Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.2 L+₹1,851.51 (0.44%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.2 L+₹3,282.23 (0.79%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹4.2 L
EMD Value
₹8,416
Closing Date
5 Jun 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishd Shamli
Construction of a road and drainage system in Ward No. 8, Ranjit Nagar from Kushalpal plot to Subey Singh house.
2026_DOLBU_1149926_5
228/E-T/PWC/2025-26
Open Tender
Civil Works
Percentage
30 days
Construction of a road and drainage system in Ward
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹8,416
23 Jul 2026
19 May 2026
6 Jun 2026
19 May 2026
5 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling of R.C.C ramp including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter (200 feet) all comp. the work etc. | 0.91 | Cum | 1,000 | ₹910 |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter tiles including all comp.the work. | 1.02 | Cum | 400 | ₹408 |
| 3 | Deduct the cost of old bricks | 70 | Nos | 4.2 | ₹294 |
| 4 | Ded the cost of old bricks/batts | 0.15 | Cum | 600 | ₹90 |
| 5 | Cartage of Ballast, Kankar, Coal, Grit or Sand etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 0.82 | Cum | 230.1 | ₹188.68 |
| 6 | Earth Work in Embankment (lead upto 8 km) in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth earth work in embenkment to in 20 cm layers including remming and dressing the surface to required levels and slops also including 1.50 m lift and 30 m lead. The earth form cutting to be used in making in embekment or to be disposited and spoil banks with in 30 M. distance as directed by the engineer in charge etc all complete as per the direction of engineer in charge. | 95.39 | Cum | 255.4 | ₹24,362.61 |
| 7 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc, required for proper completion of the work. | 2.11 | Cum | 4,850 | ₹10,233.5 |
| 8 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 3.66 | Cum | 5,750 | ₹21,045 |
| 9 | Providing, laying, spreading and compacting stone aggregates of 53 mm to 22.4 mm size to water bound macadam specification including spreading in uniform thickness, hand packing. rolling with 3 wheeled steel vibratory roller in stages to proper grade and carnber, applying and hrooming requisite type of screening binding Materials to fill up the interstices of course aggregate, watering and compacting to the required density | 24.23 | Cum | 3,656.8 | ₹88,604.26 |
| 10 | Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.5:3 in ce pavement (theckness as per design cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture/Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel laying and fixing o\f 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrator sand finished in. continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etel & concrete etc. | 36.34 | Cum | 7,300 | ₹2,65,282 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
technicaldocuments.pdf
Tender Documents • 1.48 MB
BOQ_2153162.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .