Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-Finance MANDI HIMACHAL PRADESH | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹7.3 L | 1 | Accepted-Finance ok |
| 2 | 2₹7.9 L+₹64,057.40 (8.81%)Accepted-Finance VILLAGE RASWALA P O DEOTHI TEHSIL DISTT SOLAN | SOLAN | SOLAN | HIMACHAL PRADESH | ₹7.9 L+₹64,057.40 (8.81%) | 2 | Accepted-Finance ok |
| 3 | 3₹8.4 L+₹1.1 L (15.6%)Accepted-Finance | ₹8.4 L+₹1.1 L (15.6%) | 3 | Accepted-Finance ok |
| 4 | 4₹9.8 L+₹2.5 L (34.3%)Accepted-Finance | ₹9.8 L+₹2.5 L (34.3%) | 4 | Accepted-Finance ok |
| 5 | 5₹10.0 L+₹2.7 L (37.4%)Accepted-Finance VILLAGE BAGGA PO SIANJ TEHSIL CHACHYOT DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹10.0 L+₹2.7 L (37.4%) | 5 | Accepted-Finance ok |
Tender Value
₹10.0 L
EMD Value
₹24,915
Closing Date
13 Apr 2022, 5:00 pmClosed
Commissioner MC Solan
Commissioner MC Solan
Special repair and maintenance of Nadoh road in ward no.8 from house of Sh. Madan Sharma to House of Smt. Sunita SH Laying stone aggregate, CC 1.2.4, 1.3.6, Berm filling, cross drainage etc.
2022_UDDHP_59187_1
8858-61 dt. 23.03.2022
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Commissioner
₹24,915
11 Dec 2024
6 Apr 2022
16 Apr 2022
6 Apr 2022
13 Apr 2022
6 Apr 2022
Amount
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.All kinds of soil
Disposal of all excavated earth manually upto a lead of 150 Mtrs complete as per specifications.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres.
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled y roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density 63 mm to 45 mm size stone aggregate
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 300 mm dia. R.C.C. pipe
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Virender Thakur
geeta Ram jaswal
Karanjeet Singh
SOM DUTT
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .