Loading…
Loading…
Tender Value
₹38.2 L
EMD Value
₹76,440
Closing Date
13 Jul 2026, 2:00 pm5d left
ExEn, WDSC, Sirohi
ExEn, WDSC, Sirohi
Construction of MPT(17), SP(2) in Block Sirohi in MJSA 2.3 Project
2026_WDSC_571976_3
02/108/2026-27
Open Tender
Civil Works
168 days
Sirohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
As per BID Document
₹76,440
1 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 5 ls 7-5 lseh- xgjkbZ dk Mkxcsfyax dk;Z (GKN 2026-27, 6 b) | 7,234.4 | M | 1.71 | ₹12,370.82 |
| 2 | जंगल की सफाई, साधारण वनस्पति तथा झाडि़यों को काटने सहित। (GKN 2026-27 item 191) | 52,946.9 | SQM | 2.86 | ₹1,51,428.13 |
| 3 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. GKN 2026-27 Item No. 196 मशीनरी कार्य नरम मिट्टी (in Soft Soil)#196(अ) | 6,554.12 | CUM | 83.7 | ₹5,48,579.84 |
| 4 | मशीनरी कार्य सख्त मिट्टी (in Hard Soil) #196(ब) | 16,633.94 | CUM | 97.59 | ₹16,23,306.5 |
| 5 | Compaction of earth work by manual ramming or by plain roller (Proctor density 90%) BSR WRD Item No. 18 a Chapter V 2022 | 14,558.13 | CUM | 21.6 | ₹3,14,455.61 |
| 6 | Lip cutting and final dressing as per designed section including re-handling and disposal of excavated earth in layers 20 cm on embankments etc. with cost of dewatering wherever required, and complete in all respect (BSR WRD 2022, Item 19 Chapter V) | 16,821.12 | SQM | 25.2 | ₹4,23,892.22 |
| 7 | Watering of earth including cost of carriage of water when source of water is upto 5 km BSR WRD 2022 Item 28b Chapter V | 14,558.13 | CUM | 27.27 | ₹3,97,000.21 |
| 8 | मोरम(बाइंडिंग सामग्री) (1/12 वोइड्स काटें) (GKN 2026-27 Material item no. 137) | 584.38 | CUM | 290 | ₹1,69,470.2 |
| 9 | मूरम,भवन का मलवा,चूना,बजरी,पत्थर की गिट्टी 40mm नोमिनल साइज से कम तक का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना,उतारना व स्टेकिंग सहित । (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से upto 05 Km) GKN 2026-27 Item No. 186 | 584.38 | CUM | 173.7 | ₹1,01,506.81 |
| 10 | ग्रेवल,मूरम, क्वेरी रबिश, कंकर, गिट्टी आदि चाहे गए ग्रेड व केम्बर में अधिकाधिक 15 सेमी मोटी परत में बिछाई का कार्य मय ड्रेसिंग सहित GKN 2026-27 item no. 145) | 584.38 | CUM | 69.08 | ₹40,368.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BIDIIISirohi02merged.pdf
Tender Documents • 1.45 MB
BOQ_1017772.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid