Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.8 L
Closing Date
18 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Hydraulic Division Kishtwar
Executive Engineer Hydraulic Division Kishtwar
Please refer BOQ
2021_PHE_152691_8
e-NIT 112 of 2021-22
Open Tender
Civil Works
Item Rate
30 days
Kishtwar
Please refer NIT
4 documents required · 4 mandatory
₹600
Yes
Executive Engineer Hydraulic Division Kishtwar
Exempted
22 Dec 2021
11 Dec 2021
18 Dec 2021
11 Dec 2021
18 Dec 2021
11 Dec 2021
90 days
Amount
Earth work in excavation by manual means over areas (exceeding 30cm and upto 1.5m in depth, 1.5 m in width as well as 10 sq meter on plan including disposal of earth to be leveled and neatly dressed 25m (All kinds of soils )
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level.1:4:8( 1 cement : 4 coarse sand : 8 graded stone aggregate; 20mm normal size) Nallah stone
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level.1:1.5:3(1cement:1.5 coarse sand : 3 graded stone aggregate; 20mm normal size)
Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts andstruts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness) including attached plasters, buttresses, plinth and string courses, fillets, columns, pillars, piers abutment, posts and struts etc. Up to five level excluding cost of centering shuttering, finishing and reinforcement.1:1.5:3 (1cement:1.5 coarse sand : 3 graded stone aggregate; 20mm normal size)
Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 5.5.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.( 20% extra for circular work)
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.( 20% extra for circular work)
Lintel, beams, plinth beams, girders, bressumers and cantilevers.( 20% extra for circular work)
Arches, domes, vaults upto 6 m span
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete. Mild steel and medium Tensile steel
Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50mm thick 12.5mm nominal size stone aggregate
12 mm cement plaster finished with a floating coat of neat cement mix (1:3) 1 cement : 3 fine sand.
Steel work welded in built up section / framed work including cutting hoisting fixing in position complete and applying a priming coat of approved steel primer. =01 No.
Dry random rubble masonry with hard stone in foundation and plinth:
Carriage of stone from source to site of work for an av. Distance of 01 km. by head load.
Carriage of material from nearest source to road side of work for an av. Distance of 25 km. by M.T Cement=
Steel=
Carriage of material from nearest source to road side of work for an av. Distance of 17 km. by M.T Sand=
Agg 20mm=
Carriage of material from nearest source to road side of work for an av. Distance of 100 mtrs by H.LCement=
Steel=
Carriage of material from nearest source to road side of work for an av. Distance of 100 mtrs. by H.L Sand=
Agg 20mm=
Carriage of material from road side to site of work for an av. Distance of 01 km. by head load.Agg 40mm=
Zubaida Begum
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .