Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹33.1 LAccepted-AOC | L-1 | Accepted-AOC aoc done | |
| 2 | L-2₹34.7 L+₹1.6 L (4.81%)Rejected-Finance R O VILLAGE P O CHARATGARH TEHSIL DISTT UNA H P | UNA | HIMACHAL PRADESH | 174301 | L-2 | Rejected-Finance Not L-1 | |
| 3 | L-3₹35.0 L+₹2.0 L (6.01%)Rejected-Finance KAPILA NIWAS MASIT WALI GALI UNA TEHSIL DISTT UNA H P | L-3 | Rejected-Finance Not L-1 | |
| 4 | L-4₹39.2 L+₹6.1 L (18.4%)Rejected-Finance | L-4 | Rejected-Finance Not L-1 | |
| 5 | L-5₹46.3 L+₹13.2 L (40.1%)Rejected-Finance R O VILLAGE PO NARI TEHSIL DISTT UNA HP | L-5 | Rejected-Finance Not L-1 |
Tender Value
₹44.1 L
EMD Value
₹73,800
Closing Date
29 May 2023, 9:00 amClosed
Executive Engineer, Una Division, HPPWD, Una
Executive Engineer, Una Division, HPPWD, Una
Job 2 Construction of Link road Harijan Basti Raipur Bare in Village Raipur Nichla km.0-0 to 0-800 Sub Head C.O Embankment, Retaining walls, P/L GSB, C.C Pavement and 30mm thick BC etc. in km 0-0 to 0-800 Under SCCP
2023_PWD_73627_1
Job 2 Construction of Link road Harijan Basti Rai
Open Tender
Civil Works - Roads
Percentage
60 days
Una
Please refer to Bidding Documents
14 documents required · 14 mandatory
₹2,000
₹73,800
24 Jul 2024
23 May 2023
29 May 2023
23 May 2023
29 May 2023
23 May 2023
eProcurement System Government of Himachal Pradesh Created By: Baldev Singh Created Date/Time: 05-Jun-2023 12:49 PM Tender Title: Job 2 Construction of Link road Harijan Basti Raipur Bare in Village Raipur Nichla km.0-0 to 0-800 Sub Head C.O Embankment, Retaining walls, P/L GSB, C.C Pavement and 30mm thick BC etc. in km 0-0 to 0-800 Under SCCP Tender ID: 2023_PWD_73627_1
Tender Inviting Authority: Executive Engineer, Una Division, HPPWD, Una
Name of Work: Construction of Link road Harijan Basti Raipur Bare in Village Raipur Nichla km.0/0 to 0/800 (SH: C/O Embankment, Retaining walls, P/L GSB, C.C Pavement & 30mm thick BC etc. in km 0/0 to 0/800) Under SCCP
Contract No: 1123-32 dated 09.05.2023
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Balbir Singh Govt Contractor(GSTN-02CFAPS2034H1ZX) 4414027.00 -21.50 3465011.20 Thirty Four Lakh Sixty Five Thousand Eleven
2.00 Vikas puri(GSTN-02ATXPP0276H3ZC) 4414027.00 -20.60 3504737.44 Thirty Five Lakh Four Thousand Seven Hundred and Thirty Seven
3.00 Ashwani Kumar(GSTN-02ADLPT4278R1ZO) 4414027.00 5.00 4634728.35 Fourty Six Lakh Thirty Four Thousand Seven Hundred and Twenty Eight
4.00 TC Construction(GSTN-02AANPC4769P2Z8) 4414027.00 -25.10 3306106.22 Thirty Three Lakh Six Thousand One Hundred and Six
5.00 PRABHJOT SINGH GOVT CONTRACTOR(GSTN-NA) 4414027.00 4.90 4630314.32 Fourty Six Lakh Thirty Thousand Three Hundred and Fourteen
6.00 Isha constructions(GSTN-NA) 4414027.00 -11.29 3915683.35 Thirty Nine Lakh Fifteen Thousand Six Hundred and Eighty Three
Lowest Amount Quoted BY: TC Construction(3306106.22)
BOQ Summary Details Tender Title: Job 2 Construction of Link road Harijan Basti Raipur Bare in Village Raipur Nichla km.0-0 to 0-800 Sub Head C.O Embankment, Retaining walls, P/L GSB, C.C Pavement and 30mm thick BC etc. in km 0-0 to 0-800 Under SCCP Tender ID: 2023_PWD_73627_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 TC Construction 3306106.22 L1
2 Balbir Singh Govt Contractor 3465011.20 L2
3 Vikas puri 3504737.44 L3
4 Isha constructions 3915683.35 L4
5 PRABHJOT SINGH GOVT CONTRACTOR 4630314.32 L5
6 Ashwani Kumar 4634728.35 L6
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .