Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC | L1 | Accepted-AOC WORK ORDER | |
| 2 | L2₹52.3 L+₹2.5 L (4.98%)Rejected-Finance SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | P S STALIN CONTRACTOR L2 | VIHAAN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.0001)Providing Cement Concrete Road at Pannaipatty Main Road to Public Distribution Shop H/O T.Pannaipatti ESTIMATE COST : 30.96 Lakhs | |||||
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 175.5 | Cum | 2,598 ₹4,55,949 | 2,475 ₹4,34,362.5 Lowest |
| 3.00 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. | 150 | Sqm | 573 ₹85,950 | 546 ₹81,900 Lowest |
| 4.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 175.5 | Cum | 7,050 ₹12,37,275 | 6,715 ₹11,78,482.5 Lowest |
| 5.00 | Provision for Bittumenpad | 35.73 | sqm | 235 ₹8,396.55 | 224 ₹8,003.52 Lowest |
| 6.00Retaingwall | |||||
| 7.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 86 | Cum | 275 ₹23,650 | 262 ₹22,532 Lowest |
| 8.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. | 12.29 | Cum | 5,682 ₹69,831.78 | 5,412 ₹66,513.48 Lowest |
| 9.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal including all cost and conveyance of all materials and all labour charges etc complete | 114.25 | Cum | 5,969 ₹6,81,958.25 | 5,685 ₹6,49,511.25 Lowest |
| 10.00 | Supplying & Erecting for centering and shuttering charges for all PCC works including all cost and conveyance of all materials and all labour charges etc complete | 264.11 | sqm | 574 ₹1,51,599.14 | 547 ₹1,44,468.17 Lowest |
Tender Value
Refer Docs
EMD Value
₹51,000
Closing Date
6 Jan 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Providing CC Road and RCC Slab culvert in Reddiyarchatram block of Dindigul District TN05-42
2025_RDTN_637713_1
Roc.No.6746-2025-Tender
Open Tender
Civil Works
Item Wise
180 days
DRDA DINDIGUL
Providing CC Road and RCC Slab culvert in Reddiyarchatram block of Dindigul District TN05-42
2 documents required · 2 mandatory
₹0
₹51,000
DRDA DINDIGUL
12 Feb 2026
30 Dec 2025
6 Jan 2026
30 Dec 2025
6 Jan 2026
30 Dec 2025
2 Jan 2026
01)Providing Cement Concrete Road at Pannaipatty Main Road to Public Distribution Shop H/O T.Pannaipatti ESTIMATE COST : 30.96 Lakhs
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Bittumenpad
Retaingwall
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal including all cost and conveyance of all materials and all labour charges etc complete
Supplying & Erecting for centering and shuttering charges for all PCC works including all cost and conveyance of all materials and all labour charges etc complete
Provision for nameboard
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
02) Construction of 6.0m Span RCC Slab Culvert at Velanservaikaranpatty H/O Pannaipatty ESTIMATE COST : 19.60 Lakhs
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying Plain cement concrete 1:2:4 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block & Dirt wall
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Deck slab
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Above sill
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover, blocks and all other incidental charges etc complete, as per standard specification for culvert.for Bed block & Deck slab
Providing and fixing PVC EXPANSION JOINT in between Deck slabs over abutment and pier as shown in the Drawing including cost and conveyance of expansion Joints including Shalimar pad and joint sealant etc., Complete 1 joint.
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Gravel filling behind the Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density all other incidental charges etc., complete.
Providing and fixing 100 mm Dia PVC Seepage pipes of required lengths for abutment and retaining walls including cost and conveyance of all materials to work site. Cost and labour for semispherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing etc complete to drain the backfill as per standard specification.
Provision Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_763195.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .