Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | ₹9.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.8 L+₹1.3 L (13.9%)Rejected-Finance A 3 257 2ND FLOOR JANAKPURI ASALATPUR ROAD JANAKPURI WEST DELHI DELHI 110058 UDYAM DL 11 0007281 | WEST DELHI | DELHI | 110058 | ₹10.8 L+₹1.3 L (13.9%) | L2 | Rejected-Finance OTHER THAN L1 |
| 3 | L3₹12.5 L+₹3.0 L (31.8%)Rejected-Finance H M APARTMENT 4C S J ROAD ATHGAON GUWAHATI 781001 | GUWAHATI | KAMRUP METRO | ASSAM | 781001 | ₹12.5 L+₹3.0 L (31.8%) | L3 | Rejected-Finance OTHER THAN L1 |
| 4 | L5₹12.6 L+₹3.1 L (33.2%)Rejected-Finance 0 PRAGATIPUR DHARMA SARMA PATH BIRUBARI KAMRUP ASSAM 781016 | KAMRUP METRO | ASSAM | 781016 | ₹12.6 L+₹3.1 L (33.2%) | L5 | Rejected-Finance OTHER THAN L1 |
Tender Value
₹15.0 Cr
EMD Value
₹29,992
Closing Date
22 Feb 2020, 6:00 pmClosed
CWE SHILLONG
HQ CWE SHILLONG MEGHALAYA - 793011
SPECIAL REPAIR REPLACEMENT OF HOUSE HOLD STEEL FURNITURE AGAINST CONDEMNED FURNITURE UNDER GE GUWAHATI
2020_MES_318102_1
8366/GUW/E8
Open Tender
Civil Works - Others
Item Rate
180 days
GUWAHATI
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
GE GUWAHATI
₹29,992
Yes
27 Feb 2020
24 Jan 2020
24 Feb 2020
24 Jan 2020
22 Feb 2020
4 Feb 2020
Amount
SUPPLY ONLY ALMIRAH STEEL LARGE (HALF HANGING HALF SHELF) COMPLETE ALL AS PER DRAWAING NO FD/E6/MAP/18 SHEET 1/1 AND AS SPECIFIED
SUPPLY ONLY ALMIRAH STEEL SMALL COMPLETE ALL AS PER DRAWAING NO FD-1032 SHEET 1/1 AND AS SPECIFIED
SUPPLY ONLY BED HARD COMPLETE ALL AS PER DRG NO. FD/E6/MAP/08(R) SHEET 1/1 AND AS SPECIFIED.
SUPPLY ONLY CHAIR COMPUTER COMPLETE ALL AS PER DRAWING NO:FD/E6/MAP/01 SHEET NO-1/1 AND AS SPECIFIED. MAKE:- GODREJ & BOYCE MANUFACTURING CO LTD, M/S DURIAN INDUSTRIES LTD, M/S METHODEX SYSTEMS LTD, M/S ZUARI FURNITURE, FEATHERLITE OFFICE SYSTEMS PVT LTD, M/S VINAR SYSTEMS PVT LTD.
SUPPLY ONLY CHAIR VERANDAH COMPLETE ALL AS PER DRAWING NO:FD-359 SHEET NO-1/1 AND AS SPECIFIED
SUPPLY ONLY CHAIR WRITING COMPLETE ALL AS PER DRAWING NO: FD/E6/MAP/12 SHEET NO-1/1 AND AS SPECIFIED. MAKE:- GODREJ & BOYCE MANUFACTURING CO LTD, M/S DURIAN INDUSTRIES LTD, M/S METHODEX SYSTEMS LTD, M/S ZUARI FURNITURE, FEATHERLITE OFFICE SYSTEMS PVT LTD, M/S VINAR SYSTEMS PVT LTD.
SUPPLY ONLY CHARPOY WITH HARD TOP COMPLETE ALL AS PER DRAWING NO: FD/MAP/II/01 SHEET NO-1/1 AND AS SPECIFIED
SUPPLY ONLY LADDER ALUMINIUM COMPLETE ALL AS PER DRAWING NO-FD-1025 SHEET NO-1/1 AND AS SPECIFIED.
SUPPLY ONLY TABLE BED SIDE COMPLETE ALL AS PER DRAWING NO-FD/E6/MAP/15(R) SHEET NO-1/1 AND AS SPECIFIED.
SUPPLY ONLY TEAPOY VERANDAH MAP COMPLETE ALL AS PER DRAWING FD/E6/MAP/17 SHEET NO-1/1 AND AS SPECIFIED
Capital Construction Company
M/S SUBHAS CONSTRUCTION CO
D.B ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .