Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹888.6 CrAccepted-AOC | ₹888.6 Cr | L-1 | Accepted-AOC Quoted L-1 amount for the tender |
| 2 | L-2₹1237.9 Cr+₹349.3 Cr (39.3%)Rejected-Finance | ₹1237.9 Cr+₹349.3 Cr (39.3%) | L-2 | Rejected-Finance Not Quoted L-1 Rates |
| 3 | L-3₹12743.6 Cr+₹11855.0 Cr (1334.2%)Rejected-Finance NCC HOUSE MADHAPUR HYDERABAD 500 081 | HYDERABAD | HYDERABAD | TELANGANA | 500081 | ₹12743.6 Cr+₹11855.0 Cr (1334.2%) | L-3 | Rejected-Finance Not Quoted L-1 Rates |
| 4 | L-4₹1345.6 Cr+₹457.0 Cr (51.4%)Rejected-Finance 626 6TH FLOOR DLF TOWER A DLF TOWER 626 6TH FLOOR DLF TOWER A JASOLA JASOLA SOUTH DELHI DELHI 110076 | SOUTH DELHI | DELHI | 110076 | ₹1345.6 Cr+₹457.0 Cr (51.4%) | L-4 | Rejected-Finance Not Quoted L-1 Rates |
Tender Value
₹798.4 Cr
EMD Value
₹5 Cr
Closing Date
11 Jul 2023, 11:00 amClosed
Chief Engineer (MM)
O/o Chief Engineer (MM), HPSEBL, Vidyut Bhawan, Shimla-04
Loss Reduction Works under RDSS for South Zone
2023_HPSEB_73672_1
CE(MM)/RDSS-(P-3)/South Zone
Open Tender
Electrical Works
Tender cum Auction
730 days
South Zone of HPSEBL
As per Standard Bidding Document of RDSS
11 documents required · 11 mandatory
₹1,475
Sr. Accounts Officer, Banking, Vidyut Bhawan
₹5 Cr
O/o Chief Engineer (MM), Vidyut Bhawan, Shimla-04
27 Jul 2024
22 May 2023
11 Jul 2023
22 May 2023
11 Jul 2023
10 Jun 2023
29 May 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | AB Cabling works ,33KV,22KV,11KV & LT Line overhead Line Ab Cabling & other Cabling Works as per technical specification, approved drawings and scope of work. | - | - | - | - |
| 2 | LT AB Cable | - | - | - | - |
| 3 | LT AB Cable on poles [Size: (3x95 Sq, mm ) +70sqmm +16 sqmm{Inclusive 3% sagging & wastage) | - | - | - | - |
| 4 | LT AB Cable on poles [Size: (3x95 Sq, mm ) +70sqmm +16 sqmm{Inclusive 3% sagging & wastage) | 321.36 | km | - | - |
| 5 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) | 4,680 | No | - | - |
| 6 | Muffs with concerete filling | 4,680 | No | - | - |
| 7 | Stay Set Complete | 4,680 | No | - | - |
| 8 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) | 32,760 | Kg | - | - |
| 9 | Full Clamp for stay | 4,680 | No. | - | - |
| 10 | Anchoring Assembly for LT | 2,496 | No | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_110741.xls
BOQ Document • 2.64 MB
121368814.pdf
Tender Document • 0.35 MB
SBDPart2.pdf
Tender Document • 2.04 MB
TechnicalSpecifications.pdf
Tender Document • 11.91 MB
AddendumeRA.pdf
Tender Document • 3.79 MB
SBDPart1.pdf
Tender Document • 1.60 MB
121368817.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .