| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-AOC 34 1 12 2F SAINIK VIHAR DEORI ROAD AGRA UP 282007 | AGRA | UTTAR PRADESH | 282007 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹27.0 L+₹3.3 L (14.1%)Rejected-Finance 129 PANCH SHEEL VENUE DEEP NAGAR JALANDHAR CANTT PB | JALANDHAR | PUNJAB | 144001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹40.5 L+₹16.8 L (71.0%)Rejected-Finance | L3 | Rejected-Finance Other than lowest |
Tender Value
Refer Docs
EMD Value
₹88,300
Closing Date
7 Jan 2021, 6:00 pmClosed
GE (WEST) AGRA
62 Station Road Agra Cantt
MANNING AND OPERATION AND MAINTENANCE AT STP WS BANGLOW NO 109 COD AGRA AND CONEY PARK PUMP HOUSE (OLD DISTRUBUTION PUMP HOUSE) WAC PUMP HOUSE AND SEWAGE INSTALLATION WAC WELL NO 1 AND 2 OF 17 PARA AND MAP PH II PUMP HOUSE MH PUMP HOUSE LALKURTI
2020_MES_400387_1
8012/740/E8
Open Tender
Civil Works
Item Rate
210 days
GE (WEST) AGRA
As per NIT
9 documents required · 9 mandatory
₹500
Yes
GE (WEST) AGRA
₹88,300
20 Feb 2021
3 Dec 2020
11 Jan 2021
3 Dec 2020
7 Jan 2021
17 Dec 2020
Amount
Manning, operation and comprehensive maintenance of sewage treatment plant installation (STP) 0.35 mld (350 cum/day) near 252 Ad Bty for its smooth functioning of sewage system including DG Set for all days including Sunday/Holidays Two shifts of 8 hours (0600 to 1400 hrs, 1400 hrs to 2200Hrs ) and routine maintenance and regular mixing of hypo solution liquid, operation of Chlorine dosing system, pump gland leakage, valve leakage, attending of minor electrical faults in panel/circuit and its rectification complete all as specified and directed.
Manning and operation water supply installation including DG Set and connected bore well with submersible pump set Pump House located at Banglow No-109 Pump House under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank, above installation building Two shifts of 8 hours (0600 to 1400 hrs and 1400 hrs to 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation including DG Set and connected bore well with submersible pump set Pump House located at WAC Line Pump House including MAP PH-II (WAC Line New Accn) under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank, above installation building Two shifts of 8 hours (0600 to 1400 hrs, 1400 hrs 2200 hrs and 2200 hrs to 0600 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation including DG Set and connected bore well with submersible pump set Pump House located at COD Agra old location under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank, above installation building One shift of 8 Hours as (0600 to 1400 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation including DG Set and connected bore well with submersible pump set Convey Park Pump House under GE (W) Agra such as pumps,electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank, above installation building Two shifts of 8 hours (0600 to 1400 hrs and 1400 hrs 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation and connected bore well with submersible pump set Pump House located at MH Pump House, Lal Kurti Pump House under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank, above installation building Two shifts of 8 hours (0600 to 1400 hrs ,1400 hrs to 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation and connected bore well with submersible pump set Pump House located at KLP Coloney pump house under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank , above installation building Two shifts of 8 hours (0600 to 1400 hrs, 1400 hrs to 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation and connected bore well with submersible pump set Pump House located at Signal Pump House and 4/1 WAC Pump House under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank , above installation building Two shifts of 8 hours (0600 to 1400 hrs, 1400 hrs to 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation water supply installation including DG set and connected bore well with submersible pump set RP Coloney sewage pump house under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton of water supply system, operation of valves of over head tank, Two shifts of 8 hours (0600 to 1400 hrs, 1400 hrs to 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night depending upon the availability of water from Ganga Water/Borewell one skilled pump operator cum technician per each shifts through out the month complete all as specified and directed.
Manning and operation of sewage well and connected bore well with submersible pump set WAC Line Well NO-1 & 2 and Para Bn near 17 Para well under GE (W) Agra such as pumps, electric control pannel internal and external electrificaiton, operation of valves, Two shifts of 8 hours (0600 to 1400 hrs, 1400 hrs to 2200 hrs) every day including holidays and Sundays during staggered timings in morining and evening and night one skilled pump operator cum technician per each shifts through out the month and rutine maintenance of pump gland leaking, valve leaking complete all as specified and directed.
Operation and maintenance of DG Set located at Butchery under GE (W) Agra in one shift of 08 hours as directed by Engineer-in-charge by employing skilled engine operator cum mechanic for its smooth functioning of DG Set for all days including Sunday/Holidays and cleaning of installation and removing grass from surrounding area and record of running specified in printed log sheet approved by Engineer-in-charge to be supplied by the contractor and routine maintenance of DG set complete all as specified and directed
Note for Ser No 1 to 11 (i) Diesel shall shall be issued by the department under Sch “B” free for running of DG set. Collection /transportation of Fuel for DG Set shall be sole responsibility of the contractor and the rate for the same are deemed to be included in the quoted item rate. (ii) Operator should be ITI qualified and with 3 years experience of same work i.e. water supply installations & DG Set etc. (iii) Maintenance of batteries such as filling of distilled water, replacement of battery terminals and other required materials for making functional of batteries. (iv) Operator will be responsible for testing of chlorination in water at pump house and required testing material & First Aid Box with all medicine for first aid would be provided by the contractor and also responsible for maintaining daily record of testing. (v) Contractor shall be responsible for cleaning of surrounding area of installations regularly . A certificate to this effect shall be produced every month for each plant seperatly by the Engg-in-charge duly countersigned by GE, failing which a rcovery @ Rs 2000/ - per month per plant shall be recovered from the contrector. (vi) Contractor has to provide uniform to the operator which is to be included in the item rate
(vii) Routine maintenance and detection of Chlorine Gas leakage, pump gland leakage, valve leakage, attending of minor electrical faults in panel/circuit and its rectification complete all as specified and directed shall be sole responsibility of the contractor and the rate for the same are deemed to be included in the quoted item rate. (viii) Operation of valves of over head tank & Pump set Raising Main and Distribution at different location as required and as directed by Engr-in Charge. (ix) Daily record Maintain of running of Motor Pump Sets and DG Set specified in printed log sheet approved by Engineer-in-charge shall be sole responsibility of the contractor. (x) Contractor will be responsible for rectification of leakage in pipe line, valve leakage, attending of electrical faults in panel/ circuit cable and its rectification.
M & L Dismantling of defective submersible pump set 2 HP with column assembly of any size/capacity including disconnecting electrical and water line connection complete and lifting it with the help of chain pulley, clamp, tripod etc. for repairing and re-fixing the same after making it serviceable including rethreading of column pipe/fixing of new column pipe and replacement of worn out nuts, bolts, washers etc complete all as specified and directed.
M & L for repair and servicing and testing of Pump set 10/12.5 Jockey pump set 3 phase 415 volts by opening end covers, replacing connection lead, greasing the both end of bearings, and replacement of bearings metaling/polishing of shaft, replacing worn out nut, bolts, gasket, air release valve key, gland stuffing box male/ female set, Rubber bush, descaling of impeller and replacing of impellor key & neck ring (Impellor guide) and other minor repair required and painting one coat with synthetic enamel paint with connected LT panel complete all as specified and directed .
Dismantling of defective submersible pump set 10 – 20 HP with column assembly of any size/capacity including disconnecting electrical and water line connection complete and lifting it with the help of chain pulley, clamp, tripod etc. for repairing and re-fixing the same after making it serviceable including rethreading of column pipe/fixing of new column pipe and replacement of worn out nuts, bolts, washers, bowl bush, bowl bush rubber, impeller seal ring, sleeve (off size), pump shaft etc complete all as specified and directed.
Dismantling of defective submersible pump set 5-7.5 HP with column assembly of any size/capacity including disconnecting electrical and water line connection complete and lifting it with the help of chain pulley, clamp, tripod etc. for repairing and re-fixing the same after making it serviceable including rethreading of column pipe/fixing of new column pipe and replacement of worn out nuts, bolts, washers etc complete all as specified and directed.
S&F in repair over load relay including fixing arrangement suitable for 2/3 HP submersible pump complete all as specified and directed.
S&F in repair Contactor including fixing arrangement suitable for 2/3HP submersible pump complete all as specified and directed.
S&F in repair Capacitor including fixing arrangement suitable for 2/3 HP submersible pump complete all as specified and directed.
S&F in repair over load relay including fixing arrangement suitable for 5/7.5 HP submersible pump complete all as specified and directed.
S&F in repair Contactor including fixing arrangement suitable for 5/7.5HP submersible pump complete all as specified and directed.
S&F in repair Capacitor including fixing arrangement suitable for5/7.5 HP submersible pump complete all as specified and directed.
S & F in repairs submersible cable PVC insulated copper conductor 2.5 Sqmm 3 core 1100 V grade complete all as specified and directed.
S & F in repairs submersible cable PVC insulated copper conductor 4.0 Sqmm 3 core 1100 V grade complete all as specified and directed.
S & F in repairs submersible cable PVC insulated copper conductor 6.0 Sqmm 3 core 1100 V grade complete all as specified and directed.
M&L for removing the sludge /concrete peices/bricks bats deposited inside the well of size 6M internal dia, 12.0M deep having sludge upto 6 feet + 1.0 Feet height from the bottom of well completely by manually without filling inside the pipe/suction/delivery line of pump and remove the sludge to a distance not more than 50 M from well after de-watering the sewage well with pump or any other method including removing the unwanted substances like polythene bags, chappels, plastic bottles etc complete all as directed by Engr-in-charge. Note :- (a) Contractor shall ensure the full safety of Labour working inside the well in all respect. (b) Safety belts, safety mask etc should be provided by the contractor for the persons working inside the well.
All as per item no-41- above but from the well 7.5 mtr deep and 6 mtr internal dia
All as per item no-41- above but from the well 7.0 mtr deep and 6 mtr internal dia
M & L for servicing and testing of sewage treatment plant air compressor set of capacity 10 to 15 HP, 3 phase 415 volts by opening end cover, replacement connection lead, greasing the both end of bearings and replacement of bearing, mateling/policing of shaft, replacing worn out nut bolts, gasket, air release valve key gland stuffing box male/female set, rubber bush, descalling of impeller and replacing of impellor key & neck ring (impellor guide) and other minor repair required and painting one coat of synthetic enamel paint with connected LT panel complete all as specified and directed
Opening of Non clog submersible pump and removing the blockage of pump from impellor/delivery pipe such as plastic material, poly bag other solid materials etc and reassembling of pump using new gasket complete all as specified and directed.
S & F in repairs cast iron butterfly valve for the 50 mm bore both ends flanged, with iron wheel (ISI marked) steel spindle, including nuts, bolts, washers and 3 mm thick rubber insertion sheet complete all as specified and directed.
Taking down non clog submersible sewage pump set 10 HP to 12.5 HP capacity any make and in any position alongwith column pipe from well after dewatering the well and disconnecting delivery end connection with the help of chain pully / tripod and cleaning the all parts and inspecting/checking the serviceability state of all parts and repairing / replacing the unserviceable parts with new parts, rewinding and reassembling the whole parts in its original position and lowering the pump set complete with column pipe in the well and fixing / connecting with existing delivery/suction complete all as specified and directed.
M&L for cleaning/opening the blockage in sewage line 200mm dia bore with sewage jet cleaning machine having capacity of cleaning up to 200 feet long in one attempt including earthworks complete all as specified and directed
M&L for cleaning/opening the blockage in sewage line 150mm dia bore with sewage jet cleaning machine having capacity of cleaning up to 200 feet long in one attempt including earthworks complete all as specified and directed
Supply only GI column pipe 100mm dia, Heavy grade, both end flanged 3 mtr long complete with nut bolts washer and rubber washer for fixing of pipe suitable for non clogging sewage submersible motor pump set complete all as specified and directed. Make- JINDAL/TATA /PRAKASH SURYA
Earthing complete for panel board with galvanized steel earth plate electrode 600 x 600 x 6mm thick buried directly in ground (earth pit not less than 4.00 meter below normal ground level) with top edge of the earth plate not less than 3.25 mtrs below normal ground level connected to and included GI earth strip of size 25x4 mm thick soldered and riveted to earth plate , GI strip will be protected by using 50mm bore GI pipe (light grade) earth plate to test point including flat iron clamps 25x3mm including bolts, nuts, & washers and earth plate surrounded by 150mm thick alternate layers of charcoal or cock dust mixed with common salt , 20mm bore medium grade watering pipe complete , the earthing including PCC pit in PCC 1:3:6 type C-1 (using 20mm graded stone aggregate ) cover of 50mm thick pre cast RCC 1:2:4 type B-1 (using 20mm graded stone aggregate ) duly re-inforced with 8mm dia deformed bars & 100mm C/C both ways , funel with wire mesh etc all as specified and shown in electrical plate No: 5 of SSR part-1, earth lead connected to earthing to test point and testing of earthing on completion complete all as directed.
Sampling and testing of water for the conformation of Desirable/permissible limit of following requirements for "DRINKING WATER" as per IS: 10500-1991 from Govt approved Laboratory at Delhi (Delhi Test House) including transportation of warer complete all as specified and directed (a) Bacteriological requirements: Testing of coliform Organisms/100ml, (b) Chemical requirements : Testing of colour Hazen Unit max, Odour, Taste, Turbidity NTU max, pH Value, Total Hardness (as CaCO3) mg/l max, Iron (as Fe) mg/l max. (c) Desirable Charactreristics Testing of dissolved Solids mg/l max, Calcium (as Ca) mg/l max, Magnesium (as Mg) mg/l. max, Copper (as Cu)mg/l max, Manganese (as Mn) mg/l max, Sulphate (as SO4) Mg/l max, Nitrate (as NO3) mg/l, phenolic compound mg/l max, mercury (as Mg) mg/l max, Cadmium (as Cd) Mg/l max, Selenium (as Se) mg/l max, Arsenic (as As) mg/l max, Cyanide (as CN) Mg/l max, Lead (as Pb) mg/l max, Zinc (as Zn) mg/l max , Chromium (as Cr+6)mg/l max, Mineral Oil, mg/l max. Note : Testing of raw water is mandatory at every quarter failing which a recovery @Rs 5000/- per test shall be recovered from the contractor.
Dismantling squirrel cage induction motor/pump 3 to 5 HP 3 phase 415 volts taking out burnt winding wire and rewinding the same with annealed copper winding wire, varnishing with vacuum impregnated method, drying in heat chamber including using cotton tape, insulation paper, cleaning slots and replace of bearing old nut bolts reassembling and testing complete all as specified and directed.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .