Works
90 days
Achirapakkam Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.0 L
Yes
Achirapakkam Town Panchayat
3 Nov 2023
6 Jul 2023
12 Jul 2023
6 Jul 2023
12 Jul 2023
6 Jul 2023
6 Jul 2023
Amount
Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - IV No. 111,112,401,900
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including using 45mm to 22.4mm 0.396 cum, 22.40mm to 2.36mm of 0.528cum, 2.3mm of 0.396cum premixing the materialwith water at OMC in mechanical mix plant carriage for mixed material by tipper to site laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORTH specifications. as per standard specifications etc., completed
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ 60/70 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP ith bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory /Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of U.S. Red Gravel from approved Quarry including cost and con-veyance of U.S. Red Gravel and all other labour charges and stocking them to departmen-tal gauge for premeasurements including labour charges for laying U.S. Red Gravel, hand packing to camber and all other labour charges etc. complete as per standard specification.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250gms per sqm area, thickness 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.
Providing and fixing of Retro Refectories Cautionary, Mandatory Signs made out of wide Angle Cube Corner Micro Prismatic grade conforming to IRC - 67:2010 & Type XI standard of ASTM D 4956 - 09 specification with 7 years warranty for Reflective Sheeting as per Clause 6.9 of IRC 67: 2010 and fixed over 2mm thick aluminium sheet fixed on back supporting on Vertical Post of 65 NB GI pipe, Medium Thick firmly fixed to the ground by means of property designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm as per standard drawing 90cm equilateral triangle.
Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, sand, silt or other loose soil and to full depth as may be directed except in hardrock reqiring blasting inclusive of shoring shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officrs with initial lead and lifts and cleaning, levelling, the site etc., complete as per SS 20B for foundation
Cement Concrete 1:4:8 (One cement, four fine aggregate and eight course aggregate) mix using 40mm HBG ISS metal from approved quarry including cost and conveyance of all materials to site and labour charges, including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specifications as directed by the departmental officers
Centering for soffits of RCC slabs of plane surface like lintels, beams, etc., including strutting 3m high using mild steel sheets of size 90cm x 60cm x and BG 10 stiffened with MS angles of size 25mm x 25mm x 3mm laid over silver oak joists of size 10cm x 6.5 cm spaced at about 90 cm c/c and supported by consurina props of 10 cm to 13cm dia spaced of 75cm c/c complying with standard specifications and as directed by the departmentsl officers etc., complete
Vibrated Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Plastering in Cement Mortor 1:5 Mix (one cement, five M- Sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supply and fabrication of steel and placing in position MS/Ribbed tor steel grills for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specificationsas directed by the departmentsl officers
Vibrated Reinforced Cement Concrete 1:1.5:3 (One cement one and half fine aggregate and three course aggregate) mix using 20mm HBG ISS metal for all RCC items of works excluding centering and shuttering and cost of reinforcement grill but including curing the same and also fixing fan clamps and fixtures in RCC works whereever necessary as directed by the departmental officer etc., complete
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .